1 minute read

Solenoid Operated Valve

Next Article
Installation

Installation

F-code Section C-code

PS M6.2 6140 Lift Pump Assembly

Version no T-code

001

Do not operate motor/pump at relief valve setting any longer than is necessary (NO LONGER THAN 10 SECONDS AT ANY ONE PERIOD).

6.2. Solenoid Operated Valve

Clean and inspect valve cavity to be sure it is free of all foreign matter.

CAUTION

DO NOT bend or apply pressure to center stud or hold cartridge body any place but on flat sides of sub-assembly.

Be sure O ring and backup ring are in place. Apply a small amount of clean hydraulic oil to all three rings. Be sure strainer is in place. Hand screw subassembly in place and tighten to a maximum of 35 ft-lb for die cast metal. Assemble coil on spool assembly, and tighten nut to a maximum of 5 ftlb. Connect wires to terminals on coil.

F-code Section C-code

PS M6.2 6140 Lift Pump Assembly

Version no T-code

001

This article is from: