How to encourage citizens to bike more?
The relationship The Therelationship relationship between between between cyclists’cyclists’ safety cyclists’ (S) safety safety and(S) canopy (S)and andcanopy ofcanopy vegetation ofofvegetation vegetation (C) (C) (C) ·S= f(C)·S= ·S=f(C) f(C)
Unlimited Unlimited Unlimited
Canopy Canopy ofCanopy small of shurbs of small small shurbs shurbs within buffer within within area buffer buffer area area
Unlimitness Unlimitness Unlimitness to branch to to branch branch beyond 2500mm beyond beyond 2500mm 2500mm
Width of buffers and Cyclists' confidences
P
Wider Buffer Wider Wider Buffer Buffer
Branch beyond 2500mm
Small shurbs
Shape in Green buffers andtototobranch Cyclists' Unlimited Unlimited Unlimited of Vegetation Canopy Canopy Canopy ofof of small small small shurbs shurbs shurbs Unlimitness Unlimitness Unlimitness branch branch within within within buffer buffer buffer area area area beyond beyond beyond 2500mm 2500mm 2500mm confidences
No No No buffer buffer buffer
Buffer Buffer Buffer
Colourful cover
Mark line
No bike lane
The relationship The The relationship relationship between between between cyclists’ cyclists’ cyclists’ safety safety (S) safety and (S)(S) canopy and and canopy canopy of vegetation of vegetation of vegetation (C) (C)(C) ·S= f(C) ·S=·S= f(C) f(C)
Wide bike lane
Thin bike lane
No bike lane
Surface of bike lane and Cyclists' comforts
Unlimitness Unlimitness Unlimitness to branch to branch to branch beyond beyond 2500mm beyond 2500mm 2500mm
Width of bike lane and Cyclists' comforts
No buffers (include green buffers) Wider Wider Wider Buffer Buffer Buffer
No bike lane Mark line(1.4m bike lane) 15m wide road 18m wide road 20m wide road 35m wide road Trail
What influence the hierarchy of bike lane?
A/B
WiderWider Buffer Wider Buffer Buffer
Destination of cyclists Transfer in corridor
Traffic Junction
Corridor 4- 5
Darebin
Confidence elements in corridor 5
4
Comfort elements in corridor 4 5
5
Comfort elements in corridor 5 4 min 1.3 km
Edgars Creek
1 min 100 m
1 min Darebin Creek 450 m
4 Phase 2
Phase 1
Phase 3
Further study
Phase 3
Phase 1 1 min 450 m
Transfer in corridor A and B Traffic Junction
1
5
5
Merri Creek
Destination of cyclists BufferBuffer Buffer
Confidence elements in corridor 4
4
The relationship The The relationship relationship between between between cyclists’ cyclists’ cyclists’ safety safety (S) safety and (S)(S) whether and and whether whether thesethese isthese buffers is buffers is buffers (W) (W)(W) ·S= f(W) ·S=·S= f(W) f(W)
No buffer No No buffer buffer
Not in 3pm-8pm
4
On-street parking
What influence riders' comfort?
Canopy Canopy Canopy of small of small of shurbs small shurbs shurbs withinwithin buffer within buffer area buffer area area
4
Off-street parking
On street parking and Cyclists' confidences
Unlimited Unlimited Unlimited
5
The The The relationship relationship relationship between between between cyclists’ cyclists’ cyclists’ safety safety safety (S) (S) (S) and and and whether whether whether these these these isis is buffers buffers buffers (W) (W) (W) ·S= ·S= ·S= f(W) f(W) f(W)
Remove parking
Parking collision
Door opening conflict
Buffer Buffer Buffer
Unlimited vegetation
No buffer
Thin buffer
Wide buffer
The relationship The Therelationship relationship between between between cyclists’cyclists’ safety cyclists’ (S) safety safety and(S) whether (S)and andwhether these whether isthese buffers theseis isbuffers (W) buffers(W) (W) ·S= f(W) ·S= ·S=f(W) f(W)
P
4
The The The relationship relationship relationship between between between cyclists’ cyclists’ cyclists’ safety safety safety (S) (S) (S) and and and canopy canopy canopy ofof of vegetation vegetation vegetation (C) (C) (C) ·S= ·S= ·S= f(C) f(C) f(C)
What influence riders' confidence?
No bufferNoNo buffer buffer
Victoria
In this project, these local residents would be encouraged to bike more, which is the purpose of this project. The concept, Improving riders' confidence and comforts and identify the hierarchy of bike lanes would be used. The on-street parking would be removed, separated buffer would be placed, high-quality surfaces of bike lanes would be placed and spaces of bike lanes would be widened.
Melbourne
What is the location of this project?
What is the intention of this project?
Hierarchy element in corridor 4 Northern College 5 min of the Arts 1.1 km & Technology
Commercial zone Park land Educational zone Industrial zone
4
4/7
9 min Shopping 2.5 km centre
3 min Preston Market 500m 1 min Melbourne 280m Polytechnic
To Merri Creek
3/5 Phase 3
3 min 1 km Blake Park
5/8 Phase 1
Hierarchy element in corridor 5
Phase 2
Further study
Phase 3
To Darebin Creek
Phase 1
Phase 2