Drawing Document

Page 1

PDF processed with CutePDF evaluation edition www.CutePDF.com


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

A1

DRAWING SCHEDULE CLIENT: PAUL DOLAN PROJECT: ATHLONE IT WASTEWATER TREATMENT FACILITY

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

DRAWING NO. 13_AD_001 13_AD_002 13_AD_003 13_AD_004 13_AD_005 13_AD_006 13_AD_007 13_AD_008 13_AD_009 13_AD_010 13_AD_011

REVISION NO.

DATE 03/04/2013 03/04/2013 03/04/2013 19/04/2013 03/04/2013 03/04/2013 15/04/2013 03/04/2013 03/04/2013 12/04/2013 03/04/2013

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

DRAWING TITLE DRAWING SCHEDULE GENERAL NOTES SITE LOCATION MAP WWT FACILITY LAYOUT WWT FACILITY PROCESS DIAGRAM INLET WORKS AND ANCILLARIES PRIMARY SETTLEMENT TANK TREATMENT UNIT SEWER NETWORK SEWER PIPELINE SECTIONS SEWER NETWORK STRUCTURES

DRAWING NO. EXPLANATORY NOTES 13_AD_000

UNIQUE DRAWING I.D. NUMBER YEAR IN WHICH DRAWING WAS FIRST DRAFTED

CORRESPONDS TO THE CONTRACT NUMBER FOR THE GIVEN YEAR CORRESPONDS TO THE CONTRACT STAGE D = DESIGN STAGE T = TENDER STAGE C = CONSTRUCTION STAGE A = AS BUILT (CLOSING STAGE)

REV NO:

ON ORIGINAL

0

10

REVISION NOTE:

DWN BY:

CKD BY:

G1 SchemeDesign Consulting Engineers Ltd. Expertise, Technology, Results

25 20

30

40

50mm

CLIENT:

Paul Dolan Athlone IT, Wastewater Treatment Facility

PROJECT:

Drawing Schedule

TITLE: DRAWN:

CHECKED:

FK

SITE LOCATION

Datum: Grid System:

Malin Head ITM

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

15 5

DATE:

DATE:

03/04/2013

APPROVED:

LM

JC SCALE:

N/A

DRAWING NO:

13_AD_001

REV:


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

A1

GENERAL NOTES

REINFORCED CONCRETE

MASONRY

1 CONCRETE CONSTRUCTION SHALL BE IN ACCORDANCE WITH BS EN 1992. CEMENT SHALL BE ORDINARY PORTLAND CEMENT COMPLYING WITH IS EN 197 UNLESS OTHERWISE APPROVED. REINFORCEMENT SHALL BE HOT ROLLED DEFORMED BARS COMPLYING WITH BS 8866. ALL HIGH YIELD BARS SHALL BE DEFORMED BARS TYPE 2. STEEL FABRIC SHALL COMPLY WITH BS 4483.

1 MASONRY CONSTRUCTION SHALL CONFORM WITH IS325 AND BS 5628. BLOCKS SHALL BE CONCRETE MASONRY UNITS CONFORMING TO BS 6073. SAND FOR MORTAR SHALL COMPLY WITH BS 1200. CEMENT SHALL BE ORDINARY PORTLAND CEMENT TO IS1 OR BS12.

GENERAL NOTATION

INSPECTIONS 1 STRUCTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH STRUCTURAL SPECIFICATIONS, ALL ARCHITECTURAL AND SERVICES DRAWINGS AND SPECIFICATIONS. 2 THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO BRACING, SHORING OF LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC. BEFORE RELATED WORK COMMENCES THE CONTRACTOR SHALL SUBMIT A METHOD STATEMENT AND SEQUENCE OF WORK TO THE ENGINEER AND ARCHITECT. 3 THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS WITH ARCHITECTURAL DRAWINGS PRIOR TO START OF CONSTRUCTION. ALL DISCREPANCIES TO BE NOTIFIED, IN WRITING TO ENGINEERS AND ARCHITECTS FOR RESOLUTION. 4 CONSTRUCTION MATERIAL SHALL BE SPREAD OUT IF PLACED ON FRAMED FLOORS OR ROOF, IN SUCH A MANNER THAT THE STRUCTURE IS NOT OVERLOADED IN EITHER THE PERMANENT OR TEMPORARY CONDITION WHERE REFERENCE IS MADE TO VARIOUS TEST STANDARDS FOR MATERIALS, SUCH STANDARDS SHALL BE THE LATEST EDITION AND/OR ADDENDUM. OTHER STANDARDS MAY BE CONSIDERED BUT ONLY WITH PRIOR APPROVAL BY THE ENGINEER. 5 CONTRACTOR TO ESTABLISH AND VERIFY ALL OPENINGS AND INSERTS FOR ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING WITH APPROPRIATE TRADES, DRAWINGS AND SUBCONTRACTORS PRIOR TO CONSTRUCTION. 6 OPTIONS ARE FOR CONTRACTORS CONVENIENCE. HE SHALL BE RESPONSIBLE FOR ALL CHANGES NECESSARY IF HE CHOOSES AN OPTION AND HE SHALL COORDINATE ALL DETAILS.

