Proceedings Wednesday 13th April

Page 1

Table of Contents, Wednesday 13th April th Heavy Lifting in 2,500 m water depth, Henk de Boo van Uijen, Design, construction and commissioning of a heavy lift offshore crane, Arjo van Putten, Flexible load handling solutions for multi purpose vessels, Tønnes Seierstad

Wednesday 13 April

Page 3 Page 27 Page 76

New risk based bolt maintenance procedures – improved reliability/reduced life cost of offshore cranes, Rod Corbett Special engineered bolts for critical joints in the lifting industry, Ragnar Sandve Lifting and handling remote monitoring and diagnostic solutions, Aaron J. Spak W A RFID inspection system the new Crosby Quic ‐ Check, inspection and identification system , Frédéric Crynen Temporary lifting facilities for the BP Magnus crane replacement, Gordon Mccombie

Page 95 Page 120 Page 143 Page 169 Page 192

Mob‐boat handling with offshore cranes – combination of design parameter Tor Raknestangen Training & competence in crane transfer operations; the importance of being prepared, David Brittan Lifting persons with carriers suspended from offshore cranes application of European commission guidance document, Gunnar Matre

Page 227

Reception given by the municipality of Stavanger in the Stavanger Maritime Museum Local beer tasting program with small tapas

Page 324

Page 246 Page 297


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.