Portfolio_WORK-SAMPLES

Page 1

flavio augusto

SOUSA MONTEIRO

for ARCHITECTURE

PROFESSIONAL PORTFOLIO / WORK SAMPLES


P O RT FO L IO CO N T E N TS

A

B

Cover * References *

C

CV *

ws 1

Foster + Partners - London .1 Santa Clara Masterplan, California - USA .2 Health Education Campus (HEC), Cleveland - USA

ws 2

BDP Building Design Partnership - London .1 Refurbishment and Development of NEP buildings for the House of Commons. London, UK .2 National Children’s Hospital. Dublin, Ireland .3 Royal Sussex County Hospital Teaching, Trauma and Tertiary Care Centre, Brighton

ws 3

Saraiva & Associates - Lisbon & São Paulo Housing and Urban Planning projects for the slum areas in São Paulo

ws 4

Kengo Kuma Associates - Tokyo .1 LIZE-SOHO Design Competition. Office towers. Beijing, China .2 Multifunctional building. EPFL - University of Lausanne, Switzerland

ws 5

OPERA Design matters - Barcelona Office Design Competition for an Hotel-Lodge Resort. Wako Kungo, Angola

ws 6

José Lacerda Saldanha Arquitectos - Porto Restoration project. Porto, Portugal

E**

Master degree thesis

F**

Selected Works: Master Degree & Bachelor in Architecture

“Architetture per un centro storico multifunzionale” Faculty of Architecture University of Porto 1. 2. 3. 4. 5. 6.

Urban Design V (ETSAB) Design IV (ETSAB) Design III (IUAV) Design V - technology (IUAV) Design Workshop - Arch. Guillermo Vazquez Consuegra (IUAV) Design Workshop - Arch. Eduardo Souto De Moura (IUAV)


title/program:

Riverside, 22 Hester Rd, Battersea London SW11 4AN UK

Santa Clara Masterplan: A new mixed-use development. In scope: Entertainment District & TSE job title

Architect

Stage I & II - Handover and Close out Client: RELATED Real Estate

ws 1.1


Town Square East Pavilions

Masterplan Central Strip

Town Square East

WG

SCALE 1’’= 40’ 20’

Town Square East Pavilions

2' - 0" 2' - 1"

9' - 0"

2' - 0"

23’

SIGNAGE

Signage

Signage

Signage

Signage

Signage

Signage

SIGNAGE

7' - 6"

7' - 6"

SIGNAGE

8' - 0"

Town Square East Public Realm

Town Square East Pavilions

3' - 10"

3' - 10"

7' - 9"

7' - 9"

7' - 6"

7' - 6"

7' - 6"

7' - 6"

7' - 0"

11' - 11"

7' - 3"

11' - 11"

Retail Architecture 1 2 3 4 5 6 7 8 9 10

Town Square East Pavilions

23’ 2' - 0"

Town Square East

180’

60’

9' - 0"

0

2' - 0" 2' - 1"

WF

SIGNAGE

Signage

Signage

Signage

Signage

Signage

Signage

SIGNAGE

7' - 6"

7' - 6"

SIGNAGE

SIGNAGE

8' - 0"

WE

3' - 10"

3' - 10"

7' - 9"

7' - 9"

7' - 6"

7' - 6"

7' - 6"

7' - 6"

7' - 0"

11' - 11"

3' - 8"

3' - 8"

11' - 11"

Retail Architecture 1 2 3 4 5 6 7 8 9 10


GA PLAN - L01 - LEVEL 01 - SECTOR B C:\REVIT_2019_LOCAL_FILES\RSC-W2-WG01-FPS-AR-3D_SH_flaviosmonteiro.rvt

300’ 1/16" = 1'-0"

6" 52' - 6" 52' 0" 30' - 0" 30' 30' - 00"" 30' 30' - 00"" 30' 6" 62' - 6" 62'

Total GFA Retail / F+B 128,100 sf

149,700 sf (incl. Global Retail Mez. Lvl 02) 0" 30' - 0" 30'

20' - 0" 20'

20' - 0" WG05 22.50

Global Retail South Mez. optional 10,800 sf

0" 30' - 0" 30' WC01 22.60

20' - 0" WG05 22.70

19' - 8"

25' - 0"

D

AR6.202

WC01 22.85

WG03 22.90

20' - 0"

WC01 23.15

WG03 23.10

20' - 0"

Hub Retail South 24,000 sf

WC01 22.30

WG05 22.30

WG03 23.30

WC01 23.40

20' - 0" WG03 23.50

20' - 0"

WC01 23.70

WG03 23.70

20' - 0"

20' - 0" WG03 24.10

WC01 24.25

20' - 0" WG03 24.30

20' - 0"

WC01 24.50

WG03 24.50

WG03 24.50

N

20' - 0" 0"

WC01 24.80

20' - 0"

WC01 24.95

WG03 24.90

WG01 24.90 WG03 24.90

120’

45’

Town Square East Loft Office AR6.201

30' - 0" SIGNAGE

WG05 AP.15

30' - 0"

WG05 AP.14

WG05 AP.13

WG05 AP.12

WG07 AN.15

WG07 AN.45

WG07 AN.75

WG07 AP.05

A AR6.201

*Retail / F&B Splits indicative only 13’ 0”

Bondary Line Grading Under Review

WG07 21.55

WG06 21.55

WC Provision Under Review

Landscape Indicative

GENERAL NOTES

* * * *

SHEET NOTES

WG06 21.55

GENERAL NOTES

WC Provision Under Review

Landscape Indicative

Grading Under Review

WG05 21.70

WG05 21.50

20' - 0" WG05 21.70

BUILDING KEY PLAN

WG05 21.50

WG07 21.55

BUILDING KEY PLAN

SIGNAGE

SIGNAGE SIGNAGE

SIGNAGE

SIGNAGE SIGNAGE SIGNAGE SIGNAGE SIGNAGE

Town Square East Hub Offices Plaza Corner Retail 1/16" = 1'-0"

