The design respects the past by maintaining the original 1928 historic building and lawn while improving the education experience for all users. The vision also shapes the future with stateof-the-art “next generation” academic and athletic facilities. The shear magnitude of the project posed a design challenge for the team. With so many buildings and exterior areas impacted, the need to keep the high school operational and phase the work into construction and ultimately into use has been of paramount focus.

RESPONSIBILITIES:

• Manage Construction administration for contractor and construction schedule.

• Manage structural and concrete coordination.

• Supervise and oversee 80+ contractors.

• Oversee steel and concrete elements for fabrication.

• Manage RFIs, submittals, and review all shop drawings.

• Manage architect and engineers for design conditions.

• Review all DSA drawings for construction.

LOCATION: Beverly Hills, California

PROGRAM: Higher Education

SIZE: 510,000 SF

EXISTING 5/8” REBAR

EXISTING BEAM

J HOOKS- 6” MIN. EMBED INTO EXISTING BEAM

#4 STIRRUPS FOR NEW BEAM

(2) #6 EPOXY DOWELS EACH WAY

NEW 4X4 HSS POST PER CCD-B4-088 EXISTING CONCRETE WALLS EXISTING BRICK WALLS

W 14X68 BEAM IN CONFLICT WITH DRAG CONNECTION EXISTING CORBEL IN CONFLICT C12 CHANNEL FOR NEW DRAG CONNECTION SEISMIC JOINT BETWEEN B3-B4 BUILDINGS

