Water Feature 2 & 3- internship @ WohHup

Page 1

ARCHITECT

WF2AC

A-B-01

B.F

B.F

This check is made to review the general confromance on the design intention only, as this is a Design & Build Development. This does not relieve the contractor and Sub-Contractor of his contractual obligation and responsibilities to ensure the adequacy, integrity, suitability and practicality of the proposed detail design and that it is fit for its intended purpose and in accordance with the Employer's Requirements; and to confirm and correlate dimensions on site, select fabrications process and techniques of construction, coordinate his work with all other trades and execute his works in accordance with the best standard practice and Local Building Regulations as well as the approved plans. This in not an approval of additional claims or expenditure by Employer's Representative. RESUBMIT NOT IN ORDER

A-B-01

WF2BA

Referenced Drawing No. :

REVIEWED BY: _______________

COMMENTS ON ARCHITECTURAL ASPECTS ONLY NO COMMENT

1. Architect Reference dwg: XXX-XXX-XXXX 2. Structural Reference dwg: XXX-XXX-XXXX 3. WH-M&E Reference dwg: XXX-XXX-XXXX 4. ---

FOR APPROVAL RFA/JKM/ARC/000

DATE: DD.MM.YYYY

DATE RECEIVED: SHOP DRAWING REVIEW BY:

DATE: _______________

A P P R O V E D

CONSULTANTS

For Construction (AP)

VOID

ARCHITECT

with comments NO resubmission required (AC)

with comments, resubmission required (AR)

Rejected and Resubmit as per comments (RR)

DESIGN CONSULTANT INTERIOR DESIGN CONSULTANT STRUCTURAL CONSULTANT M&E CONSULTANT FACADE CONSULTANT LANDSCAPE ARCHITECT LIGHTING CONSULTANT CONSERVATION CONSULTANT Our comments and corrections made on this shop drawing do not relieve the Contractor / Sub-contractor of his contractual responsibilities. Work shall conform to all Drawings and Specifications. The Contractor is responsible for all correctness of dimensions and details in this drawing and for the full coordination of all aspect of the work

ELEC

KEY PLAN: EXIT FT

EXIT E

ELEC

PLB

ACMV for L2

VOID

SAN

ACMV RWDP @ L1 for L2

HR / WR

WF2AA

E

E

E

EXIT

EXIT

A-B-01

FT

HB

FT

A-B-01

WF2BC

WF2BB

A-B-01

B.8

GENERAL NOTES:

1. ALL DIMENSIONS ARE TO BE IN 'mm' UNLESS OTHERWISE STATED 2. ALL DIMENSIONS ARE SUBJECT TO SITE VERIFICATION. 3. DO NOT SCALE ON DRAWINGS. 4. ANY DISCREPANCY MUST BE REPORTED TO MAIN CONTRACTOR IMMEDIATELY. 5. ALL DRAWINGS MUST BE USED IN CONJUNCTION WITH M&E AND STRUCTURAL DRAWINGS.

815

B.8

A-B-01

WF2AB

CLIENT :

ARCHITECT :

1120

DESIGN CONSULTANT & INTERIOR DESIGNER :

MEP CONSULTANT :

1020

FL 106.90

B.9

STRUCTURAL CONSULTANT :

B.9 QUANTITY SURVEYOR :

LANDSCAPE ARCHITECT :

560

1095 FACADE CONSULTANT :

LIGHTING CONSULTANT

CONSERVATION CONSULTANT :

HB MAIN CONTRACTOR

WOH HUP (PRIVATE) LIMITED

BUILDING WITH INTEGRITY 217 Upper Bukit Timah Road Woh Hup Building Singapore 588185 T : 6385 8585 F : 6272 3322

PROJECT TITLE :

A-B-01

WF2BD

PROPOSED FLAT HOUSING DEVELOPMENT COMPRISING OF 2 BLOCKS OF 36 STOREY RESIDENTIAL FLATS (455 UNITS), 1 BLOCK OF SERVICED APARTMENT (80 UNITS) WITH 3 BASEMENT CARPARK, SWIMMING POOL, COMMUNAL FACILITIES AND RESTORATION OF EXISTING CONSERVATION WAREHOUSE BUILDINGS WITH COMMERCIAL ACTIVITIES ON LOT 01637L TS21 AT JIAK KIM STREET (SINGAPORE RIVER PLANNING AREA)

WATER FEATURE 2 PLAN DWG ZONE A Scale 1:30 A1

DRAWING TITLE:

Level 1 E-Deck

WATER FEATURE 2 PLAN AND TSO

WATER FEATURE 2 PLAN DWG ZONE A Scale 1:30 A1

DRAWN HENG YH

CHECKED

SCALE

DATE

DRAWING NO.

SIZE

A1

REV.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.