Erp tuv test report scop eco inv 13 a

Page 1

TEST REPORT PPP 18025A: 2014 TÜV SÜD Test program for ErP – for Heat Pump Space Heater using electricity Ecodesign requirement for space heaters and combination heaters Implementation measure EU No. 813/2013 Report reference No. ....................... :

64.181.16.03237.01 Rev.01

Date of issue ................................... :

2016-07-24

Project handler ................................ :

Plum Li

Testing laboratory............................ :

TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West, Guangzhou 510656, P. R. China Energy: 5th Yandong Rd, Dayan Industrial Zone, Huangpu Town, Zhongshan City, Guangdong, China For noise tests: No.3, Tiantaiyi Road, Kaitai Avenue, Science City, Guangzhou, P.R.China

Address .......................................... : Testing location ............................... :

Client .............................................. :

Gorenje d.d.

Client number.................................. :

49214

Address .......................................... :

Partizanska 12, 3320 Velenje, Slovenia

Contact person…… ..........................

Mr. Mario Nikic

Standard ......................................... :

This TUV SUD test report form is based on the following requirements (EU) 813/2013: 2013-08-02 OJ (2014/C 207/02): 2014-07-03

TRF originated by. ........................... :

TÜV SÜD Product Service GmbH, Mr. Gary Sun

Copyright blank test report ............... :

This test report is based on the content of the standard (see above). The test report considered selected clauses of the a.m. standard(s) and experience gained with product testing. It was prepared by TÜV SÜD Product Service GmbH. TUV SUD Group takes no responsibility for and will not assume liability for damages resulting from the reader’s interpretation of the reproduced material due to its placement and context.

Test procedure ............................... :

TÜV Mark,

Non-standard test method................ :

No

National deviations .......................... :

None

Number of pages (Report) ............... :

25

Number of pages (Attachments)....... :

6

EU-Directive,

without certification

Yes, see details under Summary

Compiled by .... : Plum Li

Approved by .... : Gary Sun

(+ signature)

(+ signature)

Test Report based on TUV_PPP 18025A:2014 Rev. 00 / 2014-09


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.