8 FOR CLARITY, ALL ROOF AND FLOOR OPENINGS MAY NOT BE SHOWN ON FRAMING PLANS. FOR EXACT SIZE, NUMBER AND LOCATION FOR OPENING, SEE ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS. WHERE OPENINGS ARE INDICATED ON THE STRUCTURAL DRAWINGS, THESE ARE TO BE CHECKED BY THE CONTRACTOR AGAINST RELEVANT SERVICE ENGINEERS OR SUBCONTRACTORS DRAWINGS PRIOR TO CONSTRUCTION.

1.

WHEN THE SUBGRADE HAS BEEN EXPOSED

2.

WHEN THE REINFORCEMENT HAS BEEN FIXED, CHECKED AND IS READY FOR CONCRETING.

3.

BEFORE TAKING REMEDIAL ACTION TO CORRECT IMPERFECTIONS IN CONCRETE.

4.

2 ALL CONCRETE SHALL BE IN ACCORDANCE WITH IS EN 206-1. 3 NOMINAL CONCRETE COVER TO REINFORCEMENT SHALL BE AS FOLLOWS UNLESS OTHERWISE NOTED ON DRAWINGS : *SURFACE POURED AGAINST EARTH, 75mm *SURFACE POURED AGAINST FORMWORK 30mm *BUT IN CONTACT WITH EARTH 50mm *BEAMS, COLUMN, WALLS 35mm *SLABS 30mm

BEFORE FINISH PAINTING STEEL FRAMEWORKS.

5.

BEFORE GROUTING-IN STEEL FRAMEWORKS.

6.

BEFORE SHEETING OR BRICKING IN STEEL FRAMEWORKS.

6 FOR POSITIONING AND TREATMENT OF CONSTRUCTION JOINTS PROPOSALS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW PRIOR TO CONSTRUCTION.

FOR LEVELS TO TOP OF ALL FOUNDATIONS REFER TO FOUNDATION LAYOUT DRAWING & SECTIONS THEREOF. THE EXCAVATION SHOULD BE TAKEN TO THE STIFF BROWN GRAVELLY CLAY, WHICH HAS AN ALLOWABLE BEARING CAPACITY OF 200 Kn/m2. THIS LAYER IS APPROXIMATELY 2.5-3.5 METRES BELOW EXISTING GROUND LEVEL. THIS IS REQUIRED UNDER ALL PADS AND STRIPS AND BACKFILLED WITH LEAN MIX CONCRETE.

7 MOVEMENT JOINT FILLER SHALL BE A COMPRESSIBLE FIBRE BOARD SUCH AS HYDROCELL XL BY FOSROC INTERNATIONAL OR SIMILAR APPROVED. 8 MOVEMENT JOINT SEALANT SHALL BE A TWO PART POLYSULPHIDE SEALANT SUCH AS THIOFLEX 600 BY FOSROC INTERNATIONAL OR AN APPROVED EQUAL, UNLESS NOTED OTHERWISE.

2 CONCRETE BLINDING SHALL BE PROVIDED UNDER ALL FOUNDATIONS TO A MINIMUM THICKNESS OF 75mm. EXCAVATED SURFACES SHALL BE FREE OF LOOSE MATERIAL, DRY AND BLINDED AS SOON AS POSSIBLE AFTER INSPECTION OF BEARING SURFACES BY THE ENGINEER.

