Aeolian 2018

Page 8

CAMPUS UPDATES |

GSW GETS A CAMPUS FACELIFT

Outdoor Basketball Court

Major improvements have been made to Georgia Southwestern’s campus over the past year with numerous ongoing projects that both accelerate academic success and contribute to the overall student life experience.

Education Lobby An outdoor basketball court was installed in Fall 2018 to enhance the campus experience for students with funds provided by the Student Government Association. The first game played on the new court was C-A-N-E-S with GSW President Neal Weaver and a special selected group of students.

Cafeteria

The School of Education received new carpet and furniture in the downstairs lobby and upstairs lounging areas.

Biology Lab

The Science Building underwent a complete biology lab renovation, including state-of-the-art equipment, with funds from the GSW Foundation.

6 | G SW. E D U

The cafeteria received upgraded pendant lights, new seating with charging stations, a fresh paint job, tile flooring, and chilling stations to keep the food fresh longer. Additionally, a wall mural was installed reflecting the new campaign message, Take Tomorrow By Storm.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.