GALIN AGHKYAN architecture portfolio 2024
Oro CollectionBoutique Hotel in DTLA
Los Angeles, CA
Conjunction & Correlation at Piazza dei Ciompi
Florence, Italy
UNEARTH Agricola®
San Donnino, Florence, Italy
Silver Lake Mixed-Use Housing
Los Angeles, CA
D C B A
10 04 16 22
Oro Collection - Boutique Hotel in DTLA
Los Angeles, CA
Fall 2023
Instructor: Sona Gevorkyan
This proposal aims to reintroduce the rich history of the jewelry industry in the heart of Los Angeles. Located within close proximity to the jewelry district in downtown, the newly designed dress seeks to reflect the subtlety and craftsmanship of jewelry making. Looking into the history of the building itself, it served as a jewelry manufacturing center for several years. This led to the design of a dress that reflects the jewelry industry, and pays homage to the building’s past.
In order to welcome users into the space, the façade system was lifted and created the only moment in the building where the body is exposed, without its dress. By extending the new body of the building past the existing footprint, nooks of expansions were created. These expanded spaces are different on each floor, based on the interior programmatic arrangements, and different opacities of glazing are used based on privacy needs of the interior spaces. Moving to the upper floors, they become less and less spacious, leading the body of the building to become slimmer at the top. The new dress of the building loosely follows the shape of the body, and covers the entirety of the building except the ground floor entrance. There are three façade systems used: a dense diagonal mesh system on the ground floor to relate to the pedestrian scale, a chain cladding system, and a larger scale diagonal mesh. In order to ensure the comfort of the hotel users, the chain cladding system would be installed using a movement limiter and being fastened from the bottom and top. Each of the floors have varying experiences, through the use of different facade systems, and expanded spaces that are dependent on the interior arrangements of the units.
Exterior Rendering 4
JEWELRYDISTRICT
Before: Uniform Application of Façade System
After: Lifting of Façade System for Main Entrance
Jacquemus FW19
Proximity to the Jewelry District
new dress new body 4’ boundary existing building footprint
Simone Rocha SS18
Diagram Dress vs Body Diagram 5
Existing Body New Body
Context
CLOSET ADA BATHROOM BATHROOM BATHROOM BATHROOM DOUBLE ROOM KING ROOM KING ROOM KING ROOM KING ROOM BATHROOM BATHROOM BATHROOM DOUBLE ROOM DOUBLE ROOM ADA KING ROOM BATHROOM BANKSY ALLEY S BROADWAY ALLEY UP DN UP DN 10’ 5’ 3’ 0’ EVENT SPACE STORAGE LOCKERS RETAIL LOBBY LAUNDRY BATHROOM ADA BATHROOM ADMIN S BROADWAY ALLEY BANKSY ALLEY UP UP UP Ground Floor Plan Levels 4-7 Floor Plan 6
Double Room - Isometric View
Suite - Isometric View
Suite - Interior View
7
Double Room - Interior View
10’ 5’ 3’ 0’
Façade Diagram 0’ 3’ 5’ 10’ 8
Right Elevation
Exterior Rendering
Model 9
Physical
Conjunction & Correlation at Piazza dei Ciompi
Florence, Italy
Fall 2022
Instructor: Paola Giaconia, Marco Brizzi, Achille Michelizzi
In collaboration with Ivy Baxter
Located in the heart of Florence’s historic center, Piazza dei Ciompi was founded in the 1930s and connects the city center with the Santa Croce neighborhood. The rebuilding of Loggia del Pesce added to its importance as it increased foot traffic and and interest. This proposal introduces a kindergarten and a public library to the piazza, while preserving the neighborhood fabric and identity.
This project’s main aim is to create a centralized communal area by aligning and correlating the library and kindergarten with the existing loggia and surrounding buildings. The communal space creates a conjunction, blending the programs together and becoming a singular place of socialization and interchange. The centralized courtyard places an emphasis on the idea of unity and encourages social interactions. A unified mass with a unique footprint was created by combining the existing street and loggia grids.
An emphasis was placed on blending the indoor and outdoor spaces while maintaining separation of public and private programs through the use of solid vs transparent materials. The roof forms were created by projecting the combination of street and loggia grid in section, creating pitched forms that mirror the silhouettes of the surrounding buildings. Moments of glazing were introduced in areas that open up to the public, such as the seating stairs that face Brunelleschi’s dome. The landscape forms were extracted from the same grid, and assigned for vegetation and open public uses, such as the weekly flea market. This project seeks to create a public atmosphere of connection and interaction through the introduction of much needed programs in Florence’s historic center.
