
1 minute read
REFITTING THE POWER TAKE-OFF HOUSING........................................................................................................J2
Front power take-off Zuidberg
Refitting the power take-off housing
– Refit the power take-off housing on the front lift. – Smear the fastening screws (1) of the housing with Loctite(273). – Tighten to 13,8± 1 daN·m. – Refit the front lift. Refer to section: "J1".
1
– Connect the power take-off housing by aligning the mark on the linking arm made upon removal.
Important: The linking shaft clams must be aligned.
– Tighten the screws of the linking arm at a torque of 14,7 daN.m. – Connect the hoses (1) of the cooler "1032". – Connect the supply harness of the "Y326" solenoid valve. – Refit the closing plate.

j214r000axion
– Top up the oil of the power take-off housing through the filling hole (1). Quantity of oil: 2,8 litres. To identify the type of oil, refer to the user manual. – Refit the protector (2). – Tighten the screws (3) to a torque of 1,5 daN·m. – Test the power take-off.
j26r000axion
2 1
3
1
Fig. 29
Y326 Y326
Fig. 30