WG03 AS.31

WG03 AS.43

WG03 AS.44

WG03 AS.45

WG01 AN.10

WG01 AN.30

WG01 AN.50

WG01 AN.70

WG01 WG01 AN.90 AN.90

WG01 WG01 AP.10 AP.10

WG01 WG01 AP.30 AP.30

WG01 WG01 AP.05 AP.05

WG01 WG01 AP.70 AP.70

WG06 AR.10

WG06 AR.40

WG06 AR.70

WG06 AR.95

* * *

SIGNAGE

2 Level 01 Plan

WG03 24.70

N

WG03 24.70

B

1 / AR2.01A

WG01 WG01 AP.90 AP.90

WG01 WG01 AR.10 AR.10

WG01 WG01 AR.30 AR.30

WG01 AR.50

WG01 AR.70

WG01 AR.90

WG01 AS.10

WG02 AS.30

WG02 22.72

WG02 22.73

WG02 22.74

WG04 22.78

62' - 6"

WC01 23.95

205' - 4"

WG03 23.90

WG02

WG01 24.40

WG01 24.90

WG01 24.90

30' - 0"

125' - 4"

WG05 22.10

WG03 24.30

BB AR6.301

WG03

WG02 24.90

WJ00

WN00

WP00

WK00

TD01

TD02

TD04

TD03

LF01

LF02

LF03

09/19/19

Author

2835

1/16" = 1'-0"

WG07 21.85

Revision

CR01

CR02

TD02

WF00

TD01

TD03

WC00

WG00

WL00

TD04

WD00

WH00

WM00

WS00

PK01

LF01

LF02

LF03

N

WG05 22.10

10/25/2019

Date

09/19/19

Author

2835

1/16" = 1'-0"

WG05 22.10

125' - 4"

WC01 22.05

20' - 0"

© 2019 All rights reserved.

AR2.01B

GA PLAN - L01 LEVEL 01 - SECTOR B

WG05 21.90

WG07 22.15

AR6.206

M

L

AR6.206

WG07

20' - 0"

WG04 RSC-W2-WG00-FPS-AR-DW

Location and Tracking Code

Drawn By

Project No.

Scale

Issue Date:

NOT FOR CONSTRUCTION

WG05 WA00 WB00 21.90

WE00

WP00

WK00

WJ00

WN00

WR00

SD Update for Coordination

Seal / Signature

WG07

© 2019 All rights reserved.

AR2.01A WG06

GA PLAN - L01 LEVEL 01 - SECTOR A

CR03

N

10/25/2019

Date

RSC-W2-WG00-FPS-AR-DW

Location and Tracking Code

Drawn By

Project No.

Scale

Issue Date:

Site Block and Location Key Plan

CR04

WD00

WC00

WS00

WH00

WM00

WL00

WG00

WR00

PK01

WG06 22.15

WG06 22.15

22.15 NOT FOR CONSTRUCTION

WG07 21.85

Seal / Signature

No. Description

1

CR03

CR04

SD Update for Coordination

Civil Engineer CR02 WE00 WF00 WSP 2025 Gateway Place Suite 240 San Jose, CA 95110 WA00 WB00 TEL: 408.453.6100 CR01

1

No. ofDescription Architect Record Gensler Site Block and Location Key Plan 45 Fremont St, Suite 1500 San Francisco, CA 94105 TEL: 415.433.3700

Design Architect Foster + Partners 1000 Sansome Street, Suit 240 San Francisco, CA 94111 TEL: 408.610.5800

WG06 21.85

Revision

Related Santa Clara 5201 Great American Parkway Suite 532 Santa Clara, CA 95054 TEL: 408.490.3700

20' - 0"

WC01 21.73

DD AR6.302

RELATED Santa Clara

WG06 21.85

Civil Engineer WSP 2025 Gateway Place Suite 240 San Jose, CA 95110 TEL: 408.453.6100

Architect of Record Gensler 45 Fremont St, Suite 1500 San Francisco, CA 94105 TEL: 415.433.3700

Design Architect Foster + Partners 1000 Sansome Street, Suit 240 San Francisco, CA 94111 TEL: 408.610.5800

WC01 22.30

WG05 22.30

WG05 22.30

20' - 0"

30’ typ

WC01 22.05

20' - 0"

WG03 24.10

20' - 0"

CC AR6.302

WG02 24.70

30’

WG05 WG03 AP.15 AS.31

WG01 24.10

20' - 0" 0"

WG01

WG02 24.50

WG05 22.50

WG05 22.50

WG07 22.45

WG07 22.45

WG06 22.45

WG06 22.45

WC01 22.60

20' - 0"

J AR6.205

WG05 22.70

WG05 22.70

30’ typ

WC01 21.73

WG05 21.90

WG03 AS.43

WG03 23.90

WG01 24.40

WG01 24.40

20' - 0"

45’

WG05 AP.14

WG03 23.70

AA AR6.301

WG02 24.30

25’

WG05 AP.13

WG01 23.60

F AR6.203

135’

WG03 AS.44

WG03 23.50

AA AR6.301

20' - 0"

60’ typ

WG05 AP.12

WG01 AN.10

WG02 24.10

45' - 0"

20' - 0"

WG05 22.70

WG03 23.30

50’

WG05 22.50

Hub Retail North 24,000 sf WG03 23.10

WG01 24.10

WG01 24.10

20' - 0"

35’

H

AR6.204

WG02 23.90

200’ 30' - 0"

WG05 21.70

Pavilion South 9,000 sf WG05 22.30

WG03 22.90

20' - 0"

50’

WG03 AS.45

WG02 23.70

Loft Retail 40,500 sf 225' 5' - 00""

90’

20' - 0"

WG05 22.10

G

WG01 23.60

WG01 23.60

20' - 0"

300’

AR6.204

WG02 23.50

20' - 0"

WG04

WG07 22.45

WG01 AN.30

WG01 AN.50

WG01 AN.70

WG01 AN.90

WG01 AP.10

WG01 AP.30

WG01 AP.05

WG01 AP.70

WG01 AP.90

WG01 AR.10

WG01 AR.30

20' - 0"