Courtyard Rendering
10
Exterior Rendering
Street and Loggia Grids
Street and Loggia Grid Lines
Street and Loggia Grid Lines
Section A
Building Outline Created from Gridlines
Landscape Outline Created from Gridlines
Outline Created from Grid Lines
Outline Created from Grid Lines
Outline
Street and Loggia Grid Lines Outline Created from Grid Lines
Grid Aligned with the Loggia
Grid Aligned with the Loggia
Grid Aligned with the Street
Grid Aligned with the Street
Grid Aligned with the Loggia
Grid Aligned with the Street
Section B
Loggia Grid
Street Grid
Roof Forms Derived from Gridlines
11
UP UP UP 0m 2m 5m Ground Floor Plan 3 8 8 8 1 2 1 9 4 5 6 6 7 10 11 8 12 8 13 15 16 17 14 C A B D B B A A D D C C Ground Floor Plan Site Plan 0m 2m 5m 10m 15m 10. Principal’s Office 11. Teacher’s Lounge 12. Kitchen 13. Nurse’s Room 14. Dining Area 15. Private Outdoor Playground 16. Playroom 17. Auditorium 1. Frontdesk Reception 2. Café and Bookstore 3. Café Outdoor Seating 4. Storage 5. Conference Room 6. Admin Office 7. Break Room 8. Restrooms 9. Exhibition Space 12
0m 2m 5m 10m 15m 30m West Elevation - C 0m 2m 5m 10m 15m 30m Section B Section B Elevation C 0m 2m 5m 10m 15m 13
Program and Material Diagram Program and Material Diagram
Loggia del Pesce
Piazza
Outdoor Reading Area
Library
Courtyard
Kindergarten
Outdoor Seating Area
Grey Brick
Venetian Marble
14
Wire Mesh Fence
Exterior Rendering 15
UNEARTH
Agricola®
San Donnino, Florence, Italy
Spring 2023
Instructor: Paola Giaconia, Marco Brizzi, Achille Michelizzi
In collaboration with Ivy Baxter
The word “unearth” can be interpreted to have multiple meanings.
1) to discover, to reveal, to make public, to dig up and to excavate.
2) un-earth, something that is not earth, artificial, an intervention to the earth. The incinerator of San Donnino is a long established landmark that has characterized the town’s history for the past 50 years. It was in operation for a short period of time, but its effects on the community’s health and quality of life have been significant. To counteract these negative effects and to transform the area surrounding the incinerator, the proposal aims to “unearth” the site, to build up an artificial landscape and establish a new cultural landmark.
Located 10km west of the metropolitan city of Florence, providing a new cultural hub for San Donnino was deemed essential. This would serve as a direct connection with the incinerator and revitalize the area.
The resulting design encompasses gently sloping hills that create an atmosphere of cultural connectivity and interaction with the environment. These hills include meandering pathways that lead users all throughout the site, staying true to the natural forms of the newly-created hills. Visitors can approach the site from the various points of access, which create moments of anticipation leading up to different parts of the project. The combination of these elements, the hills and the cultural identity of San Donnino, were unearthed by the transformation of the previously contaminated land. With this proposal, we aimed to bring new life into the community of San Donnino by encouraging opportunities for education and accessible spaces to all.
Aerial View 16
Landscape Study of Existing Condition
San Donnino Grids
Le Piagge Grids
17
Combination of San Donnino and Le Piagge Grids
UP culinary school ground floor plan catering services -1 floor plan restaurant ground floor plan classroom classroom office kitchen demo class food storage food storage lounge kitchen fridge freezer fridge/freezer pastry kitchen kitchen classroom conference room A B A B UP 0m 2.5m 5m 7.5m Cultural Hub - Floor Plans agriculture school ground floor plan educational center ground floor plan conference room teachers’ lounge computer lab classroom classroom classroom classroom classroom classroom storage storage cafeteria workshop room office office office lounge lobby office conference room workshop room library co-working courtyard outdoor seating stairs outdoor class A B A B UP UP 0m 2.5m 5m Cultural Hub - Floor Plans co-working space ground floor plan agriculture school -1 floor plan biomaterials lab electronics lab machine systems lab computer lab agriculture lab library bioprocessing lab biotreatment lab bioconversion lab cafeteria courtyard outdoor seating stairs outdoor class lobby A B B A Master Plan Cultural Hub Floor Plans 0m point of access 25m 50m 100m 0m 2m 5m 10m 15m 18
glass for greenhouses
glass for greenhouses
egress stair core
egress stair core
façade design
facade design
Arrangement and Modification of Forms
enclosed massing terracing connected to piazza
Incinerator Modified Incinerator greenhouses 890 m2 cafe 340 m2 retail market 931 m2 wholesale market 1,135 m2 distribution center 1,367 m2 greenhouses 890 m2 cafe 340 m2 retail market 931 m2 wholesale market 1,135 m2 distribution center 1,367 m2 Program Diagram - Cultural Hub co-working space 1,380 m2 agriculture school 2,100 m2 education center 1,612 m2 culinary school 530 m catering services 590 m2 restaurant 265 m2
Original
Incinerator Program Diagram
Cultural Hub Program Diagram
Incinerator Modified Incinerator greenhouses 890 m² café 340 m² co-working space 1,380 m² agriculture school 2,100 m² education center 1,612 m²
school 530 m² catering services 590 m² restaurant 265 m² retail market 930 m² wholesale market 1,135 m² distribution center 1,367 m² enclosed massing terracing connection
Cultural Hub Massing Diagram
Original
culinary
19
East Elevation West Elevation Incinerator Section Perspective
Terrace
Greenhouse
Entrance
North Elevation 20
Incinerator to Piazza Connection
Bench Seating
Cultural Hub Elevation
Agriculture School Courtyard Observation Tower
Piazza Steps
Incinerator Terrace
Co-Working Space
Cultural Hub and Piazza
Piazza Ramp to Cultural Hub
21
Piazza Steps
Silver Lake Mixed-Use Housing
Los Angeles, CA
Spring 2022
Instructor: Anton Schneider
The proposal for a mixed-use housing includes ten units; one twobedroom loft, one two-bedroom apartment, four one-bedroom apartments, and four studio apartments. Keeping Silver Lake’s demographics in mind, this housing development is intended for young professionals. On the ground floor, there is an architecture office space, a retail space, as well as a covered parking space for the public. There is a private parking garage on the underground floor, which is accessible solely to tenants for safety purposes and provides parking for the various users of the building.
