5. Estimating Software Intensive System of Systems The primary purpose of software estimation is not to predict a project’s outcome; it is to determine whether a project’s targets are realistic enough to allow the project to be controlled to meet them ‒ Steve McConnell Papers on Estimating Software Intensive System of Systems 635. 636. 637.
638. 639.
640. 641. 642.
643. 644.
645. 646. 647. 648. 649. 650. 651. 652. 653. 654.
“The Psychology of Cost Estimating,” Andy Price, NASA/Marshall Space Flight Center, Engineering Cost Office, June 10, 2015 “Assuring Credibility in the Cost Estimate,” Henry Apgar, June 2016 ICEAA Workshop, Portlan, OR. “Addressing Uncertainty in Estimating the Cost for a Product-Service-System Delivering Availability: Epistemology and Ontology, Yee Mey Goh, Linda Newnes, Ettore Settanni, Nils Thenent, and Glenn Parry, Chapter 7 of Ontology Modeling in Physical Asset Integrity Management, Springer International Publishing, 2015 “Determinism and the Paradox of Predictability,” Stefan Rummens and Stefaan Cuypers, Erkenntnis March 2010, Volume 72, Issue 2, pp. 233–249. “A simulation study of the model evaluation criterion MMRE,” Tron Foss, Erik Stensrud, Barbara Kitchenham, Ingunn Myrtveit, IEEE Transactions on Software Engineering, Volume: 29, Issue: 11, Nov. 2003. “COBRA: A Hybrid Method for Software Cost Estimation, Benchmarking, and Risk Assessment,” Lionel C. Briand, Khaled El Emam, Frank Bomarius, “Does Calibration Improve Predictive Accuracy?” David Peters, George Dewey, Daniel Ferens, and David Christensen, CrossTalk, April 2000, pp. 14‒17. “An Investigation of Nonparametric Data Mining Techniques for Acquisition Cost Estimating,” Capt. Gregory E. Brown, USAF, and Edward D. White, Defense Acquisition Research Journal, April 2017, Volume 24, Number 2, pp. 302‒332. “Enhanced Scenario-Based Method For Cost Risk Analysis: Theory, Application, and Implementation,” Mr. Peter Braxton, Dr. Brian Flynn, Dr. Paul Garvey, and Mr. Richard Lee, SCEA/ISPA Joint Annual Conference and Training Workshop, 2012 “Effort Estimation in Incremental Software Development Projects Using Function Points,” José Antonio Pow-Sang and Ricardo Imbert, Computer Applications for Software Engineering, Disaster Recovery, and Business Continuity, Springer, Volume 304 pp. 458 ‒ 465. “Monte-Carlo simulation of information system project performance,” Weihua Yanga and Cong Tian, Systems Engineering Procedia, 3 (2012) 340 – 345. “Easy Function Points – ‘Smart’ Approximation Technique for the IFPUG and COSMIC Methods,” Luca Santillo, 2012 Joint Conference of the 22nd International Workshop on Software Measurement and the 2012 Seventh International Conference on Software Process and Product Measurement, 2012 “Automated Function Points: Critical Evaluation and Discussion,” Luigi Lavazza, IEEE/ACM International Workshop on Emerging Trends in Software Metrics, 2015. “A Software Maintenance Project Size Estimation Tool Based On Cosmic Full Function Point,” Chi-Jui Lin and Dow-Ming Yeh, International Computer Symposium (ICS), 2016. “An Empirical Study on the Estimation of Size and Complexity of Software Applications with Function th Points Analysis,” Luís M. Alves, Sérgio Oliveira, Pedro Ribeiro, and Ricardo J. Machado, 14 International Conference on Computational Science and Its Applications, 2014 “Extending Function Point Analysis to Object-Oriented Requirements Specifications,” Vahan Harput, th Hermann Kaindl, and Stefan Kramer, 11 International Software Metrics Symposium, 2005 “Adapting Function Point Analysis to Estimate Data Mart Size,” Angélica Toffano Calazans, Káthia Marçal th de Oliveira, and Rildo Ribeiro dos Santos, 10 International Symposium on Software Metrics, 2004. “The Internal Revenue Service Function Point Analysis Program,” Charles Tichenor, IEEE Computer Software and Applications Conference, 1997 “Applications of Monte Carlo,” Herman Kahn, RM-1237-AEC, Atomic Energy Commission, 19 April 1954. “Project Decision Analysis Process,” Lev Virine, Intaver Institute, January 2014
Integration of Agile and Earned Value Management
31