GUSTAVO BUSTAMANTE DN UP UP UP DN DN UP DN UP DN UP DN RID 190 LIBRARY/ CONCESSIONS 173 BOX OFFICE 174 (E) ELEV B12 PIANO CORRIDOR 180D 180J LOBBY 180K FOYER 180E 158 A2.01. A2.02. A2.02. A2.02. A8.21. 45 EL-1 A2 A8.01. 11 A8.01. A8.01. A8.03. 162 173.1 152 SOUND STORAGE 171 DRESSING BOYS RR 156 SALTERS STAGE 180 LEVEL ABOVE PRACTICE 190A MACHINE 172 157 156 157 151 158 180.4 180.5 170 160 ST-01 190 180J 180E B4-122 B4-121 B4-120 B4-118 B4-119 B4-114 S6.1 A4 MENS RR 12' 0" 18' 3" 14' 6" 19' 11 1/2" 28' 1/2" 29' 11" 29' 1/2" 22' 3/4" 24' 8" 200' 1/4" A2.02. 267' 11" A7.01. 165 273' 6" A6.01. A4a A4 R4.1 R4.1 A4 A4a F4t F4t A7.02. A7.01. A7.02. A7.02. A7.03. A7.03. A8.01. F4 G4 B4-104 JAN 180H 154 A8.03. 51 A8.22. 43 A8.02. 11 VIF CORRIDOR WORKSHOP MEN'S RR WOMEN'S RR 160 OFFICE OFFICE STORAGE RESTROOM 164 PRACTICE PRACTICE PRACTICE 154 175 180G 180A 180.1 RF4 F4 F4 F4 ALIGN R4.1 A4 T4 F4t F4t T4 T4 F4 F6t R4.1 F4 F2 BOOTH 180F F4c F1t F4t R4.1 R4.1 R4.1 G4 F1 F4 F4 F4 F4 R4.2 T4 F1t 270' 1/2" A2.01. A8.01. 34 (E) 12' 0" A11.01. 55 (E) 13' 1" 11' CLEAR (E) 11' 9" ± STRETCHER A7.03. ST-01 STAIR #02 CORRIDOR 150 STAIR #03 ST-03 STAIR #04 STAIR #06 ST-05 STAIR #07 ST-08 LIFT #01 LI-01 FP68 FP45 F2 R4.2 GAP 14' 1/4" 13' 11' 5" 5' 7" 11' 3" (E) 3"6' 8" 11"6 80 18' ALIGN 10" 16' 5" 10' 2" G4 S6.1 F4 CONTROL ROOM 160A K.2 M.2 DN 140 180.6 163A 1/4" 26' 11" 7' 11"1' 10"7' 6" ALIGN A1 A1.9 M. K.7 K.3 K. J. H.6 C. F. 72' 4" (E) 94' (E) 25' B4-123P.H. P.H. (6'-0" MIN .) PH 90 MNT. P.H.. TP21 18". A11.02. 53 61 A11.02. 64 66 A11.01. 21 12 A11.01. 31 41 FP11 159.1 A11.05. 12 11 22 A11.05. 62 51 52 A11.05. 71 74 A11.05. 75 78 43 41 A11.06. 12 11 A11.05. 36 35 46 A11.05. 54 53 56 63 21 51 A11.06. 57 A11.06. 33 23 171 V.I.F. 150.2 SALTER 180B 159 11' 30' 10" 50' 2"5' 4" 36' 11' 0.78% 270' 5/8" 7 % 159.3 R4.1 180D.1 FP50 FP50 20' (E) 21' 8" V.I.F. (E) 4" ± V.I.F. (E) 11' B4-102 B4-101 190B F4 B4-133 B4-130 B4-134 B4-136 45.3 ABOVE B4-129 - A1.01C. R4.1 F6 270' 3/4" SLOPE DN. A7.02. A7.02. A8.02. F4c ABOVE F4t F4t 165 SEISMIC GAP SEISMIC GAP A8.13. 54 F4c GAP A6 F4 A6.02. A5.02. WS14 WS14 FP76 FP76 A8.14. A8.14. 134F F4 F4 F2 51 F4 F4 R4.1 180M B4-137 F4 F2 PL PL F4 A6 DD22 SEE DETAIL: 53 A10.01. DD18 SEE DETAIL: 54 A10.01. TYP. AT (4) COLUMNS R6.p 11' 1/4" 0" 3/4" R6.p 11 1/2" 1/2" R6.p B4-140A B4-140B SHAFT ABOVE WD97 EL-1B EL-1A 1' 2" A5.02. ALL AROUND ALL AROUND EXIT STAIRWAY 150A A11.01. 32 42 14 13 3-HOUR COILING FIRE DOOR NO SCOPE FOR B3 (PETERS AUDOTORIUM) AT THIS SHADED AREA B3 IS UNDER A# 03-118303 SHAFT ABOVE F6 FE07 (27) (69) (39) FE07 (36) FE07 (27) (15) 270' 0.75 F4 A8.02. 32 C6 F2 F2 C6 ALL AROUND ALL AROUND C6 F2 FT. F4 ED1 PL DD37 F1 F4 DD60 F4 F1-5/8 F1-5/8 F4 F4 A8.03. 