The building is designed around a central courtyard on the plateau level, which has moments of compression and expansion, looking out to surrounding views of the site. Since the building is intended for young professionals, there are plenty of community spaces designed within the structure. The building’s amenities include a multi-purpose community room, a gymnasium, an outdoor yoga space, and a rooftop deck which has a communal garden and barbecue area. Each apartment unit is designed in a way to provide direct access to their respective balcony spaces from the main entrance. Another key feature of the building is that the occupiable units are designed around the community spaces in order to further encourage neighborly interactions. In terms of materials, the building is covered with horizontal wooden members that are attached to its primary plaster surface.
This proposal provides housing to a highly desired neighborhood in Los Angeles, and serves as a means of connection and interchange within the population of young professionals.
Exterior Rendering 22
TN GArchitecture ARCHITECT SILVER LAKE MIXED-USE Galin Aghkyan 1234 Random St., Los Angeles, CA 90013 contact@garchitecture.com PROJECT INFO SITE PLAN A-101 Project Name: Silver Lake Mixed-Use Project Owner: Architecture Department, Cal Poly Pomona Project Address: 1650 Silver Lake Blvd, Los Angeles, CA 90026 REVISIONS NO. DESCRIPTION DATE 1 INITIAL DRAFT 03/25/2022 2 FINAL DRAFT 05/12/2022 SILVERLAKEBOULEVARD EFFIESTREET W S I L V E R L A K E D R I V E NORTHOCCIDENTALBOULEVARD NORTHEASTERLYTERRACE 27’-6” 26’-0” 18’-6” 13’-2” 20’-0” 20’-0” 20’-0” 20’-0” 13’-2” LOBBY 220 SF ARCHITECTURE OFFICE 1,090 SF RETAIL 1,050 SF COMMERCIAL PARKING ONLY UP DN DN UP A B C D E F G 1 2 3 4 C1 A-301 A1 A-301 A1 A-201 A1 A-202 A2 A-202 WA-1 WA-1 WA-1 WA-3 Plateau Floor Plan UP DN DN UP A B C D E F 1 2 3 4 A A B B 12.5’ 7.5’ 2.5’ 0’ 25’ PN TN A C B WA-3 WA-2 WA-3 WA-1 WA-3 Site Plan Plateau Floor Plan Ground Floor Plan 0’ 5’ 15’ 25’ 50’ 0’ 5’ 10’ 15’ 25’ 23
HARDWOOD FLOORING
PLYWOOD SHEATHING
CEMENT PROTECTION BOARD
FR 1 STC 56
HARDWOOD FLOORING
PLYWOOD SHEATHING
CEMENT PROTECTION BOARD
1 STC 56 R-25
SOUND ATTENUATION MAT
WOOD JOIST
BATT INSULATION
HAT CHANNEL
GYPSUM WALLBOARD
Floor Assembly
FLOOR ASSEMBLY (FA-1) C1
1 1/2”=1’-0”
HARDWOOD FLOORING
PLYWOOD SHEATHING
SOUND ATTENUATION MAT
WOOD JOIST
BATT INSULATION
HAT CHANNEL
GYPSUM WALLBOARD
FLOOR ASSEMBLY (FA-1) C1
SCALE: 1 1/2”=1’-0”
Floor Assembly
FLOOR ASSEMBLY (FA-2) C2
SCALE: 1 1/2”=1’-0”
HARDWOOD FLOORING
PLYWOOD SHEATHING
STRUCTURAL CONCRETE SLAB ON GRADE
HANGER
0’ 5’ 10’ 15’ 25’ 24
EXTERIOR
FLOOR ASSEMBLY (FA-1)
SCALE: 1 1/2”=1’-0”
FLOOR ASSEMBLY (FA-2)
SCALE: 1 1/2”=1’-0”
ROD
PVC ADHESIVE
CEMENT PROTECTION BOARD
WOOD JOIST
BATT INSULATION
HAT CHANNEL
PVC ROOF MEMBRANE
ROOF ASSEMBLY (RA-1) A1
SCALE: 1 1/2”=1’-0”
CEMENT PROTECTION BOARD
WATERPROOFING MEMBRANE
RIGID INSULATION
PLYWOOD SHEATHING
FLOOR ASSEMBLY (FA-3)
SCALE: 1 1/2”=1’-0”