9 CONCRETE VERTICAL SURFACES ADJOINING MASONRY WALLS SHALL BE CAST WITH A CONTINUOUS STAINLESS STEEL PROPRIETARY CHANNEL BY ANCON CCL OR SIMILAR APPROVED. 10 CONCRETE CUBES SHALL BE TAKEN AT A RATE IN ACCORDANCE WITH THE SPECIFICATION, WITH A MINIMUM OF ONE SET PER DAY PER CLASS OF CONCRETE. CUBES SHALL BE TESTED AT 7 AND 28 DAYS. ALL THE RESULTS SHALL BE FORWARDED DIRECTLY TO THE ENGINEER

3 FOUNDATIONS TO BE CENTERED UNDER WALLS UNLESS NOTED OTHERWISE ON THE DRAWINGS.

9 ALL LEVELS ARE RELATED TO AN ARBITARY DATUM 11 ALL SAMPLING AND TESTING OF CONCRETE TO COMPLY WITH IS EN 12350 AND IS EN 12390.

10 FOR LOCATION AND DETAILS OF ELECTRICAL EARTHING OF STRUCTURE REFER TO ELECTRICAL DRAWINGS AND DETAILS.

12 CORE DRILLING OF ANY REINFORCED CONCRETE ELEMENTS OF THE WORK SHALL NOT BE ALLOWED WITHOUT THE PRIOR WRITTEN APPROVAL OF THE ENGINEER.

11 FOR FIRE PROOFING REQUIREMENTS REFER TO RELEVANT ARCHITECTS DRAWINGS AND RELEVANT FIRE SAFETY CERTIFICATE DRAWINGS.

13 150mm KICKERS ARE TO BE UTILISED FOR ALL RISING ELEMENTS.

12 ALL DPMs, DPCs, CAVITY WALL DRAINAGE, INTERNAL DRAINAGE, RADON PROTECTION BARRIERS AND SUMPS, ETC. TO ARCHITECTS SPECIFICATION & DETAILS.

14 REINFORCEMENT BAR NOTATION:

T2 - BOTTOM LAYER OF TOP REINFORCEMENT T1 - TOP LAYER OF TOP REINFORCEMENT B - BOTTOM B1 - BOTTOM LAYER OF BOTTOM REINFORCEMENT B2 - TOP LAYER OF BOTTOM REINFORCEMENT T - TOP BARS EF - EACH FACE N1 - OUTER LAYER OF NEAR FACE N2 - INNER LAYER OF NEAR FACE F1 - OUTER LAYER OF FAR FACE F2 - INNER LAYER OF FAR FACE ABR - ALTERNATE BARS REVERSED SFL - STRUCTURAL FLOOR LEVEL TOC - TOP LEVEL OF STRUCTURAL CONCRETE FFL - FINISHED FLOOR LEVEL T.O.S - TOP OF STEEL RC - REINFORCED CONCRETE PC - PRE-CAST BM. - BEAM/S COL - COLUMN/S CONC. - CONCRETE C - CENTRE LINE B - EXTENT OF EXISTING STRUCTURE - APPROXIMATELY EQUAL TO UNO - UNLESS NOTED OTHERWISE

REV NO:

ON ORIGINAL

0

5

10

REVISION NOTE:

DWN BY:

20

40

DIRECTION OF SPAN OF FLOOR DECK

9 ALL RISING WALLS SHALL BE LAID WITH FULL MORTAR COVERAGE ON HORIZONTAL AND VERTICAL FACES. 10 THE CONTRACTOR SHALL BE RESPONSIBLE FOR SHORING AND BRACING OF ALL MASONRY WALLS AS NECESSARY TO ENSURE STABILITY DURING CONSTRUCTION. SUCH SHORING AND BRACING SHALL BE MAINTAINED IN POSITION UNTIL THE MASONRY HAS ATTAINED ITS DESIGN STRENGTH AND THE RESTRAINING SUPPORT STRUCTURE IS IN PLACE. 11 BACK FILL SHALL NOT BE PLACED AGAINST WALLS WITHIN 10 DAYS OF COMPLETION OF THE WALL. THE MAXIMUM LEVEL DIFFERENCE BETWEEN BACK FILL ON EITHER SIDE OF A MASONRY WALL SHALL BE 225mm. HEAVY EQUIPMENT USED IN BACK FILLING SHALL NOT OPERATE CLOSER TO THE WALL THEN A DISTANCE EQUAL TO THE HEIGHT OF THE BACK FILL ABOVE THE FOOTING. 12 REQUIREMENTS FOR REINFORCED MASONRY : *CONCRETE FOR FILLING CORES OR EMBEDDING REINFORCING BARS SHALL BE C30/37 XC4 CL-0.4 UNLESS NOTED OTHERWISE ON DRAWINGS. *MAXIMUM AGGREGATE SIZE 10mm. *VERTICAL BAR REINFORCEMENT SHALL BE SECURED IN POSITION *CAVITIES CONTAINING REINFORCEMENT SHALL BE COMPLETELY FILLED WITH CONCRETE AND CLEANED OUT OPENINGS SHALL BE PROVIDED AT THE BASE OF VERTICAL CORES. 13 FOR LINTEL DETAILS REFER TO PROJECT DETAIL DRAWINGS, MANUFACTURERS SPECIFICATION AND ORS MASONRY SPECIFICATION. 14 REFER TO ARCHITECTS DRAWING FOR DETAILS OF SETTING OUT TO MASONRY WALLS. 15 REINFORCED U-BLOCK TO BE PROVIDED AT CILL LEVEL OF ALL WINDOW OPES.