BB AR6.301

WG02 23.30

20' - 0"

WG05 21.90

WG07 22.15

20' - 0"

20' - 0"

WG07 AN.15

WG07 AN.45

WG07 AN.75

WG07 AP.05

WG02 23.10

20' - 0"

2 Level 01 Plan

WG05 21.70

WG07 21.85

WG07 22.45

K AR6.205

J AR6.205

20' - 0"

20' - 0"

WG05 21.50

WG07 21.55

WG07 22.15

WG06

90’ WG07 21.85

WG06 AR.10

E

AR6.203

WG02 22.90

E

AR6.203

K AR6.205

WG06 AR.10

G

19' - 8"

25' - 0"

D

AR6.202

WG05 WG03 AP.15 AS.31

WG05 AP.14

WG03 AS.43

WG05 AP.13

WG03 AS.44

WG05 AP.12

WG03 AS.45

AR6.204

90’

WG05 AP.15

WG05 21.50

7’5’’ WG07 21.55

L

M

AR6.202

25' - 0"

221' - 4 1/2"

WG05 AP.14

52' - 6" 20' - 0"

30' - 0"

WG05 AP.13

30' - 0" AR6.206

WG06 22.45

WG06 22.45

WG04 22.70

25’

AR6.206

20' - 0"

45’ 20' - 0"

30' - 0"

WG05 AP.12

30' - 0" 10' - 0"" 10' - 0"

WG07 AN.15

30' - 0"

N

Town Square East Plaza View towards North Pavilion North 9,000 sf

N

30’ typ 20' - 0"

52' - 6"

WG07 AN.45

62' - 6"

52' - 6"

WG07 AN.75

30' - 0" 20' - 0"

WG07 AP.05

90’ 20' - 0"

WG06 22.15

WG04 22.50

40’ typ 20' - 0"

WG06 21.85

WG06 22.15

20' - 0"

30’ typ 20' - 0"

AR6.201

30' - 0"

30' - 0"

B

1 / AR2.01A

DD AR6.302

120’ 20' - 0"

WG06 21.55

WG06 21.85

WG04 22.30

25’

WG07

20' - 0" 20'

120’ 20' - 0"

WG06 AR.10

Global Retail North Mez. optional 10,800 sf WG06 21.55

WG04 22.10

30’ 25' - 0"

WG06 AR.40

30' - 0" 45' - 0"

WG06 AR.70

20' - 0"

DD AR6.302

WG04 21.90

WG05

20' - 0"

30' - 0"

WG06 AR.95

30’ typ

WG04 22.78

WG04 21.70

Town Square East Level 01 Plan - Retail / F+B

BB AR6.301

CC AR6.302

20' - 0"

45’

WG04 22.77

WG04 22.76

WG04 22.75

WG04 21.50

45' - 0"

30' - 0"

GA PLAN - L01 - LEVEL 01 - SECTOR A C:\REVIT_2019_LOCAL_FILES\RSC-W2-WG01-FPS-AR-3D_SH_flaviosmonteiro.rvt

40’ typ 30' - 0"

7’5’’

AR2.01A 28/10/2019 21:28:47

62' - 6"

7’5’’

WC01 22.85

Pavilion South 9,000 sf

Town Square East Hub Offices Typ. Retail AR2.01B 28/10/2019 21:29:11

30’ typ

GA PLAN - L01 - LEVEL 01 - SECTOR A C:\REVIT_2019_LOCAL_FILES\RSC-W2-WG01-FPS-AR-3D_SH_flaviosmonteiro.rvt

30’ typ

AR2.01A 28/10/2019 21:28:47

90’

GA PLAN - L01 - LEVEL 01 - SECTOR B C:\REVIT_2019_LOCAL_FILES\RSC-W2-WG01-FPS-AR-3D_SH_flaviosmonteiro.rvt

30' - 0"

90’ Pavilion North 9,000 sf WG03 22.90

WG03 22.90

20' - 0"

H

AR6.204

WG07 AN.15

WG07 AN.45

WG07 AN.75

WG07 AP.05

WC01 23.15

WG03 23.10

WG03 23.10

20' - 0" WG03 23.30

WG03 23.30

WG01 AN.10

WG01 AN.30

WG01 AN.50

WG01 AN.70

WG01 AN.90

WG01 AP.10

WG01 AP.30

WG01 AP.05

WG01 AP.70

WG01 AP.90

WG01 AR.10

WC01 23.40

20' - 0"

BB AR6.301

WG01 AR.30

WG03 23.50

WG03 23.50

20' - 0"

WG01 23.60

WG01 23.60

WG01 23.60

WC01 23.70

WG03 23.70

WG03 23.70

20' - 0"

WG03 24.10

WC01 24.25

20' - 0" WG03 24.30

20' - 0"

WG02

WG01 24.40 WG03 24.30

WG01 24.40

WG01 24.10

AA AR6.301

WG01 24.40

WG03 24.10

F AR6.203

WG01 24.10

WG01 24.10

20' - 0"

WC01 23.95

205' - 4"

WG03 23.90

WG03 23.90

Town Square East Loft Office Typ. Retail

AR2.01B 28/10/2019 21:29:11

Town Square East Pavilions Retail Split Diagram

SIGNAGE

30' - 0" SIGNAGE SIGNAGE SIGNAGE

Retail Architecture 1 2 3 4 5 6 7 8 9 10

125' - 4"

45' - 00""

90’

0" 30' - 0" 30'

Retail Architecture 1 2 3 4 5 6 7 8 9 10

*Canopy to Main Road elevations only (First St., Stars & Stripes)

Retail Architecture 1 2 3 4 5 6 7 8 9 10

Town Square East Global Retail

30’ Height

16’

16’

16’

16’

18’

60’ Typ

West Elevation

Retail Architecture 1 2 3 4 5 6 7 8 9 10

WC01 24.50

WG03 24.50

WG03 24.50

20' - 0

WG


Make lights longer (double length as marked up below)

Originial Render

Take away grills

Render metal cables it hangs from.

Extend duct further Take away grills

Ensure lights are BELOW the sprinkler pipes

19013_101_Office_Lougne_Final_Draft_Option_2

Please ensure renders use same colouration and brightness as original render (floor colouration seems richer, ceiling is brighter and we prefer colour in this...etc). We also prefer the lighting (looks like it is higher contrast) in the original (looks much duller in latest renders)

Please ensure renders use same colouration and brightness as original render (floor colouration seems richer, ceiling is brighter and we prefer colour in original... etc). We also prefer the lighting (looks like it is higher contrast) in the original (looks much duller in latest renders - looks like a very grey day!)

Make it read like one timber panel with a small shadowgap around it.

ALL COMMENTS FROM PAGE 2 APPLY

Slatted ceiling looks a bit flat - give some depth/contrast

Move shelf across to this bay Swivel open More people sitting at their desks, more activity

Texture looks a bit too rought/concrete like

Swivel open

More shelves like this to cover bare white desk ends

Bring desks/activity/furnishings forward so it is not so empty in the foreground, and add more desks/activity/furnishings behind

19013_101_Office_Lougne_Final_Draft_Option_1

19013_101_Office_Lougne_Final_Draft_Option_3

Please ensure renders use same colouration and brightness as original render (floor colouration seems richer, ceiling is brighter and we prefer colour in original... etc). We also prefer the lighting (looks like it is higher contrast) in the original (looks much duller in latest renders - looks like a very grey day!)

Please ensure renders use same colouration and brightness as original render (floor colouration seems richer, ceiling is brighter and we prefer colour in original... etc). We also prefer the lighting (looks like it is higher contrast) in the original (looks much duller in latest renders - looks like a very grey day!)

ALL COMMENTS FROM PAGE 2 APPLY


Loft Office Facade Base Scheme: 300’

16’ 16’ 16’ 16’ 18’

60’ Typ 300’

West Elevation

Loft Office Facade 280’ Overall - 60’ & 40’ Bays

16’ 16’ 16’ 16’ 18’

40’

60’

60’

280’

West Elevation

Loft Office Facade 280’ Overall - 40’ Typical Bay

16’ 16’ 16’ 16’ 18’

40’ Typ

Loft Office Depth Base Scheme: 135’

280’

West Elevation

Loft Office Facade Base Scheme: 135’

65’

50’

35’

50’

Loft Office Depth Increase Depth: 145’

135’

South Elevation

Loft Office Facade Increased Width: 145’

55’

55’

35’ 145’

55’


Thornton Tomasetti Gensler

Issue Date:

WG03 AS.31

WG03 AS.43

SA

SC

WG03 AS.44

WG01 AN.10

WG01 AN.30

WG01 AN.50

WG03 AS.45

SD

16

15

WG01 AN.90

WG01 AP.10

WG01 AN.70

14

13

12

WG03 24.70 WG03 24.50

20' - 0" WG03 24.30

20' - 0"

WG03 24.10

20' - 0"

B

WG01 24.10

WG03 24.10

WG03 24.30

WG02

C

WG01 24.40

WG03 24.50

20' - 0"

WG01

WG03 24.70

C.1

20' - 0"

D

WG01 24.90 WG03 24.90

WG03 24.90

WG01 AP.05

WG01 AP.30

11

10

WG01 AP.90

WG01 AR.10

WG01 AP.70

9

8

7

6

5

4

3

WG01 AR.50

2

WG01 AR.70

1

WG01 AR.90

WG03 23.90

20' - 0" WG03 23.70

WG03 23.90 WG03 23.70

20' - 0" WG03 23.50

20' - 0"

S10

WG03 23.10 WG03 22.90

25' - 0"

S7 20' - 0"

WG05 22.50

S6 S5 20' - 0"

WG05 22.10

S4 20' - 0"

WG05 21.90

S3 20' - 0"

WG05 21.70

S2

WG05 21.70

20' - 0" WG05 21.50

S1

WG05 21.50

WG03 SAWG05 AP.15 AS.31

WG03 AS.43 WG05 AP.13

WG03 AS.44

30' - 0"

WG05 AP.14

SC1 WG05 AP.12

SD

WG03 AS.45

WG01 AN.10 WG07 AN.15

16

WG05 22.70

WG05 WG03 AP.15 AS.31

WG05 AP.14

WG03 AS.43

WG05 AP.13

WG03 AS.44

WG04

WG05 22.10 WG05 21.90

WG07 21.85

PB WG07 21.55

PA P16

P15

P14 AN.45

WG01 AN.30

15

13

14 WG07 WG01 AN.50

WG01 AN.70

WG01 AN.90

WG07 AN.75

12

P13

P12

P11

P10

P9 AP.05

11 WG07 WG01 AP.10

WG01 AP.30

10

WG01 AP.05

9

20' - 0"

WG05 22.50 WG05 22.30

PG PF WG07 22.15

PD

PE

WG06

WG07 22.15 WG07 21.85 WG07 21.55

WG06 21.55

P7

P6

P5

WG05 22.30

WG05 22.70

PI PH WG07 22.45

WG07 22.45

WG06 22.45 WG06 22.15 WG06 21.85

WG05 AP.12

WG03 AS.45

S8

WG03 22.90

WG07 AN.15

WG06 AR.10

WG06 AR.40

WG07 AN.45

WG07 AP.05

WG07 AN.75

20' - 0"

S9

WG03 23.10

20' - 0"

WG03 23.30

WG03 23.30

A.1

WG03 23.50

A

WG01 23.60

WG01 AN.10

WG01 AN.30

WG01 AN.50

WG01 AN.70

WG01 AN.90

WG01 AP.10

WG01 AP.30

WG01 AP.05

WG01 AP.70

WG01 AP.90

WG01 AR.10

WG01 AR.30 BB AR6.301

WG01 AR.50

WG01 AR.70 WG06 AR.70

WG06 AR.95

WG07

WG01 AP.70

30' - 0"

30' - 0"

45' - 0"

WG03 24.90

20' - 0"

D

20' - 0"

WG03 24.70

C.1

53' - 6"

WG03 24.50

20' - 0" WG03 24.30

20' - 0" 20' - 0" WG03 23.90

20' - 0" WG03 23.70

WG03 23.90 WG03 23.70

20' - 0" WG03 23.50

20' - 0" 20' - 0"

WG03 23.30

A.1

WG03 23.50

A

WG01 23.60

WG02: advise on services WG02: waiting for structure

S10

WG03: advise on services

WG03 24.10

WG03 24.10

B

WG01 24.10

WG02 24.10

Revision

WG02: waiting for core model and internal layout

S9

WG03: waiting for Structure

20' - 0"

Misaligned, overlapping cores, please only build necessary parts, whilst referencing others. (Please see image below).

