1 minute read

TOWING THE MACHINE IN AN EMERGENCY

Template Date: 1994_04_29Template Name: OM_1_col

Alt+ to display template informationAlt= to hide template information

TRIM THIS EDGE

STEP 1

Place blocks under the machine wheels.

Removal of universal joints

Tools required

-One 19 mm wrench for hexagonal head screws -One towing bar

STEP 2

Mark both parts before uncoupling them. NOTE: Marking the parts will facilitate their reassembly.

STEP 3

Support the front axle universal joint using a sling attached to the undercarriage.

STEP 4

Towing

STEP 6

PH07408

PG03411 Attach a towing bar of suitable capacity to the stabilizer beam or to the dozer blade (depending on machine version).

PH07813 Remove the four screws from the front axle universal joint.

STEP 5

Repeat Steps 2 through 4 for the rear axle universal joint.

140

TRIM THIS EDGE LEFT PAGE

This article is from: