GSI In Progress
2017 PWD Summer Internship Clare Marshall and Hakeem Wilson

3 Rain Gardens
2TreeTrenches
1 Stormwater Planter
1 Swale
August: Dr.Tanner G. Duckrey Public School
View of tennis courts from 16th Street
August:
Total DA(proposed):
● School Parcel: 134,918 SF
● Streets Disconnection: 208,087 SF
Required Storage:
*managing 1.5” rainfall depth
● Surface: 16,865 CF
● Subsurface: 26,011 CF
● Available surface storage (HydroCAD): 6112 CF
6” ponding
~2’soil
● Total subsurface storage needed: 36,764 CF ○ Constraints: available area and depth
Stone storage not viable → explore other options!
R-Tank (ACF)
● Double + Mini Combination
● Storage volume = 10.36 CF per tank
● 95% void internal area
● Storm Sizing:
○ 15 min peak intensity (2.5 in/hr)
○ 10 yr storm (6.95 in/hr)
● Surcharging:
○ Inlets vs. manholes
● Maintaining min. velocity