WG02 23.10

S18

WG01 Level 02

53' - 6"

45' - 0"

WG03 23.30

S17

20' - 0"

WF01 Level 02

25' - 0"

WG01 AN.10

S16

69' - 6"

67' - 6"

58' - 6"

20' - 0"

WG01 AN.30

S15

WG07 Level 03

53' - 6"

20' - 0"

WG01 AN.50

S14

WG01 AN.70

S13

WG01 AN.90

S12

WG01 Level 03

WF01 Level 03

69' - 6"

WG09 Level 02

20' - 0"

WG03 23.10

WG09 Level 03

S11

20' - 0"

85' - 6"

WG02 23.30

101' - 6"

WG01 Level 04

20' - 0"

WG01 Level 05

85' - 6"

WG01 AP.10

WG02 23.50

113' - 6"

101' - 6"

WG09 Level 04

20' - 0"

WG01: advise on services

WG02 23.90

WG02 23.90

26

WG01 AP.30

100' - 0"

N13

Misaligned, overlapping cores, please only build necessary parts, whilst referencing others. (Please see image below).

WG01 AP.05

D

WG01 24.90

WG01 AP.70

C.1 50' - 0"

WG01 AP.90

C

WG01 24.40

35' - 0"

117' - 6"

WG01 AR.10

25

100' - 0"

B

WG01 24.10

50' - 0" WG01WG01 Roof Level 01 06

WG09 Level 05

20' - 0"

WG02 24.30

WG02 24.30

A.1

30' - 0"

WG01 AR.30

A

WG01 23.60

20' - 0"

TSE Level 02 30' - 0"

20' - 0" 24

100' - 0"

PI

20' - 0"

WG02 23.70

PH

10' - 0"

WG01 23.60

WG06 WG07 22.45

10' - 0"

WG02 23.50

PG

20' - 0"

distance between wall and column to be equal

WG01 AS.10

PF

20' - 0"

62' - 6"

WG02 23.30

WG06 WG07 22.15

20' - 0"

30' - 0"

WG02 23.10

23

100' - 0"

PE 30' - 0"

20' - 0"

20' - 0"

PD

WG02 23.70

WG06 WG07 21.85

N12

PC 30' - 0"

WG01 AR.90

WG02 23.50

WG01 AS.10

PC

align central line walls to grids

20' - 0"

PB

20' - 0"

30' - 0"

© 2019 All rights reserved.

N11

WG06 WG07 21.55

WG01 AS.10

NA

WG01 AR.30

AR6.301

N10

22

100' - 0"

PA WF01 Roof Level 01

20' - 0"

30' - 0"

2835

N9

21

WG04: waiting for Structure

Author

20' - 0"

WG07 Structure in Revit?

20' - 0"

WG04: advise on services

WG03 23.10

A

WG01 Can the lift overruns be minimised? - to keep the roof’s pure form

1/16" = 1'-0"

25' - 0"

52' - 6"

WG01 24.10

AA Section AA - WG02, WG01 and WG03 WG07 MEP in Revit?

Plant?

WG03 24.70

WG02 24.70

B

52' - 6"

GA SECTION SECTION 01 - 02

20' - 0"

35' - 6"

advise on WC provision Roof access?

WG03 24.50

WG02 24.90

20' - 0"

WG02 Level 01

30' - 0"

WG01 AR.50

35' - 6"

45' - 0"

N17

53' - 6"

WG01 How does the plant sit in section? How high is it? ideally as minimal as possible to stay true to the blade like roof we have shown in the visuals. WG03

WG01 Can the stairs be open to keep the roof’s pure form WG01

WG01 Level 01

WG02

30' - 0"

RSC-W2-WG00-FPS-AR-DW

WG02 24.50

53' - 6"

N 35' - 6"

WG02: advise on services WG02: waiting for structure

Location and Tracking Code

WG02 24.10

53' - 6"

WG09 Level 01 WG03 WG01

30' - 0"

1/16" = 1'-0"

Drawn By

A

30' - 0"

06/07/19

Project No.

B 69' - 6"

WG02 Level 02

WG02: waiting for core model and internal layout

C

85' - 6"

WG02 Level 03

69' - 6"

WG01 Level 02

45' - 0"

Civil Engineer WSP 2025 Gateway Place Suite 240 San Jose, CA 95110 TEL: 408.453.6100

Scale

WG02 Level 04

85' - 6"

WG01 Level 03

69' - 6"

WG09 Level 02 WG03

62' - 6"

N18

WG01 Level 04

85' - 6"

WG09 Level 03 WG03

P1

NOT FOR CONSTRUCTION

AS.31

45' - 0"

45' - 0"

WG03 24.30

101' - 6"

SA WG03

AS.43

30' - 0"

30' - 0"

WG01 24.90 WG03 24.90

WG02WG02 Roof Level 01 05

101' - 6"

SB WG03

AS.44

45' - 0"

Consentini to advise on energy code

45' - 0"

WG01 24.40

WG01 Level 05

101' - 6"

SC WG03

AS.45

25' - 0"

2 / AR2.01B

WG03WG03 WG09 Roof Level 01 05

WG09 Level 04 WG03

SD WG03

8

16

WG01 AN.10

20' - 0"

1 / AR2.01A

15

WG01 AN.30

20' - 0"

WG01 AP.90

14

WG01 AN.50

20' - 0"

General notes: - please use project grids

7

13

WG01 AN.70

20' - 0"

30' - 0"

WG01 AR.30

12

WG01 AN.90

20' - 0"

30' - 0"

5

11

WG01 AP.10

20' - 0"

WG06: Structure?

N

WG02 24.90

10

WG01 AP.30

20' - 0"

WG01 24.90

WG02 24.90 WG02 24.70 WG02 24.50

WG01 24.40 WG02 23.70 LF02

30' - 0"

WG02 24.70

9

WG01 AP.05

20' - 0"

20' - 0"

WG02 24.50

8

WG01 AP.70

20' - 0"

20' - 0"

WG01 24.40

7

WG01 AP.90

20' - 0"

TD04

NA.1WG04 22.78

6

WG01 AR.10

20' - 0"

TD03

WG04 22.77

5

WG01 AR.30

20' - 0"

TD02

NB

4

WG01 AR.50

20' - 0"

Please use project grid files for master and building grids, as already set up.

TD01

of Record Gensler 45 Fremont St, Suite 1500 San Francisco, CA 94105 TEL: 415.433.3700

NC

3

WG01 AR.70

20' - 0"

WG02 AS.30

NB

WG02 23.30

LF03

WG02 22.72

2

WG01 AR.90

20' - 0"

117' - 6"

WD00

WG02 22.73

1

WG01 AS.10

AS.30

WG01WG01 Roof Level 06 01

WC00

WG04 22.76

NA WG02 45' - 0"

20' - 0"

WG01 23.60 WS00

WB00

Seal / Signature Architect

20' - 0"

NA.1

100' - 0"

20' - 0"

align central line wall to grid

WG02 22.90 WR00

WA00

N16

22.72

30' - 0"

100' - 0"

CR01

N15

NB WG02

22.73

45' - 0"

100' - 0"

AM

N14

NC WG02

100' - 0"

Town Square East East West Section - Pavilion and Loft

AN

AP

ND

AR

WG02 WG04 22.74 22.75

AS

100' - 0"

36’

TSE - RMU’S Base Scheme

25' - 0"

S7 20' - 0"

WG05 22.50

S6 20' - 0"

WG05 22.30

S5 20' - 0"

WG05 22.10

S4 20' - 0"

S3 20' - 0"

S2 20' - 0"

30' - 0"

WG05 AP.15

WG05 AP.14

WG05 21.50

S1 30' - 0"

WG05 AP.13

WG05 AP.12

1 / AR2.02A

TSE - RMU’S Base Scheme

WG05 22.70

WG05 WG03 AP.15 AS.31

WG05 AP.14

WG05 21.50

SC1 30' - 0"

205' - 0"

WG04 22.78

WG04 22.77

30' - 0"

1 / AR2.02B

30' - 0"

WG04 22.76

WG04 22.75

WG03 AS.43

PB PA P16

P15

P14

P13

P12

P11

P10

P9

P8

P7

P1

General notes: - please use project grids

205' - 0"

110’

WG03 AS.44

WG05 21.70

PC

WG05 21.90

WG04: waiting for Structure

WG05 21.90

WG05 22.50 WG05 22.30 WG05 22.10

WG04: advise on services

WG05 21.70

WG05 22.70

PI

advise on WC provision Roof access?

PF

WG04 22.30 WG04 21.70

© 2019 All rights reserved.

30' - 0"

TSE - RMU’S Base Scheme

WG05 AP.13

WG05 AP.12

WG03 AS.45

WG02 AS.30

WG04 22.78

WG02 22.72

WG02 22.73

AR6.301

P6

GA SECTION SECTION 01 - 02

WG05: waiting for Structure

P5

RSC-W2-WG00-FPS-AR-DW

P4

A

2835 Author

WG04 21.50

B

WG04 22.10

N4

WG04 22.10

20' - 0"

N3

WG04 21.90

20' - 0"

Consentini

WG05: advise on services

06/07/19 1/16" = 1'-0"

Project No.

Location and Tracking Code

WG04 21.70

Gensler

N

Scale

Drawn By

A

N

CONSTRUCTION

Issue Date:

20' - 0"

B

WG04 22.77

LF02 LF01

PH

TD04

PG

WD00

TD03

PE

WH00

WC00

advise on WC provision Roof access? NOT FOR

PD

WM00

WG00

TD02

WG04 22.70

WL00

WF00

WB00

TD01

P3

20' - 0"

N5

WK00

WE00

WA00

20' - 0"

WG04 22.30

WJ00

LF03

WG04 21.90

WG04 22.50

N6

CR01

WG04 22.76

WS00

P2

CR02

Seal / Signature

Thornton Tomasetti

TSE - RMU’S Base Scheme

WG03 22.90

S8

WG03 22.90

WG02 22.90

10/25/2019

Date

PK01 WR00

WG04 22.50

N7

CR03

20' - 0"

WG01 L1 Can edge beam be raised into the floor above to create an upstand/ window ledge behind the fluted glass? Allowing for higher retail frontage glass, and better vent exits. (Please see adjacent sketch).

GA SECTION - SECTION 01 - 02 C:\REVIT_2019_LOCAL_FILES\RSC-W2-WG01-FPS-AR-3D_SH_tphillips.rvt

WP00

CR04

1/16" = 1'-0"

WG01 Consentini to advise on retail ventilation

WN00

WG04 WG02 22.75 22.74

25' - 0"

WG01 WG04 22.70

WG06

SD Update for Coordination

No. Description

Site Block and Location Key Plan

35' - 6"

BB Section BB - WG06 and WG01

AR6.301 30/10/2019 11:17:03

1

WG01 Level 01

N2

35' - 6"

WF01 Level 01 37' - 6"

N1

35' - 6" 35' - 6"

WG02 22.90

45' - 6" WG07 Level 01

N8

WG07 Level 02

WG09 Level WG0101Level 01

WG04 21.50

GA SECTION - SECTION 01 - 02 C:\REVIT_2019_LOCAL_FILES\RSC-W2-WG01-FPS-AR-3D_SH_tphillips.rvt

WP00

Design Architect WJ00 WK00 WL00 WM00 LF01 Foster + Partners 1000 Sansome Street, Suit 240 San Francisco, CAWG00 94111WH00 CR02 WE00 WF00 TEL: 408.610.5800

CR03

AT

AR6.301 30/10/2019 11:17:03

PK01 WN00

CR04

1/16" = 1'-0"

WG02 ND 22.74

NA.1

Site Block and Location Key Plan

BB Section BB - WG06 and WG01

20' - 0"

move here and align wall to mullion/grid

General notes: - Please align internal walls to central line column / gridlines or at facade interface with shopfront mullions centre - Delete any walls modelled in the facades and indicate where any GF entrance door is needed.

WG06 AR.40

WG01

10/25/2019

Date

4

35' - 6"

WG06

SD Update for Coordination

No. Description

Plant?

WG07: Structure?

WG01 AR.50

20' - 0"

37' - 6"

35' - 6"

1

WG04 21.50

35' - 6" 35' - 6"

WG01 Level 01

N1

WF01 Level 01

WG05: waiting for Structure

P4

53' - 6"

45' - 6" WG07 Level 01

20' - 0"

WG06: advise on services

3

WG01 Level 02

53' - 6" WG07 Level 02

WG05: advise on services

Related Santa Clara 5201 Great American Parkway Suite 532 Santa Clara, CA 95054 TEL: 408.490.3700

20' - 0"

WF01 Level 02

53' - 6"

WG09 Level WG0101Level 01

20' - 0"

WG07: advise on services

WG06 WG01 AR.70 AR.70

Consentini

Revision

RELATED Santa Clara

WG04 21.70

WG09 Level 02

WG04 WG02 22.75 22.74

25' - 0"

Gensler

S18

WG07 Level 03 58' - 6"

N8

WG02 22.90

S17

69' - 6"

67' - 6"

N7

20' - 0"

WG04 22.70

S16

WG01 Level 03

WF01 Level 03

69' - 6"

S11

advise on WC provision Roof access?

WG01 AR.70

85' - 6"

Thornton Tomasetti

P3

101' - 6"

WG01 Level 04

85' - 6"

26

100' - 0"

D

WG01 24.90

50' - 0"

P2

WG01 Consentini to advise on retail ventilation S12 S13 S14 S15

WG01 Level 05

101' - 6"

WG09 Level 04

C.1

WG01 24.40

35' - 0"

WG06 AR.95

113' - 6"

WG09 Level 05

25

100' - 0"

WG01 24.10

50' - 0"

117' - 6"

2

WG01 23.60

WG01WG01 Roof Level 01 06

WG09 Level 03

24

100' - 0"

PI

WG01 AR.90

PH

WG01 AR.90

WG06 WG07 22.45

10' - 0"

WG02 23.10

WG02 23.10

PG

30' - 0"

N6

PF

WG04 22.50

WG06 WG07 22.15

20' - 0"

PE

30' - 0"

N5

23

100' - 0"

PD

WG04 22.30

WG06 WG07 21.85

20' - 0"

PC

30' - 0"

N4

PB

WG04 22.10

WG06 WG07 21.55

N3

22

100' - 0"

PA

WF01 Roof Level 01

WG02 Core in Revit?

WG04 DD 20' - 0" 21.90 AR6.302

WG01 Misaligned, overlapping cores, please only build necessary parts, whilst referencing others. (Please see image below).

21

WG03: waiting for Structure

20' - 0"

WG02 Structure in Revit? WG01 L1 Edge beam condition - to be raised into the floor above to create an upstand/ window ledge behind the fluted glass. Allowing for higher retail frontage glass, A better A.1 B C and vent exits. (Please see sketch).

N2

WG03 Structure in Revit?

WG02 AS.30

WG03 WG02 MEP in Revit?

1/16" = 1'-0"

WG01 Misaligned, overlapping cores, please only build necessary parts, whilst referencing others. (Please see image below).

NC

20' - 0" WG02 23.50 WG02 23.30

35' - 6"

WG01

WG03 MEP in Revit? AA Section AA - WG02, WG01 and WG03

align central line wall to grid

WG03: advise on services

N10

35' - 6"

WG02

N11

20' - 0"

53' - 6"

20' - 0"

35' - 6"

WG02 Level 02

WG02 Level 01

N9

53' - 6"

WG01 Level 01

WG06 22.45

WG01 Level 02

53' - 6"

WG09 Level 01 WG03 WG01

WG06 22.15

WG09 Level 02 WG03

WG06 21.85

69' - 6"

WG06 21.55

WG02 Level 03

69' - 6"

1

WG01 Level 03

69' - 6"

NA

WG09 Level 03 WG03

10' - 0"

align these walls between each other

align to grid

WG01 AS.10

85' - 6"

20' - 0"

P8

20' - 0" WG02 Level 04

85' - 6"

WG02 23.90

WG01 Level 04

85' - 6"

20' - 0"

WG01: advise on services

20' - 0"

WG09 Level 04 WG03

WG02 22.72

are these stairs? please indicate if door entrance is needed(read general notes)

Civil Engineer WSP 2025 Gateway Place Suite 240 San Jose, CA 95110 TEL: 408.453.6100

6

AS.31

45' - 0"

WG06 AR.10 WG01 AR.10

SA WG03

AS.43

30' - 0"

WG03

N15

WG02 24.30

SB WG03

AS.44

45' - 0"

AA WG02 AR6.301 24.30

SC WG03

AS.45

WG02 24.10

SD WG03

WG02 23.70

101' - 6"

20' - 0"

WG01 24.10

16

WG01 AN.10

20' - 0"

WG02WG02 Roof Level 01 05

20' - 0"

WG02 23.90

15

WG01 AN.30

20' - 0"

WG02 AS.30

14

WG01 AN.50

20' - 0"

20' - 0"

WG01 24.90

13

WG01 AN.70

20' - 0"

WG04 22.78

12

WG01 AN.90

20' - 0"

