What Is Demolition And How To Survey Before Demolition

Page 1

What Is Demolition And How To Survey Before Demolition?

Variousreasonsarerequiredforthedemolitionofbuildingsandstructures and to hire Demolition Service in Los Angeles. Buildings and other structures are described in terms of demolition methods and processes.

Buildings and structures have a design life that describes the lifespan of their design. An 80-100 year lifespan is considered when designing the building.Astructurethathasreachedtheendofitsdesignlifeisnolonger safe for living space and neighboring buildings. Buildings can be demolishedforseveralreasons,includingreplacingtheoldstructurewitha new one. Any structural damage or loss of stability to the structure.

Buildingbigstructuresrequiresthedemolitionofsmallones.

What is demolition?

Demolitionisdestroying,tearingdown,orremovingsomething.Duringthe demolition of a building, pre-planned and controlled methods are used to removeordestroyastructureafteritsserviceablelife.

Building and other Structure Demolition Methods

Buildingsaredemolishedusingexplosiveswhenanimplosionoccurs.
For buildings
are two types of demolition methods 1. Demolitionusing
2. Demolitionbyexplosives. 3. Demolition surveying of buildings Structures
are
divided
they  Surveyingofbuildings  Surveyingofstructures 1. Surveying of buildings Buildingsfordemolitionaresurveyedusingthefollowing
1. Materialtypesusedinconstruction 2. During
and structures, there
non-explosivemeans
and their surroundings
studied while surveying. Surveying can be
into two types. As a result,
process:
demolition,thebuildingwasusedbothpriorandpresent.
wastewater,
explosives,andradioactivematerialsare
4. Erosion, flooding, and pollution problems
to drainage conditions. 5. A common staircase and partition walls are shared with the adjoining building. 6. Conditionsofadjacentpedestrianandvehiculartraffic 7. Noisy,dusty,vibrating,andtraffic-impactedneighborhoodsensitivity. 2. Structural Surveying Demolitioninvolvesthefollowingprocessesinthestructuralsurvey: 1. Constructedinthismanner 2. Basements, underground tanks, and underground vaults have their ownstructuralsystemandstructuralconditions. 3. Originallyusedinthedesignasastructuralsystem. In what condition is the building? Hazardous materials must be removed.
3. Amongotherthings,
hazardousmaterials,toxicchemicals, flammables,
present.
related

During the investigation of the site for demolition, hazardous materials such as asbestos, minerals, petroleum contamination, and radioactive metals may be found. Prior to demolition, hazardous materials are removedfromthesitebyspecializedpersonnel.

Demolition of structures according to a demolition plan

The different demolition processes involved are outlined in a detailed demolitionplan,whichincludes:

A location where the building will be demolished. Thestructuretobedemolishedisadjacenttobuildings,streets,structures, andstreetfurniture.

Support systems for the building's structural integrity.

Anoutlineofthedemolitionprocess,detailingthesequenceandmethodof demolishingstructuralmembersinthebuilding.

Including hoardings, walkways with covered walkways, catch platforms, catchfans,scaffolding,safetyscreens,andsafetynets,thisplanoutlines all preventionmeasuresfortheprotectionofthepublic.

The method of handling debris from demolished buildings. Determininghowlongitwilltaketocompletethedemolitionprocess,etc. Contact:Business Name /Contact Person: Gabriel Tree Services Country/Region: USA Street Address: 11528 Felton Ave City: Los Angeles State: CA Postal Code: 90045 Phone No: 1323-515-5178 Email Address: gabrieltreeservices.com Website: https://www.gabrieltreeservices.com/ Thank You

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.