SOUND ATTENUATION MAT
GYPSUM WALLBOARD
HARDWOOD FLOORING
PLYWOOD SHEATHING
gypsum wallboard hat channel batt insulation wood joist sound attenuation mat
STRUCTURAL CONCRETE SLAB ON GRADE
structural concrete on grade plywood sheathing hardwood flooring
cement protection board plywood sheathing hardwood flooring hanger rod
HANGER ROD
GYPSUM WALLBOARD
PVC ADHESIVE
EXTERIOR EXTERIOR INTERIOR R-38
FLOOR ASSEMBLY C2
SCALE: 1 1/2”=1’-0”
PVC ROOF MEMBRANE 12” 1/4”
CEMENT PROTECTION BOARD
WATERPROOFING MEMBRANE
RIGID INSULATION
PLYWOOD SHEATHING
FLOOR ASSEMBLY C3
CERAMIC TILE
MORTAR BED
PVC MEMBRANE
PLYWOOD SHEATHING
SOUND ATTENUATION MAT
SCALE: 1 1/2”=1’-0”
WALL ASSEMBLY (WA-3)
SCALE: 1 1/2”=1’-0”
WOOD JOIST
BATT INSULATION
HAT CHANNEL
GYPSUM WALLBOARD
HAT CHANNEL
WOOD JOIST
BATT INSULATION
3 PART STUCCO
3 part stucco wood joist hat channel batt insulation
EXTERIOR
-12’-0” Underground Level T.O. Ground Level T.O. Plateau Level T.O. Third Level +13’-0” +23’-6” +33’-6” +45’-0” T.O. Building Section B Section A -12’-0” Underground Level +13’-0” T.O. Ground Level +23’-6” T.O. Plateau Level T.O. Third Level +33’-6” +45’-0” T.O. Building C1 A-503 C2 A-503 C3 A-503 RA-1 RA-2 FA-1 FA-2 FA-3 A3 A-501 RA-1 RA-2 FA-3 FA-1 FA-2 A B C D E F 1 2 3 4
SCALE:
C B
A
INTERIOR INTERIOR INTERIOR
FR
1 D C B
2
12” 1/4” 12”
1/4”
INTERIOR INTERIOR EXTERIOR EXTERIOR INTERIOR EXTERIOR
R-25
C1
C4
C2
C3
1 D C 2 3
INTERIOR INTERIOR EXTERIOR EXTERIOR INTERIOR EXTERIOR FR 1 R-19 FR 1 STC 56 R-25 EXTERIOR INTERIOR +13’-0” T.O. Ground Level T.O. Plateau Level T.O. Third Level T.O. Building Ground +3’-0” +23’-6” +45’-0” +33’-6”
GYPSUM WALLBOARD A
Elevation
Section B
C1
C2
Floor Assembly
C3
sound attenuation mat plywood sheathing PVC membrane mortar bed ceramic tile FR 1 STC 56 R-25 interior exterior exterior exterior
gypsum wallboard interior interior
ONE BEDROOM UNIT ELECTRICAL RCP A3 SCALE: 1/4”=1’-0” ONE BEDROOM UNIT HVAC RCP A1 SCALE: 1/4”=1’-0” WP WALL MOUNTED LIGHT FIXTURE RECESSED CAN LIGHT FIXTURE PENDANT LIGHT FIXTURE SLIM STICK WALL MOUNT LIGHTING DUPLEX OUTLET SWITCH REFRIGERATOR CLOTHES WASHER COOKTOP EXHAUST THERMOSTAT GARBAGE DISPOSAL SMOKE DETECTOR CABLE JACK ELECTRICAL SILVER LAKE MIXED-USE PROJECT INFO UNIT FLOOR PLANS A-402 Project Name: Silver Lake Mixed-Use Project Owner: Architecture Department, Cal Poly Pomona Project Address: 1650 Silver Lake Blvd, Los Angeles, CA 90026 REVISIONS NO. DESCRIPTION DATE SCALE: 1/4”=1’-0” 1 INITIAL DRAFT 03/25/2022 2 FINAL DRAFT 05/12/2022 LEGEND HVAC SOFFIT EXHAUST SUPPLY VENT RETURN VENT DUCT SUPPLY RETURN 1 2 3 GD CT P TV CW WP WP GD R CT P T TV S CW WP C3 ONE BEDROOM UNIT ELECTRICAL RCP A3 SCALE: 1/4”=1’-0” BEDROOM UNIT HVAC RCP 1/4”=1’-0” WP WALL MOUNTED LIGHT FIXTURE RECESSED CAN LIGHT FIXTURE PENDANT LIGHT FIXTURE SLIM STICK WALL MOUNT LIGHTING DUPLEX OUTLET SWITCH REFRIGERATOR CLOTHES WASHER COOKTOP EXHAUST THERMOSTAT GARBAGE DISPOSAL SMOKE DETECTOR CABLE JACK ELECTRICAL SILVER
MIXED-USE PROJECT INFO UNIT FLOOR PLANS A-402 Project Name: Silver Lake Mixed-Use Project Owner: Architecture Department, Cal Poly Pomona Project Address: 1650 Silver Lake Blvd, Los Angeles, CA 90026 REVISIONS NO. DESCRIPTION DATE SCALE: 1/4”=1’-0” INITIAL DRAFT 03/25/2022 FINAL DRAFT 05/12/2022 LEGEND HVAC SOFFIT EXHAUST SUPPLY VENT RETURN VENT DUCT SUPPLY RETURN 1 2 3 GD CT P TV S CW WP WP GD R CT P T TV S CW WP ONE BEDROOM UNIT HVAC RCP A1 SCALE: 1/4”=1’-0” A ONE BEDROOM UNIT ELECTRICAL RCP A3 SCALE: 1/4”=1’-0” WP WALL MOUNTED LIGHT FIXTURE RECESSED CAN LIGHT FIXTURE PENDANT LIGHT FIXTURE SLIM STICK WALL MOUNT LIGHTING DUPLEX OUTLET SWITCH REFRIGERATOR CLOTHES WASHER COOKTOP EXHAUST THERMOSTAT GARBAGE DISPOSAL SMOKE DETECTOR CABLE JACK ELECTRICAL GArchitecture SILVER LAKE MIXED-USE PROJECT INFO UNIT FLOOR PLANS A-402 Project Name: Silver Lake Mixed-Use Project Owner: Architecture Department, Cal Poly Pomona Project Address: 1650 Silver Lake Blvd, Los Angeles, CA 90026 REVISIONS NO. DESCRIPTION DATE SCALE: 1/4”=1’-0” 1 INITIAL DRAFT 03/25/2022 2 FINAL DRAFT 05/12/2022 LEGEND HVAC SOFFIT EXHAUST SUPPLY VENT RETURN VENT DUCT SUPPLY RETURN ARCHITECT Galin Aghkyan 1234 Random St., Los Angeles, CA 90013 contact@garchitecture.com 3 4 GD CT P P TV WP WP GD R CT P T TV S CW WP WP WALL MOUNTED LIGHT FIXTURE RECESSED CAN LIGHT FIXTURE PENDANT LIGHT FIXTURE SLIM STICK WALL MOUNT LIGHTING DUPLEX OUTLET SWITCH REFRIGERATOR ELECTRICAL GArchitecture SILVER LAKE MIXED-USE PROJECT INFO Project Name: Silver Lake Mixed-Use Project Owner: Architecture Department, Cal Poly Pomona Project Address: 1650 Silver Lake Blvd, Los Angeles, CA 90026 REVISIONS NO. DESCRIPTION DATE INITIAL DRAFT 03/25/2022 FINAL DRAFT 05/12/2022 LEGEND HVAC SOFFIT EXHAUST SUPPLY VENT RETURN VENT DUCT SUPPLY RETURN ARCHITECT Galin Aghkyan 1234 Random St., Los Angeles, CA 90013 contact@garchitecture.com 4 GD CT P TV WP WP R P WP WP WALL MOUNTED LIGHT FIXTURE RECESSED CAN LIGHT FIXTURE PENDANT LIGHT FIXTURE SLIM STICK WALL MOUNT LIGHTING DUPLEX OUTLET SWITCH REFRIGERATOR CLOTHES WASHER COOKTOP EXHAUST THERMOSTAT GARBAGE DISPOSAL ELECTRICAL GArchitecture SILVER LAKE MIXED-USE PROJECT INFO UNIT FLOOR PLANS A-402 Project Name: Silver Lake Mixed-Use Project Owner: Architecture Department, Cal Poly Pomona Project Address: 1650 Silver Lake Blvd, Los Angeles, CA 90026 REVISIONS NO. DESCRIPTION DATE INITIAL DRAFT 03/25/2022 FINAL DRAFT 05/12/2022 LEGEND HVAC SOFFIT EXHAUST SUPPLY VENT RETURN VENT DUCT SUPPLY RETURN ARCHITECT Galin Aghkyan 1234 Random St., Los Angeles, CA 90013 contact@garchitecture.com 4 GD R CT P TV WP GD R CT P T CW WP WALL FRAMING PLAN A1 SCALE: 1/4”=1’-0” FLOOR FRAMING PLAN A3 SCALE: 1/4”=1’-0” 1 D C B 4 FLOOR FRAMING PLAN A3 SCALE: 1/4”=1’-0” LEGEND SHEAR WALL 4X12 BEAM/GIRDER 2X6 WALL STUD 2X12 JOIST @16” O.C. SILVER LAKE MIXED-USE PROJECT INFO STRUCTURAL FRAMING PLANS S-102 Project Name: Silver Lake Mixed-Use Project Owner: Architecture Department, Cal Poly Pomona Project Address: 1650 Silver Lake Blvd, Los Angeles, CA 90026 REVISIONS NO. DESCRIPTION DATE SCALE: 1/4”=1’-0” 1 INITIAL DRAFT 03/25/2022 2 FINAL DRAFT 05/12/2022 2 3 4 WALL FRAMING PLAN A1 SCALE: 1/4”=1’-0” FLOOR FRAMING PLAN A3 SCALE: 1/4”=1’-0” 1 D C B 2 4 Electrical RCP Wall Framing Plan Shear Wall WP Wall Mounted Light Fixture Switch Recessed Can Light Fixture Refrigerator Pendant Light Fixture Clothes Washer Slim Stick Wall Mount Lighting Cooktop 4x12 Beam/Girder 2x6 Wall Stud 2x12 Joist @16”O.C. Floor Framing Plan HVAC RCP One Bedroom Natural Light Study - June 21st, 3pm PST, Los Angeles, CA One Bedroom Unit Floor Plan - 660 SF Living, 158 SF Balcony LIVING ROOM BATHROOM BEDROOM KITCHEN W/D ONE BEDROOM UNIT FLOOR PLAN - 660 SF LIVING, 158 SF BALCONY C1 SCALE: 1/4”=1’-0” C3 ONE BEDROOM UNIT ELECTRICAL RCP A3 SCALE: 1/4”=1’-0” ONE BEDROOM UNIT HVAC RCP A1 SCALE: 1/4”=1’-0” WP WALL MOUNTED LIGHT FIXTURE RECESSED CAN LIGHT FIXTURE PENDANT LIGHT FIXTURE SLIM STICK WALL MOUNT LIGHTING DUPLEX OUTLET SWITCH REFRIGERATOR CLOTHES WASHER COOKTOP EXHAUST THERMOSTAT GARBAGE DISPOSAL SMOKE DETECTOR CABLE JACK ELECTRICAL SILVER LAKE MIXED-USE PROJECT INFO UNIT FLOOR PLANS A-402 Project Name: Silver Lake Project Owner: Architecture Department, Pomona Project Address: 1650 Silver Blvd, Los CA 90026 REVISIONS NO. DESCRIPTION SCALE: 1/4”=1’-0” INITIAL DRAFT FINAL DRAFT LEGEND HVAC SOFFIT EXHAUST SUPPLY VENT RETURN VENT DUCT SUPPLY RETURN contact@garchitecture.com C B A GD R CT P TV CW WP WP GD R CT P T TV S CW WP 13’-6” 7’-6” 11’-9” 21’-5” 7’-9” 10’-9” 20’-1” 16’-5” 12’-10” +8’-6” A.F.F. +7’-6” A.F.F. C1 A-406 W-04 D-06 W-04 W-04 W-03 D-02 D-01 LIVING ROOM BEDROOM ONE BEDROOM
SCALE: 1/4”=1’-0” C3
LAKE
UNIT FLOOR PLAN - 660 SF LIVING, 158 SF BALCONY C1
A3 SCALE:
ONE
BEDROOM
UNIT ELECTRICAL RCP
1/4”=1’-0”
WP WALL MOUNTED LIGHT FIXTURE RECESSED CAN LIGHT FIXTURE PENDANT LIGHT FIXTURE SLIM STICK WALL MOUNT LIGHTING DUPLEX OUTLET SWITCH REFRIGERATOR CLOTHES WASHER COOKTOP EXHAUST THERMOSTAT GARBAGE DISPOSAL SMOKE DETECTOR CABLE JACK ELECTRICAL LEGEND HVAC SOFFIT EXHAUST SUPPLY VENT RETURN VENT DUCT SUPPLY RETURN C B A GD CT P TV CW WP WP GD R CT P T TV S CW WP 13’-6” 11’-9” 21’-5” 7’-9” 10’-9” 20’-1” 16’-5” 12’-10” +8’-6” A.F.F. +7’-6” A.F.F. W-04 D-06 W-04 W-04 D-02 D-01 Supply Vent Return Vent Supply Return 25
ONE
BEDROOM
UNIT HVAC RCP A1
SCALE: 1/4”=1’-0”
GA
PROJECT
SILVER LAKE MIXED-USE
+0’-0” GROUND LEVEL +13’-0” T.O. GROUND LEVEL +15’-0” A.F.F. PLATEAU LEVEL +25’-0” A.F.F. THIRD LEVEL +35’-10” A.F.F. ROOFTOP TERRACE +8’-9” BOT WOOD SIDING +23’-6” T.O. PLATEAU LEVEL +33’-6” T.O. THIRD LEVEL +39’-7” T.O. GUARDRAIL GArchitecture SILVER LAKE MIXED-USE PROJECT INFO ENLARGED DETAIL SECTION AND ELEVATION A-511 Project Name: Silver Lake Mixed-Use Project Owner: Architecture Department, Pomona Project Address: 1650 Silver Blvd, Los CA 90026 REVISIONS NO. DESCRIPTION 1 INITIAL DRAFT 2 FINAL DRAFT ARCHITECT Galin Aghkyan 1234 Random St., Los Angeles, CA 90013 contact@garchitecture.com 1 2 3 4 A3 A-503 FA-2 FA-1 RA-2 +0’-0” GROUND LEVEL +13’-0” T.O. GROUND LEVEL +15’-0” A.F.F. PLATEAU LEVEL +25’-0” A.F.F. THIRD LEVEL +35’-10” A.F.F. ROOFTOP TERRACE +8’-9” BOT WOOD SIDING +23’-6” T.O. PLATEAU LEVEL +33’-6” T.O. THIRD LEVEL +39’-7” T.O. GUARDRAIL
rchitecture
INFO ENLARGED DETAIL SECTION AND ELEVATION A-511 Project Name: Silver Lake Mixed-Use Project Owner: Architecture Department, Cal Poly Pomona Project Address: 1650 Silver Lake Blvd, Los Angeles, CA 90026 REVISIONS NO. DESCRIPTION DATE 1 INITIAL DRAFT 03/25/2022 2 FINAL DRAFT 05/12/2022 ARCHITECT Galin Aghkyan 1234 Random St., Los Angeles, CA 90013 contact@garchitecture.com 1 2 3 4 A3 A-503 FA-2 FA-1 RA-2 Building Fragment Detail Section Building Fragment Detail Elevation 5’ 3’ 1’ 0’ 26
3” mulch layer precast concrete geotextile membrane overflow drain drainage board perforated pipe direct overflow discharge
metal top rail channel weld rods
3/4” tempered glass bar post beyond
aluminum shoe safety wedge set boxed stringer
wood siding
3 part stucco
2 layers of weather barrier plywood sheathing batt insulation blocking aluminum blocking head filler / closer insulated glass unit (IGU)
gypsum wallboard hat channel
3 part stucco
2x12 floor joist batt insulation sound attenuation mat plywood sheathing cement protection board blocking gutter PVC membrane wood decking cement protection board
gypsum wallboard hanger rod structural concrete gutter blocking wood decking
wood siding
furring strip
weather barrier
D C B A 3 PART STUCCO WOOD DECKING PVC MEMBRANE GUTTER BLOCKING CEMENT PROTECTION BOARD PLYWOOD SHEATHING SOUND ATTENUATION MAT BATT INSULATION 2X12 FLOOR JOIST HAT CHANNEL GYPSUM WALLBOARD 3 PART STUCCO WOOD DECKING CEMENT PROTECTION BOARD BLOCKING GUTTER STRUCTURAL CONCRETE HANGER ROD GYPSUM WALLBOARD WOOD SIDING FURRING STRIP WEATHER BARRIER 2 LAYERS OF WEATHER BARRIER PLYWOOD SHEATHING BATT INSULATION BLOCKING ALUMINUM BLOCKING HEAD FILLER/CLOSER INSULATED GLASS UNIT (IGU) WOOD SIDING DETAIL A1 SCALE: 3”=1’-0” GLASS GUARDRAIL DETAIL A2 SCALE: 1/2”=1’-0” SLIDING DOOR DETAIL A3 SCALE: 1 1/2”=1’-0” PLANTER BOX DETAIL C1 SCALE: 1 1/2”=1’-0” COURTYARD GUARDRAIL DETAIL C2 SCALE: 3”=1’-0” PARAPET DETAIL C3 SCALE: 3”=1’-0” GArchitecture SILVER LAKE MIXED-USE PROJECT INFO DETAILS A-521 Project Name: Silver Lake Mixed-Use Project Owner: Architecture Department, Cal Poly Pomona Project Address: 1650 Silver Lake Blvd, Los Angeles, CA 90026 REVISIONS NO. DESCRIPTION DATE SCALE: AS INDICATED 1 INITIAL DRAFT 03/25/2022 2 FINAL DRAFT 05/12/2022 ARCHITECT Galin Aghkyan 1234 Random St., Los Angeles, CA 90013 contact@garchitecture.com D C B A PRECAST CONCRETE WITH WATERPROOF MEMBRANE 3” MULCH LAYER GEOTEXTILE MEMBRANE DRAINAGE BOARD 6” DIAMETER OVERFLOW DRAIN DIRECT OVERFLOW DISCHARGE 4” DIAMETER PERFORATED PIPE WOOD SIDING FURRING STRIP WEATHER BARRIER STRUCTURAL CONCRETE GUTTER FLASHING GUTTER BASE PLATE FLEXIBLE FLASHING FLASHING TAPE 2” TUBE STEEL (6” O.C.) WEEP SCREED ALUMINUM SHOE SAFETY WEDGE SET METAL TOP RAIL CHANNEL WELD RODS 3/4” TEMPERED GLASS BAR POST BEYOND BOXED STRINGER HEM COVER SILL PAN HEAD HEAD FILLER CLOSER INSULATED GLASS UNIT (IGU) COPING CAP PVC BONDING ADHESIVE HEAT WELDED LAP PVC MEMBRANE METAL HOOK STRIP FLEXIBLE FLASHING FLASHING TAPE 4X12 BEAM 2X6 JOIST RA-1 SLOPE TO DRAIN 1/4” 1’-0” FA-3 FA-2 WA-1 WA-1 SLOPE TO DRAIN 1/4” 1’-0” GLASS GUARDRAIL DETAIL A2 SCALE: 1/2”=1’-0” SLIDING DOOR DETAIL A3 SCALE: 1/2”=1’-0” COURTYARD GUARDRAIL DETAIL C2 SCALE: 3”=1’-0” PARAPET DETAIL C3 SCALE: 3”=1’-0” SILVER LAKE MIXED-USE PROJECT INFO DETAILS A-521 Project Name: Silver Lake Mixed-Use Project Owner: Architecture Department, Cal Poly Pomona Project Address: 1650 Silver Lake Blvd, Los Angeles, CA 90026 REVISIONS NO. DESCRIPTION DATE SCALE: AS INDICATED 1 INITIAL DRAFT 03/25/2022 2 FINAL DRAFT 05/12/2022 Galin Aghkyan 1234 Random St., Los Angeles, CA 90013 contact@garchitecture.com CONCRETE WATERPROOF MEMBRANE LAYER GEOTEXTILE MEMBOARD DIAMETER OVERFLOW DRAIN OVERFLOW DISCHARGE DIAMETER PERFORATED PIPE GUTTER FLASHING GUTTER BASE PLATE FLEXIBLE FLASHING FLASHING TAPE 2” TUBE STEEL (6” O.C.) WEEP SCREED ALUMINUM SHOE SAFETY WEDGE SET METAL TOP RAIL CHANNEL WELD RODS 3/4” TEMPERED GLASS BAR POST BEYOND BOXED STRINGER HEM COVER SILL PAN HEAD HEAD FILLER CLOSER INSULATED GLASS UNIT (IGU) PVC MEMBRANE 4X12 BEAM 2X6 JOIST RA-1 SLOPE TO DRAIN 1/4” 1’-0” FA-3 FA-2 WA-1 WA-1 SLOPE TO DRAIN 1/4” 1’-0” WOOD SIDING DETAIL A1 SCALE: 3”=1’-0” GLASS GUARDRAIL DETAIL A2 SCALE: 1/2”=1’-0” SLIDING DOOR DETAIL A3 SCALE: 1 1/2”=1’-0” PLANTER BOX DETAIL C1 SCALE: 1 1/2”=1’-0” COURTYARD GUARDRAIL DETAIL C2 SCALE: 3”=1’-0” PARAPET DETAIL C3 SCALE: 3”=1’-0” GArchitecture SILVER LAKE MIXED-USE PROJECT INFO DETAILS A-521 Project Name: Silver Lake Mixed-Use Project Owner: Architecture Department, Cal Poly Pomona Project Address: 1650 Silver Lake Blvd, Los Angeles, CA 90026 REVISIONS NO. DESCRIPTION DATE SCALE: AS INDICATED 1 INITIAL DRAFT 03/25/2022 2 FINAL DRAFT 05/12/2022 ARCHITECT Galin Aghkyan 1234 Random St., Los Angeles, CA 90013 contact@garchitecture.com 1 D C B A 2 3 4 PRECAST CONCRETE WITH WATERPROOF MEMBRANE 3” MULCH LAYER GEOTEXTILE MEMBRANE DRAINAGE BOARD 6” DIAMETER OVERFLOW DRAIN DIRECT OVERFLOW DISCHARGE 4” DIAMETER PERFORATED PIPE WOOD SIDING FURRING STRIP WEATHER BARRIER STRUCTURAL CONCRETE GUTTER FLASHING GUTTER BASE PLATE FLEXIBLE FLASHING FLASHING TAPE 2” TUBE STEEL (6” O.C.) WEEP SCREED ALUMINUM SHOE SAFETY WEDGE SET METAL TOP RAIL CHANNEL WELD RODS 3/4” TEMPERED GLASS BAR POST BEYOND BOXED STRINGER HEM COVER SILL PAN HEAD HEAD FILLER CLOSER INSULATED GLASS UNIT (IGU) COPING CAP PVC BONDING ADHESIVE HEAT WELDED LAP PVC MEMBRANE METAL HOOK STRIP FLEXIBLE FLASHING FLASHING TAPE 4X12 BEAM 2X6 JOIST RA-1 SLOPE TO DRAIN 1/4” 1’-0” FA-3 FA-2 WA-1 WA-1 SLOPE TO DRAIN 1/4” 1’-0”
Siding Detail
Fragment - Details
furring strip weather barrier structural concrete Wood
3D
Glass Guardrail Detail Planter Box Detail
27