2022-2023 Selected Works Shop Drawings Portfolio

Page 1

GNEIS AKMALA RIZAL PURBA,S.Ars SELECTED WORKS SHOP DRAWING S EDITION ARCHITECTURE
PORTFOLIO

PURBA

Tasikmalaya,6 August 2000

my portfolio, where innovation meets precision in design.Mycollectionshowcasesinthisseriesofarchitecturalprojectsbrought tolifethroughthemeticulousprocessofBuildingInformationModeling(BIM) usingRevitsoftware.

With afocusonachievingahighlevelofdetailandaccuracy,myutilizationof BIM extends to Level of Development (LOD) 350, ensuring comprehensive visualizationandanalysisateverystageofdevelopment.

Withinthisportfolio,you'lldiscoveranarrayofarchitecturalworksrangingfrom residentialbuildingstocommercialcomplexes,eachmeticulouslycraftedusing Revit'spowerful BIM capabilities. My approach emphasizes not only the final architecturalformbutalsotheunderlyingstructuralintegrityandenvironmental considerations

Bandung,Indonesia akmalagneis06@gmailcom

Instagramcom/gneisakmala issuu.com/gneisakmala

GNEIS AKMALA RIZAL
BIOGRAPHY RESUME

What is BIM LOD?

BIM Level of Development (LOD) is an industry standard that defines how the 3D geometry of the building modelcanachievedifferentlevelsofrefinement,isusedasa measureoftheservicelevelrequired.

LOD 100: This is the startingpoint with basic ideasabout size andlocationbutnotmuchdetail

LOD 200:Here,thingsgetmorespecificwithbettershapesand attributesforthebuildingparts

LOD 300:Now we’re gettingdetailed,withexactsizes,shapes, andhoweverythingfitstogether

LOD 400: This is super detailed, showing how to make, put together,andinstallparts.

LOD 500: The top level shows the final building with all the nitty-gritty details and documents like manuals and warranties.

1

TABLE OF CONTENTS

The content in this portfolio consist explanations of BIM Technical shop drawings.

• BIOGRAPHY RESUME PROLOGUE

• Definition of BIM LOD (Level Of Development)

TECHNICAL SHOP DRAWINGS

• SOREANG AUTOMOTIVE SCHOOL

Floorplans and some specific details

2 3

• MR.H HOUSE

Floorplans and some specific details

4

• CASIO CO-WORKING SPACE

Floorplans and some specific details

• EATERY UPGRADE

Floorplans and some specific details

I invite you to explore My portfolio and witness the synergy between creativity and technology, where each project embodies our dedication to excellence in architectural design through the lens of BIM Revit.

01. SOREANG AUTOMOTIVE SCHOOL

Architecture Final Project

Site : Soreang,Bandung Regency

Tipology : Vocational High School

Status : Semi-Fictive Project

SOREANG AUTOMOTIVE SCHOOL

2022| ARCHITECTURE FINAL PROJECT

/.Structural

Thestructuralplanforthisbuildinginvolvesaframestructure,combiningreinforcedconcrete structurewithsteelconstructionintheworkshoppracticearea Choosingthistypeofstructure for wide-span buildings will result in efficiency, providing a large open space suitable for buildingswithahighusercapacity

Concrete Column Slanted
Column
Mini Pile Foundation

/.The movement ofcommunitygroupswithinthebuildingareaisdividedintoseveral groups, as explained on the previous page The positive synergy among these cohesive activitygroupswillresultinagoodandhealthyenvironment.

02. MR.H HOUSE

Design and build project of residential house

Site : Singgasana Pradana,Bandung

Tipology : Living House

Status : Finished

Built Into Reality.

The project commenced in February 2022 and was completed in January 2023. The concept applied to the building follows the principles of modern architecture, where openings are predominantly designed, using natural finishing materials such as wood and natural stone (granite).

Family happines.

With heartfelt sincerity, this new residential home is presented as a gift to bring happiness to the family. this home is envisioned to be a place where beautiful memories are created and family bonds strengthened, making every moment precious and meaningful for each family member

03. CASIO CO-WORKING SPACE

Design and build project of Work Space

Site : Jl.Bawean,Bandung

Tipology : Working Space

Status : Finished

Built Into Reality.

Pembangunan

Dilaksanakan pada awal bulan Mei 2023,setelah finalisasi desain serta pembuatan dokumen gambar kerja terselesaikan, maka persiapan pelaksanaan Pembangunan segera dimulai. Selama proses pelaksanaan melewati berbagai lintas koordinasi antara desainer dengan penanggung jawab tim lapangan

Problem Solving.

Selama,

Proses pelaksanaan di lapangan berlangsung,tentunya melalui berbagai macam hal,kendala serta pemecahan masalah dari berbagai pihak terkait Namun itu semua tentunya dapat terselesaikan dengan baik,hingga pada pertengahan bulan September, CoWorking Space project ini dapat rampung.

05. EATERY UPGRADE

Steakhouse Renovation

Site : Jl.Riau-Bandung

Tipology : Restaurant

Status : Finished

LEGENDA |

A. POS JAGA

B. AREA PARKIR

C. LOADING DOCK

D. AREA VIP

E. KOMUNAL UTAMA

F. TRANSIT AREA

G. PLAYGROUND

H. AREA TRANSISI

I. KOMUNAL 2

J. SEMI - OUTDOOR 1

K. OUTDOOR AREA

L. SEMI - OUTDOOR 2

M. STAGE PERFORMANCE

N. BAR PREPARATION

O. TEPPANYAKI KITCHEN

P. COMMON KITCHEN

Penataan Tata ruang pada keseluruhan bangunan terutama pada bangunan Komunal 2 yang dirancang ulang,guna memenuhi kebutuhan alur kegiatan pengunjung dengan memperhatikan flow activity serta besaran ruangan yang nantinya akan memengaruhi pada jumlah kapasitas yang dapat ditampung pada sebuah ruangan

Lahan seluas 581,9 m2 tersebut terbagi secara menyeluruh untuk setiap aktifitas pengunjung mulai dari kedatangan hingga kepulangan.

B D E F G H I J K L M O N A C P

Perancangan

Struktur bangunan pada area Komunal 2 ini menggunakan sistem rangka dengan perpaduan rangka baja dan beton bertulang. Pondasi footplat sebagai lower structure bangunan dipilih untuk perkuatan bangunan dengan mempertimbangkan kekuatan dan ekonomisme pada pembiayaan Pengkombinasian material struktur-struktur tersebut disatupadukan sehingga menciptakan sebuah bangunan yang menjadi satu kesatuan yang kokoh.

Built Into Reality.

Pembangunan

Tahap 1 dilaksanakan pada pertengahan bulan September 2023 Dimulai dengan finalisasi konsep perancangan kepada pihak owner hingga pelaksanaan berlangsung,tahapan demi tahapan Pembangunan dikerjakan,pembuatan galian pondasi,perencanaan struktur,Pembangunan sistem struktur,perencanaan sanitasi,dan MEP secara menyeluruh dikerjakan dan dikoordinasikan oleh berbagai pihak pelaksana yang mengemban tanggung jawab.

Consumer Convenience.

/.Pada akhirnya

Dengan bersemangat, restoran baru ini hadir sebagai sebuah persembahan untuk meningkatkan kenyamanan pelanggan. Dibangun dengan desain yang memperhatikan setiap detail, mulai dari suasana interior yang hangat hingga tata letak yang ergonomis, restoran ini bertujuan untuk menciptakan pengalaman makan yang tak terlupakan..

GNEIS AKMALA RIZAL PURBA akmalagneis06@gmail.com @gneisakmala

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.