Paul Dolan Athlone IT Wastewater Treatment Facility

PROJECT:

GENERAL NOTES

TITLE: DRAWN:

CHECKED:

LM

SITE LOCATION

STRUCTURAL STEEL BEAM ON PLAN

8 FOR MASONRY CONSTRUCTION DURING COLD WEATHER REFER TO THE SPECIFICATIONS AND THE PROVISIONS OF BS 5628.

I:\cover pic.jpg Malin Head ITM

DETAILED SECTION 1-1 SHOWN ON DRAWING 061_127-556

7 CAVITY WALL TIES SHALL BE STAINLESS STEEL TYPE 1 TIES IN ACCORDANCE WITH BS DD140 UNLESS OTHERWISE NOTED ON DRAWINGS. TIES SHALL BE SPACED IN ACCORDANCE WITH THE SPECIFICATION AND IS325, PART 1.

50mm

Datum: Grid System:

1 556

6 RISING WALL INTERSECTIONS SHALL BE TIED TOGETHER IN A MASONRY BOND. OTHER WALLS SHALL BE TIED IN MASONRY BOND AT CORNERS UNLESS NOTED OTHERWISE ON DRAWINGS. ALL BLOCKWORK ADJACENT TO CONCRETE WALLS TO BE TIED TO CONCRETE USING WALL TIES COMPLYING WITH 7. BELOW

G1 Schemedesign Consulting EngineersLtd. 30

RISING BLOCKWORK

5 BED JOINT REINFORCEMENT WHERE REQUIRED SHALL BE "BRICKFORCE REINFORCEMENT" BY BRC BUILDING PRODUCTS OR SIMILAR APPROVED. BED JOINT REINFORCEMENT SHALL BE PROVIDED IN ACCORDANCE WITH THE TYPE, SIZE AND SPACING INDICATED ON THE DRAWINGS. IT SHALL BE IN STAINLESS STEEL GRADE 304, UNLESS NOTED OTHERWISE ON THE DRAWINGS.

CLIENT:

25

HIDDEN CONCRETE OUTLINES

3 THE CHARACTERISTIC COMPRESSIVE STRENGTH OF THE BLOCKS SHALL BE 5MPA UNLESS NOTED OTHERWISE. BLOCKS SHALL BE TESTED AT A RATE OF 5 PER 1000 BY AN INDEPENDENT TESTING AGENCY.

CKD BY:

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

15

DATE:

RISING CONCRETE OUTLINES

4 MORTAR SHALL COMPLY WITH THE MIX DESIGNATED FOR GRADE (III) GIVEN IN TABLE 1, IS325, PART 1 UNLESS OTHERWISE STATED ON DRAWINGS. MORTAR TESTING SHALL BE IN ACCORDANCE WITH BS 5628, APPENDIX A.1.

5 FOR CONCRETING IN COLD WEATHER REFER TO THE CONCRETE SPECIFICATION AND TO THE PROVISIONS OF BS 8110.

1

2 BLOCKS FOR RISING WALLS SHALL BE SOLID UNITS. BLOCK SIZES FOR OTHER AREAS SHALL BE AS INDICATED ON DRAWINGS OR SPECIFICATIONS. JOINT THICKNESS SHALL BE 10mm.

DIRECTION OF SPAN OF 200 DEEP FLOOR SLAB

VOID IN CONCRETE

4 CONCRETE BLINDING SHALL BE (C12/15) X0. ALL OTHER CONCRETE SHALL BE C30/37 XC4 CL-0.4

FOUNDATIONS

200 PC H/CORE

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

7 ALL DIMENSIONS ON DRAWINGS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED. WRITTEN DIMENSIONS ONLY APPLY. DRAWINGS ARE NOT TO BE SCALED.