42 F4 F4 PL PL F1 F4 PL F4 F4 A4 F4 F4 F4 12" MIN. F4 F4 4' 0" F4 F4 ALLOW PANELS TO BE RECESSED. GAP ST10 S6.09 2D S0.12 ST10 DS DS DS DS DS DS DS DS DS DS 2-HR FIRE RATING, RE: (E) BRICK MASONRY WALL 1-HR FIRE RATING, RE: FIRE EXTINGUISHER CABINET (FEC). SEE DETAIL: FLOOR PLAN NOTES 1. ALL ITEMS ARE NEW UNLESS NOTED OTHERWISE. EXISTING RECORD DRAWINGS. FIELD VERIFY EXISTING CONDITIONS AGAINST PLANS. SHOULD ANY DIECREPACIES EXIST, OBTAIN WRITTEN DIRECTION FROM THE ARCHITECT AND OWNER PRIOR TO PROCEEDING WITH THE WORK. TO COORDINATE THE WORK WITH ALL TRADES. 5. REFER TO SHEET A9.01 FOR WINDOW AND DOOR E.SCHEDUL 6. REFER TO SHEET A10.03 AND A10.04 FOR PENETRATION 7. REFER TO SLAB PLANS A1.11B FOR FLOOR BOX LOCATIO 9. REFER TO CIVIL AND LANDSCAPE UNDER A# 03-116347 FOR SITE GRADING, PAVEMENT, AND SITE RELATED ITEMS EXISTING WINDOW AND DOOR OPENINGS, UNO. VIF 11. ALL DIMENSIONS ARE ACTUAL AND ARE TO FACE OF TALME UNLESS OTHERWISE NOTED. 12. REMOVE ALL STUCCO AND PLASTER PRIOR TO NGINSTALLI 13. REMOVE 4" CONCRETE CURB AT LOCKERS TO GET SMOOT 14. REFER TO SHEET A8.31 FOR ELEVATOR DETAILS. 15. REFER TO SHEET A13.01 FOR FURNITURE PLAN. 16. INTUMESCENT PAINT ON ALL STEEL COLUMNS, PROVIDE MANUFACTURER'S RECOMMENDATION. BOD: CAFCO (IFRM) BS476: PARTS 20 21 UL DESIGN NO. D601 TRUNCATED DOME FLOOR DRAIN PER PLUMBING CASEWORK BASE CABINETS 2'-0" DEEP, U.O.N. UPPER CABINETS 1'-0" DEEP, U.O.N. WALL IN-FILL CMU WALL DEMOUNTABLE PARTITION SEE A12.02B AND A12.02C WALL PER STRUCTURAL FLOOR PLANS FLOOR BOX NOT IN SCOPE RESISTANCE 1-HR RATED WALL BENCH, FOR ATTACHMENT 46 ??? 13 A10.01. 13 26 B1 B2 B3 B4 Architecture Engineering Planning Interiors © DLR Group inc. California, Califor nia corporation, ALL RIGHTS KEY PLAN LEGEND NOTES SS:_____ FLS:_____ AC:_____ DATE: ________________ 118472-03 FILE NO.: H27-19 PACKAGE 4BBUILDING B4 751220255 08262019 BEVERLY HILLS HIGH SCHOOL MODERNIZATION FLOOR PLANLEVEL 01FIRST FLOOR A1.01B. 241 MORENO DRIVE, BEVERLY HILLS, CA 90212 SCALE: B4 -LEVEL 01 -FIRST FLOOR PLAN -PART B KEYNOTES DD18WALL EXPANSION JOINT COVER ('CS' MODEL AFW-300 W/FB OR EQUAL) DD22CORNER WALL EXPANSION JOINT COVER ('CS' MODEL W/FB OR EQUAL) DD37PROVIDE SELF-CLOSING GATE AND REMOVABLE BOLLARD DD60PROVIDE 4"X4'X1/4" STEEL ANGLE AT THRESHOLD W/ 3/8" EPOXY ANCHOR @ 12" O.C. EL03DOWNSPOUT. EX15EXISTING PLAQUE TO REMAIN PROTECT IN PLACE. REMOVE, STORE AND REINSTALL WHERE WALL IS MODIFIED. FE07LOCKER UNIT FE34UTILITY SINK, TWO COMPARTMENTS W/ TWO DSDRAINBOAR LEFT FP07REINFORCED CONCRETE SHEAR WALL, SEE STRUCT. S.DWG FP11WALL INFILL FP38DOOR(S) INCLUDED IN B3 BUILDING PACKAGE FP45SLAB ON METAL DECK PER STRUCT. DWG. ST10SLAB ON GRADE, SEE STRUC. TP212'X4' ACCESSIBLE BENCH WD97CORNER GUARD PER SPECS. WS14WATERPROOFING 13+23+9+12 57 X TIERS 171 LOCKERS PROVIDE ACCESSIBLE LOCKERS AT CORRIDOR 150. 9+5 14 TIERS 42 LOCKERS PROVIDE ACCESSIBLE LOCKERS AT CORRIDOR B12 C THIS SET IS REPLICA OF THE 11-15-2019 DSA APPROVED SET FOR CONSTRUCTION *ELECTRONIC REPLICA OF DSA APPROVED DRAWINGS 11/15/2019. CLOUDED ITEMS CAPTURE DSA MANUAL COMMENTS, DURING APPROVAL, FOR G.C. IDENTIFICATION.
DESIGN ASSIST FOR EXISTING CONDITIONS THEATER GROUND FLOOR PLAN
CAMPUS MASTER PLAN

02 JACOB K. JAVITS

PROJECT DESCRIPTION:

The Javits Center expansion project is located in Hudson yards and is a $1.5 Billion expansion to the existing Javits Center. The project features 90,000 square feet, to be combined with current exhibit space, which will create an approximately 500,000-square-foot exhibition hall. The expansion will include 45,000 square feet of meeting room space, a 55,000 squarefoot ballroom, and a green roof terrace and pavilion accommodating 1,500 people for outdoor events.

RESPONSIBILITIES:

• Involved in all phases of design from Schematic Design to Construction Administration.

• Create and update permit sets.

• Team lead for design strategies, consultant management, and structural coordination.

• Managed RFIs, submittals, and shop drawings.

• Coordinate with contractors and respective trades.

LOCATION: New York City, New York

PROGRAM: Convention Center

SIZE: 1,200,000 SF

GUSTAVO BUSTAMANTE RELATIONSHIP DIAGRAM GREEN ROOFS DIAGRAM EVENT SPACE DIAGRAM CITY FOCAL POINTS DIAGRAM CONNECTIVITY DIAGRAM
11TH
VIEW FROM
AVE
VIEW FROM INSIDE OF BALLROOM
JACOB K. JAVITS CONVENTION CENTER EXPANSION PROJECT 22 DESIGN-BUILD SERVICES FOR THE JACOB K. JAVITS CONVENTION CENTER EXPANSION PROJECT CONCEPT 22 CENTER EXPANSION PROJECT CONCEPT 22 CONCEPT 22 DESIGN-BUILD SERVICES FOR THE JACOB K. JAVITS CONVENTION CENTER EXPANSION PROJECT CONCEPT LONGITUDINAL SECTION AT ATRIUM LOBBY AND PREFUNCTION EXTERIOR SKIN COMPONENTS
VIEW FROM INSIDE OF ATRIUM

MERCEDES-BENZ

PROJECT DESCRIPTION:

The stadium’s roof design draws inspiration from the form of a falcon’s wing and is composed of eight triangular panels that encircle the entire structure, moving in unison along individual tracks to create a camera aperture-like effect when opening and closing. The transparency of the facade allows for easy modification of its color through exterior lighting. The roof comprises eight 220-foot-long petals, while the angular form of the facade follows the roof’s design, featuring alternating insulated metal and ETFE panels inspired by the shape of

RESPONSIBILITIES:

• Involved in Construction Administration.

• Review shop drawings and managed Tekla models.

• Manage RFIs and submittals.

• Coordination with MEP, structural and lighting engineers.

• Coordinate with contractors and respective trades for interior design.

LOCATION: Atlanta, Georgia

PROGRAM: Stadium

SIZE: 1,800,000 SF

03
GUSTAVO BUSTAMANTE
AERIAL VIEW DURING CONSTRUCTION
NORTH ELEVATION
VIEW FROM GROUND SUITES SKYLINE VIEW FROM UPPER BALCONY

04 ZHUMADIAN

PROJECT DESCRIPTION:

The site is located along the western edge of the new commercial development to the west of the central city and will be the first of three cultural buildings to sit within the agricultural park area. The rounded triangular form of the seed suggests the potential of life and organic growth and development, a concept that has informed the building’s design. The three elements critical in the agricultural process are earth, heaven, and people.

RESPONSIBILITIES:

• Collaborate with design team for concepts.

• Lead coordination with structural and MEP teams.

• Created Schematic Design and Design Development packages.

• Led coordination with consultants relative to the construction of the ‘skin’.

LOCATION: Zhumadian, China

PROGRAM: Exhibition Center

SIZE: 1,200,000 SF

GUSTAVO BUSTAMANTE LEVEL 1 24.00 m 16 2 12 10 8 6 4 1 18 32 22 24 26 28 30 33 3 5 7 9 11 17 19 23 25 27 29 31 15 -6.00 m D, 1 A1-020 A, A1-020 9.00 m A,9 EL. 28.500 EL. 28.500 FT-1 FT-3 FT-5 FT-2 FT-2 FT-2 FT-1 FT-5 FT-3 舞台屋面 ROOF POP UP FOR THEATRE FLY LOFT TOP OF ROOF 31.5m EL. 28.000 F G H J K L M N P Q R R1 FT-2 EL. 28.500 FT-5 FT-3 FT-3 FT-3 FT-3 TOP OF ROOF 30.250m 2700 PROMENADE ATLANTA, GEORGIA 404-888-6600 404-888-6700 TVS INTERNATIONAL, Scales as stated hereon scales noted hereon corresponding dimensions This drawing is the or in part. It is only any other project. TVS INTERNATIONAL, 2 14 13 12 11 10 9 8 7 6 5 4 3 15 16 17 18 1 19 KEYNOTE NOTE: Information contained intent only. Drawings provided to convey program and The Architect documents as construction and be provided by product sourcing Life safety, building shall be reviewed responsible for Manufacturer's shall be used requirements DIMENSION All dimensions All drawings are G,1 SOUTH ELEVATION 参参参参南参参 600 N,1 WEST ELEVATION 参参参参西参参 Key Value FT-1 FT-2 FT-3 FT-4 FT-5 FT-6 UP NA A -0 16 10 6 18 32 26 28 30 33 5 19 23 25 29 31 aa B C J K R EB EC ED EJ EK ER a1 a4 a5 a6 a7 b1 b4 b5 b6 b7 c8 c7 c6 c5 c4 c3 c2 c1 d1 d4 d5 d9 d10 e3 e7 e8 e11 f10 f8 f6 f3 f1 15 L,1 Q,1 b11 A,10 34 35 f13 20 R 0 8 cy1 cy2 cy3 妆电 员员厅 e12 9 6000 9500 9000 9000 9000 9000 9000 9000 9000 9000 9000 6000 N A B C B G H J K L 2 P S M N 14 13 12 11 10 9 7 6 5 4 3 1 2 3 4 5 6 7 9 10 11 12 13 15 16 14 17 18 A A B D K J H G 15 16 17 18 1 19 19 Q R AS NOTED NOT RELEASED FOR CONSTRUCTION 驻马店农产品展示交易中心 ZHUMADIAN INTERNATIONAL CONVENTION CENTER E:\04988_ZMDCC2_A2017_bwathen.rvt 12/23/2016 1:27:20 PM REFERENCE PLAN - LEVEL 1 (EL.+0.00) A1-001 参考平面 - 层 (EL +0 00) A,1 REFERENCE PLAN LEVEL 1 (EL.+0.00) 参参参参一层 (EL.+0.00) 50% Schematic Design 100% Schematic Design 12/23/2016 VIEW FROM MAIN ENTRANCE VIEW FROM INTERIOR COURTYARD VIEW FACING EXHIBITION HALL GROUND FLOOR PLAN NORTH ELEVATION

05 AMADOR

PROJECT DESCRIPTION:

The site is located adjacent to the Panama Canal and the old city. The design responds to the existing conditions and connects the programmatic elements through a series of simple curves. The undulating glass facade and roof surfaces tie the two “continents” of the exhibit hall and the ballroom together with a daylight-filled grand lobby space forming the heart of the complex.

RESPONSIBILITIES:

• Led communication with clients and stakeholders.

• Designer for Panama Convention Center.

• Collaborate with team for conceptual modeling in Grasshopper, Rhino, and Revit.

• Created Schematic Design and Design Development package with local Panama firm.

• Led coordination of structure, MEP, and interiors.

LOCATION: Panama City, Panama

PROGRAM: Convention Center

SIZE: 625,000 SF

GUSTAVO BUSTAMANTE UP UP UP UP UP BG EG EE EF 22 27 13000 2 EE.3 DOWN 1 6700 5800 JUNTA DE EXPANSIÓN EXPANSIÓN BH OFICINAS Administration Back of House Business Cooling Tower Exhibit Hall Loading Dock Mechanical Meeting Room Public Circulation Public Circulation Road Parking Service Elevator EH 12500 CC TORRE DE ENFRIAMIENTO 1 2 3 4 5 6 7 8 9 BA BB BC BD BE BF BG EA EB EC ED EG EE EF 10 11 12 15 16 17 18 19 20 21 22 24 25 26 27 28 23 13000 13000 13000 13000 13000 13000 13000 13000 13000 11913 18000 2000 16000 18000 18000 18000 18000 18000 18000 18000 ABIERTO HACIA ABAJO OPEN TO BELOW ABIERTO HACIA ABAJO EC.7 EE.3 29 EC.3 ED.2 ED.8 ED.6 4 14 13 F,1 A-110 A,1 A-110 A-110 K,10 6700 5800 16000 16000 16000 9000 9000 A,1 A-120 EXPANSIÓN JUNTA DE EXPANSIÓN L,1 A-120 F,1 A-120 F,11 A-120 BH PRE-FUNCTION SALÓN DE BANQUETES OPEN TO BELOW EH EB.9 9000 9000 9000 9000 9000 12500 CA CC CB 5 3 3 0 0 0 0 0 EXPANSION JOINT EXPANISON JOINT OPEN TO BELOW ABIERTO HACIA ABAJO OPEN TO BELOW 404 888 6600 fax 404 TVS INTERNATIONAL, Scales as stated hereon These scales noted to the corresponding This drawing is the used on any other TVS INTERNATIONAL, J K L 2 P S T M N 14 13 12 11 10 9 8 7 6 5 4 3 15 16 17 18 1 19 Q R NOTE: This set of drawings and Construction and may requirements directed The Architect-of-Record approval by the Design-Builder meet building codes, construction drawings and documents. drawings and documents responsible for all final products, materials and indicated or not shall building codes/laws. Should documents, contact the Manufacturer's products of design. Alternate sourcing DIMENSION NOTES: All drawings are to be M,1 LEVEL 2 - REFERENCE PLAN NIVEL 2 PLANO DE REFERENCIA 0 m LEVEL 6.5 m EA EB EC ED EG EE EF 6500 EAST ENTRANCE EXHIBIT HALL GLASS WALL CS-1 CS-1 CW-3 CS-1 ELEPHANT DOORS SALA DE EXHIBICIÓN 0 m LEVEL 2 6.5 m BA BB BC BD BE BF BG A,1 A-120 BH CS-1 EB.9 0 m LEVEL 2 6.5 m 1 2 3 4 5 6 7 8 9 10 11 12 15 16 17 18 19 20 21 22 14 13 L,1 A-120 F,1 A-120 MP-4 404 888 6600 TVS INTERNATIONAL, Scales as stated These scales to the corresponding This drawing or in part. It used on any TVS INTERNATIONAL, 2 14 13 12 11 10 9 8 7 6 5 4 3 15 16 17 18 19 KEYNOTE This set of drawings Construction and requirements directed The Architect-of-Record approval by the occupancy of the meet building codes, drawings and documents. drawings and documents responsible for For the purpose products, materials indicated or not building codes/laws. Manufacturer's of design. Alternate DIMENSION NOTES: All drawings are EAST ELEVATION ELEVACIÓN DEL OESTE 1 600 M,10 WEST ELEVATION ELEVACIÓN DEL ESTE Key Value CS-1 CW-1 MP-4 WEST ELEVATION GROUND FLOOR PLAN BUILDING MASSING DIAGRAMS INTERIOR VIEW FROM CONCOURSE AERIAL RENDERING AERIAL CONSTRUCTION PROGRESS VIEW AT MAIN ENTRANCE

