
4 minute read
Operation of the crusher plant
from CAT Armored Face Conveyor Impact roll crusher SB 0916 Hillsboro II Operation & Maintenance Manual
Check the following points during the test run: Perform test run of approx. 0.5 hours at no load:
Particularly check temperature of the bearings, running noises, leakages at bearing points, vibrations etc. Perform trial run under load:
Increase load gradually up to rated load. W hile doing so, check drives for rises in temperature, running noise, vibration, and leakages. Check function of the safety devices. Check for uniform and equal current consumption of the electric motors. Check that the gearboxes run smoothly. W arning! In case of faults, inexplicable noises and movements shut-off the crusher plant immediately over the emergency-stop switch! After checking the test run can be continued. W hen no faults are founded during the test run respectively all founded faults are eliminated the crusher plant can be put into operation.
Retighten screw connections
Select tightening torque Because of setting of the screw connections respectively the components, screws can become loose. The following mentioned screw connections of the crusher plant must be retightened after a first operating time of approx. 50 hours. Pay attention to the respective torque. Drive connections at the crusher plant: - Gearbox - Connecting flange at the roll - Gearbox - Motor - Gearbox - Gearbox holder Crusher housing - inlet side Crusher housing - outlet side Face connections pan - stageloader Attachments at the substructure with pan
Take the torque of the respective screw connection from the corresponding spare part drawing. If the spare part drawing gives no other information, the torques of table "Tightening torques - Screws resp. nuts with metric coarse thread DIN13" in chapter 5 are valid.
General
During normal operation please observe the following: Avoid to switch the crusher plant on and off without need. Feed the material at a fairly constant rate, if possible. Avoid overloading. Take care to ensure that the plant is serviced regularly.
Roll height adjustment
Danger! The passage height may only be adjusted when the crusher plant is in standstill! It must be secured against unauthorized restarting! The passage height under the roll can be adjusted in different positions by means of hydralic cylinders (three times 40mm = 120mm total). There are three hydraulic cylinders. Two of them will be fastened at the impact roll (piston rod at the bearing housing, piston base at the pan). The third cylinder will be fastened at the gearbox holder (piston rod at the holer for the gearbox, piston base at the holder for the pan). The hydraulic cylinders will be pressured via a hydraulic pump. Pressure fluid is oil (see "Hydraulic fluids" in chapter 5 "Technical data"). Important! The impact roll is in neutral position (lowest position) when ONE spacing plate of 40mm is located UNDER the bearing housing and the rest of the spacing plates (3 pcs.) are located ABOVE the bearing housing (see figure 14)! Notice! The spacing plate of 40mm under the bearing housing may not be removed! The desired passage height will be achieved by uniformly raising or lowering the impact roll by means of the hydraulic cylinders attached underneath the bearing housing. The following describes the procedure for raising the impact roll. Lowering is analogous (see figures 13,14). Notice! The quantity and thickness of the spacing plates located under respectively above the bearing housing must be the same on both sides! Loosen and remove the 4 clamping borders at the crusher housing.
Figure 13: Clamping borders
Clamping borders on both sides
Loosen the screw connections between crusher housing and bearing housing. The threaded rod is equipped with a hexagonal end (30mm width) on both sides. Hold against with a wrench so that the threaded rod does not rotate while the nut is being loosened.
Remove the required spacing plates located above the bearing housing on both sides. Take care that there are two bolts (∅20mm) on the top side of each spacing plate which come approx 10mm into the above located plate. Raising the impact roll is by means of the hydraulic cylinders located at the side of the crusher housing, under the bearing housing. As noted above they will be pressured by a hydraulic pump respectively the customer sided face hydraulic. Notice! Uneven raising of the bearing housings can lead to damages of the bearings and sealings. While raising the level difference on both sides must not be more than maximal 20mm! The above removed spacing plates will be placed under the respective bearing housing. The flow of hydraulic oil to the cylinders can be controlled over the stop valves. So, the uneven weight distribution can be compensated. Lower the impact roll slowly.
For this open the safety relief valve at the hydraulic pump slowly.
Take care that the impact roll does not cant while lowering. If necessary regulate with the stop valves. Fasten the bearing housing. Necessary torque = 2000Nm. The roll must be free to rotate. The distance between impact roll and side wall of housing must be equal allover the circumference. Press grease at both nipples on the front side of the bearing housing.
This protects the threaded rods against corrosion and the disassembly will become easier. The position of the gearbox must be fitted / adapted adequately. Perform a test run. (Figure 14: Roll height adjustment on the next page)
Figure 14: Roll height adjustment
2,3
1
1
4 1 Spacing plates 40mm thickness 2 Threaded rod 3 Collar nut 4 Hydraulic cylinder
Warning! No overpressure must be build up when the piston rod extends!
Danger! The entrance to the annulus of the cylinder must never be blocked, because the movements of the cylinder can build up pressure extremely. Serious injuries or even death can be the result when pressure passes out off defect lines!