ENGINEER'S APPROVAL WILL BE REQUIRED BEFORE PROCEEDING FURTHER AT EACH OF THE FOLLOWING STAGES. IN EACH CASE, THE CONTRACTOR SHALL PROVIDE A MINIMUM OF 48 HOURS NOTICE TO THE ENGINEER FOR INSPECTION.

DATE:

03/04/2013

APPROVED:

FK SCALE:

N/A

DRAWING NO:

13_AD_002

REV:


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

A1

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

REV NO:

ON ORIGINAL

5

10

REVISION NOTE:

DWN BY:

CKD BY:

G1 SchemeDesign Consulting Engineers Ltd. Expertise, Technology, Results

25 20

30

40

50mm

CLIENT:

Paul Dolan Athlone IT Wastewater Treatment Facility

PROJECT:

Site Location Map

TITLE: DRAWN:

CHECKED:

FK

SITE LOCATION

Datum: Grid System:

Malin Head ITM

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

15 0

DATE:

DATE:

03/04/2013

APPROVED:

LM

JC SCALE:

1:1250

DRAWING NO:

13_AD_003

REV:



PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

A1

Athlone IT Wasrewater Treatment Facility - Process Diagram

Direction of Flow Hydraulic Flow Influent Collection MH 122 Invert level 99.070m

Pumped Flow

Inlet Works Pipe Invert Level 97.94m

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Screenings

Effluent Discharge MH 111 Invert level 97.162m

Skip

Municipal Discharge MH 131 Invert level 96.528m

Treatment unit - Pumped Flow Bio-film Reactor Cover Level 98.0m Invert Level 96.0m Discharge Reactor

Feed Reactor

Back Drop MH 112 Invert level 94.484m

Buffer Tank Cover Level 98.0m Invert Level 95.5m

Primary Settlement Tank Cover Level 98.0m Invert Level 95.5m

Pumping Station Invert level 89.415m

Invert level 96.520m

Invert level 92.869m

REV NO:

ON ORIGINAL

0

10

REVISION NOTE:

DWN BY:

CKD BY:

G1 SchemeDesign Consulting Engineers Ltd. Expertise, Technology, Results

25 20

30

40

50mm

CLIENT:

Paul Dolan Athlone IT Wastewater Treatment Facility

PROJECT:

WWT Facility Process Diagram

TITLE: DRAWN:

CHECKED:

APPROVED:

JC

LM

FK

SITE LOCATION

Datum: Grid System:

Malin Head ITM

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

15 5

DATE:

DATE:

03/04/2013

SCALE:

N/A

DRAWING NO:

13_AD_005

REV:

0000


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

A1

Inlet Works Pipe Invert Level 97.94m

Augar housing Screenings

Flow

Flow

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Skip Overflow pipe Ground Level

Treatment Unit Elevational Section

Screenings Flow

Treatment Unit Elevation Overflow pipe

Overflow channel Flow

Treatment Unit Elevation

REV NO:

ON ORIGINAL

0

10

REVISION NOTE:

DWN BY:

CKD BY:

G1 SchemeDesign Consulting Engineers Ltd. Expertise, Technology, Results

25 20

30

40

50mm

CLIENT:

Paul Dolan Athlone IT Wastewater Treatment Facility

PROJECT:

Inlet Works and Ancillaries

TITLE: DRAWN:

CHECKED:

FK

SITE LOCATION

Datum: Grid System:

Malin Head ITM

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

15 5

DATE:

DATE:

03/04/2013

APPROVED:

LM

JC SCALE:

1:20

DRAWING NO:

13_AD_006

REV:

0000


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

A1

FORM NO FRM-010 PRODUCED

REVISION 1 REVISION DATE 05/12/11 BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

REV NO:

ON ORIGINAL

15 0

5

10

REVISION NOTE:

DWN BY:

CKD BY:

G1 SchemeDesign Consulting Engineers Ltd. Expertise, Technology, Results

25 20

30

40

50mm

CLIENT:

PAUL DOLAN

PROJECT:

AIT WASTEWATER TREATMENT FACILITY PROCESS STAGE

TITLE:

PRIMARY SETTLING TANK STEEL REINFORCEMENT DETAILS

DRAWN:

CHECKED:

LM

SITE LOCATION

Datum: Grid System:

