a rchitecture

DATE OF BIRTH
19 th december 1996
PLACE OF BIRTH
Turin (TO)
Italian NATIONALITY
ADDRESS
Via Almese, 92, Collegno (TO), Italy
PHONE
+39 3319119243
+56 9 38728986
greta.morano@gmail.com
PEC
g.morano@architettitorinopec.it
Collaboration - IPE Progetti Group
nov 2022 - now
Collaboration in an architecture and engineering firm of about 50-60 people, working in connection with city councils, to develop public projects, working with private firms to develop infrastructures as ski stations, naval yards, private buildings, working with BIM metodology.
Collaboration - Me Engineering
oct 2020 - oct 2022
Collaboration in an architecture and engineering firm of about 40 people. Project development from the initial project to site visits and completion of the construction of the building.
Final project - The invisibles’ right to sustainability, a case study of Santiago, Chile
sept 2020 - jul 2021
Thesis project interested in housing deficit problems in Chile, with an attention to possible future sustainable developments.
Internship - Qbo architects
jan - sept 2020
Development of ongoing orders for the improvement. The internship was followed by a collaboration of some months.
Internship - Bodino srl
mar - jun 2018
Internship connected to the university course. Development within the company project for the Cityringen Metro, Copenhagen.
ITALIAN native
ADVANCED - ENGLISH
EXCHANGE STUDENT - Colorado, USA
FIRST Certificate in English language B2
ADVANCED - SPANISH
DELE Cervantes, certificación de idioma español B1
ERASMUS PROGRAM - Chile
BASIC - FRENCH
IN PROGRESS - PORTUGUESE
Microsoft Office: Word, Excel, Power Point
Microsoft Project
Autocad
Sketchup
Lumion
Adobe Photoshop, Illustrator, Indesign
Adobe Premier Pro
Adobe After Effects
Archicad
Revit
Rhino
V-Ray
Enscape
“We put one foot forward and then the other. Lift our eyes to the snarl and smile of the world once more. Think. Act. Feel.
Add our little consequence to the tides of good and evil that flood and drain the world.
Drag our shadowed crosses into the hope of another night.
Push our brave hearts into the promise of a new day.
With love: the passionate search for a truth other than our own.
With longing: the pure, ineffable yearning to be saved. For so long as fate keeps waiting, we live on.”
March 2017
connected Paris with Flanders and Germany. During the last decades of XX century the fluvial infrastructures of this area where dismitted, this portion of Paris became the place in which a big number of settlement strategies were developed. The initial purpose of this project was to create something, a place, where people could meet and spend some time together, but also a building that had to include appartments.
The shape of the building, the disposition of the spaces and the study of the facade were determined by the natural elements.
The sun took a big part in this project and the form of the building is instructed by the solar arch. In the same way also the principal facade is designed to receive a large amount of light. The rooms instead were arranged studying the winds’ path, in order to facilitate the natural ventilation.
The first phase of the Masterplan involves the creation of thematic paths for cyclists and pedestrians aimed at improving the park system and the surrounding area. Beyond this, key points were identified where there was the need to intervene from an architectural and functional point of view (strengthening of the public network, insertion of intramodal nodes) to make the whole system more functional.
The representation of Carmen was born from the desire to emphasize the character of the protagonist. Carmen is a woman created and described with a strong temperament, she is the archetype of the independent, dangerous and indomitable woman who flaunts her charm to pursue her own goals, sheis a woman who puts her freedom first and defends it without fear. In our representation, therefore, Carmen is the personification of feminism, of the free and emancipated woman, a role that can find more emphasis if contextualized in a place, Turkey, and in a culture in which women’s rights are not always recognised.
s cenogra PH y P roject “ c armen ”
from Georges Bizet
The whorkshop planned, in an initial part, the study of the indigenous population whose territory was the project area.
In the second part of the workshop, a revitalisation project was proposed, which could attract tourists throughout the year.
I tried to exploit the natural space above all, encouraging people to use it more.
The Mapuche territory is conceived as a totality and meeting of four lands. Each land has territorial identities, the Mapuche is related to different natural contexts.
Mapuche settlements are composed of family groups and clans that use the land according to its geography, natural composition and topographic landmarks.
The core of the system is the family, which lives in the “ruca” and its architecture varies according to the geographical location.
Rewe: point where there is the tension relationship with the Wenu Mapu.
Fire: determines the center of activity in common space.
The connections with the two main axes are present and are easily visible.
The new project involves the insertion of a craft market (1) with an amphitheater that looks at the lake. There is also a restaurant (2) and a sports rental shop (3).
The central pole of the project is the amphitheater, it favourites, more than in the other spaces, the meeting with the local population.
Orizontal axis: relation between the cardinal points.
Vertical axis: relationship with Wenu Mapu. (sky)
The fundamental idea of the project is that the lake remains an isolated place in any case from vehicular traffic. You can get to the lake with vehicles in conjunction with the two docks.
The dark green space will be a space where new trees, especially araucarias, will be planted. In the case of clearest greens, it will be a natural area where the green will be treated.
July 2021
The theme of this degree project arosed from real lived experiences, such as the Social Outbreak in Chile, where the problem of access to a decent house emerged. The right to a roof, which is not subject to natural disasters, to eradications, is not available for everyone. After a pandemic lasting more than a year, the right of having a roof becomes even more relevant, especially because the house becomes the place where people live their lives. How did those who share 9 square meters with the entire family live this year?
STEP 1
Creation of foundations
STEP 2
Cladding the concrete curb and fixing the supporting structure.
STEP 3
Creation of the frame, of the windows’ and doors’ structures and of the braces.
STEP 4
Addition of the electrowelded mesh, fixed to the bearing structure.
With a big help from:
STEP 5
The structure is filled in mud, straw and additives Then there is the addition of the insulating layer.
STEP 6
Internal and external finishing.
For more informations about the thesis, scan the QR code! (Ita, Eng, Es)
Here I’d like to put a taste of my renders, made especially with Archicad Cinerendering, Lumion, V-Ray.
Residencial building in Turin, the 30’s industrial building’s structure is maintained.
This section is dedicated to all the other graphic works. I like to get involved and develop new ideas in this field, especially if it is about selling a product and looking for attractive graphics.
The other part of me is all about travel and cooking; about the last one someone would say: “as a good italian”.
This is me, a little volcanic, a little cheerful and extremerly positive. I find myself comfortable when I speak spanish or english too. I’m constantly looking for new experiences, new contacts and new ways to see the world.
You can find me here!