PROJECT DESCRIPTION:

The design of the Longgang International Arts Center seeks to express the lyrical beauty inherent in the forms, details and materials of traditional musical instruments native to China such as the Pipa and Violin. More importantly, the design encourages the visitors to imaginatively place themselves inside these musical instruments through invoking their hidden interior spaces and the quality of natural light that enters through their diverse sound holes.

RESPONSIBILITIES:

• Communicate with clients, local firms, and stakeholders.

• Create Schematic Design and Design Development package

• Manage design team of 6.

• Design for concepts for competition.

• Collaborate with team for conceptual modeling in Grasshopper, Rhino, and Adobe.

• Create presentation for client and competition entry.

LOCATION: Shenzhen, China

PROGRAM: Arts Center

SIZE: 3,000,000 SF

06 LONGGANG
GUSTAVO BUSTAMANTE OVERALL SITE PLAN VIEW FROM MAIN ENTRANCE SITE AND FORM DIAGRAM PROGRAMMATIC DIAGRAM CONNECTIVITY DIAGRAM

07 GUANGZHOU

PROJECT DESCRIPTION:

The Guangzhou Convention Center, located adjacent to the airport and with close proximity to local transportation, is a dynamic 15,000,000 square feet architectural project designed as a central hub within a larger master plan, featuring 100,000 square feet of exhibit halls for airplane exhibitions. It’s equipped with state-of-the-art technology and amenities, suitable for hosting various events, such as conferences, concerts, and sporting events, positioning it as an essential destination for business and tourism in Guangzhou, a symbol of the city’s innovation and progress.

RESPONSIBILITIES:

• Coordinate with design team for competition entry.

• Create Schematic Design and Design Development package with local Chinese firm.

• Manage design team and provided conceptual sketches.

• Managed presentations and deliverables.

LOCATION: Guangzhou, China

PROGRAM: Convention Center

SIZE: 15,000,000 SF

GUSTAVO BUSTAMANTE A B C C D D D D D D D D D D D D D D E E E E E F G H J K L M N 10 11 12 13 13 14 14 15 15 15 15 16 17 1 1 1 2 3 4 5 6 7 7 7 8 8 8 8 8 8 8 9 O 9 停车区 Landscape of U axis parking lot 17 T3 terminal T3航站楼 N 120 PHASING DIAGRAMS VIEW FROM BRIDGE PHASE 1 - FOUR EXHIBIT HALLS PHASE 2 - TWO ADDITIONAL EXHIBIT HALLS ADDED PHASE 3 - EIGHT ADDITIONAL EXHIBIT HALLS ADDED MASTERPLAN

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.