Malin Head ITM

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

DRAFT

DATE:

DATE:

15/04/2013

APPROVED:

JC SCALE:

DRAWING NO:

13_AD_007

REV:


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

A1

PFBR Treatment Unit

Treatment Unit Elevation

Note: Primary settlement and buffer tank details can be seen in drawing 13_AD_007

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Inlet Pipe Primary Settlement Tank

Buffer Tank

Dry Well Mounted Pump to take Sludge from the Reactor Tanks to the Screening Manhole Dry Well Mounted Pump to take effluent from the Buffer Tank to the Feed Reactor

Discharge Manhole

Discharge Reactor

Feed Reactor

Dry Well Mounted Pump to take effluent from Feed Reactor to Discharge Reactor

Dry Well Mounted Pump to take effluent from Discharge Reactor to Feed Reactor or Discharge Manhole

Treatment Unit Plan

REV NO:

ON ORIGINAL

0

10

REVISION NOTE:

DWN BY:

CKD BY:

G1 SchemeDesign Consulting Engineers Ltd. Expertise, Technology, Results

25 20

30

40

50mm

CLIENT:

Paul Dolan Athlone IT Wastewater Treatment Facility

PROJECT:

Treatment Unit - Pumped Flow Bio-film Reactor

TITLE: DRAWN:

CHECKED:

JC

SITE LOCATION

Datum: Grid System:

Malin Head ITM

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

15 5

DATE:

DATE:

03/04/2013

APPROVED:

LM

FK SCALE:

1:40

DRAWING NO:

13_AD_008

REV:

0000


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

A1

100.367

100.078

99.999

ENGINEERING BUILDING

MH122 100.375

Pi 150 m pe103 m PV C L 17.9 Pipe 30

99.965

MH123

100.378

100.033

Pipe104 150 mm PVC Pipe L 60.682

100.111 99.963

100.361

99.986

100.381

100.067

99.918 98.224

97.732

98.664

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

99.936 97.317

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

100.212

99.205

MH124

100.350

99.656

98.110 98.717

99.405

99.860 99.934 99.571

99.610

99.827

97.420 98.086

98.698

96.978 97.268

99.142 99.268

99.130 99.835

96.943

97.574

99.467

99.717

99.396 99.267

99.429

99.710

99.623 99.911

99.819 100.070 99.669 100.565 101.309

99.865

101.453

99.921

101.777

96.323

102.172

99.179

MH112 100.272

101.527

99.685

96.190

99.205

102.095

98.872

102.012

95 Pipe e p Pi PVC 78 mm 52.8 0 L 15

100.487

98.036

98.400

98.200

100.067

98.609

95.789

CL

95.967

95.670

CL

95.549

MH113 95.616

INDOOR SPORTS ARENA

95.658

95.400

95.526

CL 95.751

99.181

50

INLET WORKS

95.927

Pip 150 m e96 m PVC L 50.4 Pipe 97 96.321

98.665

CL CL CL 96.130

100

99.164

99.327

100.300

101.188

99.862 101.537 100.544 101.312

99.377

95.886

99.648

99.851 101.687

96.346

99.367

100.326 100.477

101.405

99.363

96.263

100.850

101.876

99.391

100.207

99.902

101.360

Pipe105 C Pipe 150 mm PV L 49.791

99.857100.443

99.809

99.483 99.570

99.706

100.475

100.653

99.549

99.385

99.527

99.793

99.548

99.488

95.650

98.780

95.728

15 0

DISCHARGE MH

SETTLING TANK

99.409

99.727

95.525 95.585 95.536

95.672 95.362

95.545

98.200

PFBR UNIT

MH114

95.751

96.926

98.870 95.532

96.843

95.537

98.026

95.509

98.500

98.530

98.619

95.484

96.513

96.678 96.556

95.550

95.452

97.750

95.610 98.711

95.474

97.463

CL

98.002

MH129 95.719

97.526

96.616

96.033

95.682 95.725

CL

96.558

95.996

350

97.780

95.930

95.640 98.097

250

97.362

96.652

96.672

95.479

00

97.775

96.703

96.271

96.183

95.831

96.699

300

98.100

96.708

95.416

200

95.711

97.337

96.925

96.805

98.486

95.480

CL

96.907

96.560

97.255

95.742 97.455 97.298

96.835

97.154

TOWN SEWER COLLECTION POINT

CL

400

97.101

97.216

PUMPING STATION

97.275

97.485

CL 97.217

97.713

MH131 97.860

453 450 97.517

0

97.527

50 25 Meters

REV NO:

ON ORIGINAL

15 0

5

10

REVISION NOTE:

DWN BY:

CKD BY:

CLIENT:

25 20

30

40

PAUL DOLAN AIT WASTEWATER TREATMENT FACILITY

PROJECT:

50mm

G1 SCHEME DESIGN CONSULTING ENGINEERS LTD

SEWER NETWORK PLAN LAYOUT

TITLE: DRAWN:

CHECKED:

LM

SITE LOCATION

Datum: Grid System:

Malin Head ITM

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

DRAFT

DATE:

DATE:

03/04/2013

APPROVED:

FK SCALE:

SEE DRAWING

DRAWING NO:

13_AD_009

REV:


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

A1

0UTLET - LONGSECTION CONTINUED SCALE: H 1:500,V 1:500. DATUM: 90.000

EXISTING GROUND SURFACE

96.698

96.671

96.619

96.580

310.000

320.000

330.000

340.000

96.735 300.000

96.647

95.865 260.000

290.000

95.768 250.000

96.293

95.611 240.000

280.000

95.512 230.000

96.030

95.461 220.000

95.411 200.000

MH

95.423

95.445 190.000

95.672 150.000

95.526

95.716 140.000

180.000

95.619 130.000

95.543

95.518 120.000

170.000

95.651 110.000

Pipe108

Pipe99

95.670

95.865

90.000

80.000

70.000

60.000

50.000

40.000

30.000

20.000

10.000

MH131 1.310 VM 1200mm DIA CONC COVER LEVEL = 97.838 SUMP LEVEL = 96.528

0UTLET - LONGSECTION CONTINUED SCALE: H 1:500,V 1:500. DATUM: 90.000 EXISTING GROUND SURFACE

100mm Reinforced Concrete INV IN LEVEL = 96.53 100 99 98 97 96 95 94 93 92 91 90

96.671

96.619

96.580

96.580

96.584

96.716

96.830

96.939

97.054

97.175

97.287

97.398

97.529

97.684

97.694

320.000

330.000

340.000

350.000

360.000

370.000

380.000

390.000

400.000

410.000

420.000

430.000

440.000

450.000

452.620

Pipe109

NOTES: FOR PIPE DETAILS AND DESIGN INFORMATION SEE DESIGN DOCUMENT NAME 'PUMPING STATION AND SEWER DESIGN'

Level

00.000

MH115 Pipe98

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

FLOW PIPE - LONGSECTION SCALE: H 1:500,V 1:500. DATUM: 95.000

MH122

DRAFT 15 0

5

10

EXISTING GROUND SURFACE

REVISION NOTE:

DWN BY:

30

40

70.000

80.000

90.000

100.211

99.886

99.574

135.068

60.000 100.247

120.000

50.000 100.222

110.000

40.000 100.213

100.000

30.000

CKD BY:

CLIENT:

G1 SchemeDesign Consulting Engineers Ltd. Expertise, Technology, Results

25 20

105 104 103 102 101 100 99 98 97 96 95

PFBR UNIT

Pipe105

130.000

Pipe104

100.242

100.297

DATE:

MH124

20.000

10.000

Existing Levels

MH123

100.260

Chainage

00.000

Pipe103

100.375

Level

REV NO:

ON ORIGINAL

105 104 103 102 101 100 99 98 97 96 95

Level

INLET WORKS SEE DRAWING No. 13_AD_006 FOR DETAILS

ENGINEERING BUILDING OUTLET POINT

50mm

PAUL DOLAN AIT WASTEWATER TREATMENT FACILITY

PROJECT:

SEWER PIPELINE LONGITUDINAL SECTIONS

TITLE: DRAWN:

CHECKED:

LM DATE:

SITE LOCATION PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

MH114

Pipe97

100.000

96.178

Level

Existing Levels Chainage

MH113

Pipe96

210.000

MH112

Pipe95

100 99 98 97 96 95 94 93 92 91 90

PUMPING STATION SEE DRAWING No. 13_AD_011 FOR DETAILS

160.000

MH111

270.000

PFBR UNIT SEE DRAWING No. 13_AD_008 FOR DETAILS

12/04/2013

APPROVED:

FK SCALE:

SEE DRAWING

DRAWING NO:

13_AD_010

REV:


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

A1 TYPICAL SEWER BEDDING DETAILS SCALE - 1:20 Wearing Course

150mm Topsoil

Sewer Network Plan SCALE - 1:1250

Selected material

80mm stone well compacted

Pipe of specified size

7mm Chip for Bedding & Cover

150mm Topsoil

80mm stone well compacted

Pipe of specified size

Pipe of specified size

7mm Chip for Bedding & Cover

Green Field Section

In the Road

7mm Chip for Bedding & Cover

In Road margin but < 1m from Road

DISCHARGE PUMPING STATION

1220x685mm MULTIPLE DUCTILE IRON COVER BEDDED ON MORTAR

COVER SLAB BEDDED ON PC CHAMBER SECTION WITH MORTAR, PROPRIETARY BITUMEN OR RESIN MASTIC SEALANT

Pump Control Notes: The pump station shall be supplied with a pump control panel which shall provide local pump control and shall interface with the Remote Telemetry Unit (RTU) being supplied by the Instrumentation and Control System Integrator.In normal operation level in the wet well shall be detected by a level sensing device supplied by the Instrumentation and Control System Integrator.

MH

Precast Concrete Pump Station Pump Start Level

Min Water Level

Grunfos Submersible Pump

LIFTING EYES IN CONCRETE RINGS TO BE POINTED BENCHING SLOPE TO BE 1 IN 10 TO 1 IN 30

HIGH STRENGTH CONCRETE TOPPING TO BE BROUGHT UPTO A DENSE SMOOTH FACE NEATLY SHAPED AND FINISHED TO ALL BRANCH CONNECTIONS (MINIMUM THICKNESS 20mm)

BOTTOM PRECAST CONCRETE RING TO BE BUILT INTO BASE CONCRETE MIN 75mm DISTANCE BETWEEN TOP OF PIPE AND UNDERSIDE OF PC CHAMBER TO BE 50mm

ST4 CONCRETE BASE

Interior components: 1.Stainless steel hardware including, but not limited to, the following: a) Lifting chains b) Anchor bolts c) Bolts and nuts d) Guide rails e) Rail guides f) Cable holder g) Discharge piping. 2. Level control is to be provided by ultrasonic level controller or submersible transducer. 3. Provide high water and low water alarm activated by ultrasonic or submersible level control system and backup float switches. 4. Locate level switch where flow from the inlet pipe will not interfere with the float. 5. Provide a hanger for the float switch cable and power cables. 6. Line wetwells, walls, and bottom surface of the top cover with a high density polyethylene (HDPE) concrete protective liner (CPL) or Raven epoxy coating. 7. Provision should be made for ventilation of the wetwell.

100mm Outlet Pipe

1200x675mm OPENING IN COVER SLAB

CONCRETE SURROUND 150mm ST4

225mm TO BARREL OF PIPE

TYPICAL MANHOLE DETAIL SCALE 1:20

STANDARD TUMBLING BAY JUNCTION

PRECAST CONCRETE MANHOLE SECTION

CARE TO BE TAKEN TO MAINTAIN FLEXIBILITY OF JOINTS

INVERT OF RODDING EYE TO BE NOT GREATER THAN 1.5m ABOVE TOP OF BENCHING

PIPE SET VERTICALLY

ST4 CONCRETE SURROUND TO BACKDROP TO BE CAST INTEGRAL WITH MH SURROUND

CONSTRUCTION JOINT

SHORT RADIUS 90 DEGREE BEND

TYPICAL BACKDROP DETAIL SCALE 1:20

REV NO:

ON ORIGINAL

15 0

5

10

DATE:

REVISION NOTE:

DWN BY:

CKD BY:

G1 SchemeDesign Consulting Engineers Ltd. Expertise, Technology, Results

25 20

30

40

50mm

CLIENT: PROJECT: TITLE: DRAWN:

FK

SITE LOCATION

Datum: Grid System:

Malin Head ITM

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

DISCHARGE PUMPING STATION SCALE - 1:50

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

CLASS B ENGINEERING BRICKS CONCRETE BLOCKS OR PRECAST CONCRETE COVER FRAME SEATING RINGS. MIN 2 BRICKS, MAX 4 BRICKS

MORTAR HAUNCHING TO MH COVER AND FRAME

Paul Dolan Athlone IT, Wastewater Treatment Facility Sewer Network Structures CHECKED:

APPROVED:

JC

LM

DATE:

03 / 04 / 2013

SCALE:

See Drawing

DRAWING NO:

13_AD_011

REV:

0000