20' - 0"

WG04 22.70

11

WG01 AP.10

20' - 0"

WG04 22.50

10

WG01 AP.30

20' - 0"

20' - 0"

align with grid align

WG04 22.30

9

WG01 AP.05

20' - 0"

25' - 0"

WG04 22.10

8

WG01 AP.70

20' - 0"

WG04 21.90

7

WG01 AP.90

20' - 0"

WG04 21.70

6

WG01 AR.10

20' - 0"

WG04 21.50

5

WG01 AR.30

20' - 0"

WG02 22.72

4

WG01 AR.50

20' - 0"

101' - 6"

WG02 22.73

3

WG01 AR.70

20' - 0"

117' - 6"

WG01 Level 05

101' - 6"

WG04 22.77

2

WG01 AR.90

20' - 0"

Architect of Record Gensler 45 Fremont St, Suite 1500 San Francisco, CA 94105 TEL: 415.433.3700

CC AR6.302

1

WG01 AS.10

AS.30

WG01WG01 Roof Level 06 01

WG03WG03 WG09 Roof Level 01 05

WG02 22.73

ND

WG02 22.74

WG02 24.90

N18

20' - 0" WG02 24.70

N17

20' - 0"

Design Architect Foster + Partners 1000 Sansome Street, Suit 240 San Francisco, CA 94111 TEL: 408.610.5800

WG04 22.76

NA WG02 45' - 0"

100' - 0"

WG05

NA.1

22.72

30' - 0"

AM

100' - 0"

N13

NB WG02

22.73

100' - 0"

N12

NC WG02

AN

AP

100' - 0"

20' - 0"

100' - 0"

45' - 0"

WG02 Can the lift overruns be minimised? to keep the roof’s pure form

WG02 24.10

AR

N14

AS

45' - 0"

move here and align wall to mullion/grid

20' - 0"

WG03 Can the lift overruns be minimised? to keep the roof’s pure form WG02 ND 22.74

WG02 Can the stairs be open to keep the roof’s pure form?

WG01 Can the lift overruns be minimised? - to keep the roof’s pure form

30' - 0"

*

WG02 24.50

WG03 Can the stairs be open to keep the roof’s pure form?

45' - 0"

Related Santa Clara 5201 Great American Parkway Suite 532 Santa Clara, CA 95054 TEL: 408.490.3700

WG02 How does the plant sit in section? How high is it? - ideally as minimal as possible to stay true to the blade like roof we have shown in the visuals.

WG01 How does the plant sit in section? How high is it? - ideally as minimal as possible to stay true to the blade like roof we have shown in the visuals. WG01 Can the stairs be open to keep the roof’s pure form?

N16

WG03 How does the plant sit in section? How high is it? - ideally as minimal as possible to stay true to the blade like roof we have shown in the visuals.

AT

TSE Level 01

Consentini please use project’s grid* RELATED Santa Clara

SB

Consentini to advise on energy code

SB

Please use project grid files for master and building grids, as already set up.

SC

Town Square East North South Section - Hub and Loft


title/program:

Riverside, 22 Hester Rd, Battersea London SW11 4AN UK job title

Architect (BIM)

A new Health Education Campus in Cleveland, Ohio. HEC’s main piece is Sheila and Eric Samson Pavilion. Stage VI - Handover and Close out Client: CWRU and Cleveland Clinic

ws 1 .2


South Winter Garden

Courtyard

North Winter Garden

Note: 3-D visuals shown in this document do not fully reflect or show all the wall and ceiling devices/ life safety equipment/ light fixture etc. Refer to Architectural Construction Drawings for detailed elevations.

HEC section (Revit Model + Enscape)


Walkthorugh views (Revit Model + VRAY)

Case Method Room

Library

Walkthorugh views (Revit Model + Enscape)

Lecture Hall TBL Room


Shared

Shared

Medical

Medical

Nursing Pre Clinical Sim. Lab

Nursing

Offices

Dental

Dental

Virtual Sim. Lab

Food Service North Winter Garden

Library

Case Method Classroom

East Entrance Teaching Labs

Critical Care Transport Sim. Center

Technology Based Learning Classrooms

Medium Group Rooms

West Entrance Courtyard Main Atrium

South Winter Garden

Case Method Classroom

Lecture Hall

Technology Based Learning Classrooms

Examination Rooms


Shared Medical Nursing

All 4 corners of every level: Department Reception Learning Communities

Dental

Staff Lounge

Faculty Staff Lounge Offices

Offices

Deans and associated offices

Conference Room

Offices

Learning Communities Staff Lounge

Future Expansion - Empty

Office First Work Inspection will be ready shortly


CWRU Health Education Campus Typical 10’ x 10’ Office - Teknion Proposal

Sit/ stand desk (87” x 30”)

CWRU Health Education Campus Typical 10’ x 10’ Office - Teknion Proposal

Fixed desk (108” x 30”) Lateral filing cabinet

Lateral filing cabinet

Lateral filing cabinet

Lateral filing cabinet

Mobile pedestal

Fixed desk (108” x 30”)

CWRU Health Education Campus Typical 10’ x 10’ Office - Teknion Proposal

CWRU Health Education Campus Typical 10’ x 10’ Office - Teknion Proposal

Sit/ stand desk (87” x 30”)

Fixed unit (20” x 30”)


title/program:

16 Brewhouse Yard EC1V 4LJ London UK job title

Architect

Northern Estate Programme: The refurbishment and development of the NEP buildings. In scope: Norman Shaw South Stage II - Design Proposal; Client: House Of Commons

NTIAL CONFIDE ws 2.1


650 Members, their staff and house staff will be accommodated within the secure boundary, extended to include Richmond House. The key objectives are:

• Heritage and conservation

• Resilience for estate functions and infrastructure • Security

The two parallel programmes will result in an intensification of the Northern Estate due to increased occupancy, infrastructure upgrades, new plant and security.

The space to accommodate the required functions within the secure boundary is likely to be greater than the existing useable space on the Northern Estate. The NEP works aim to be complete by 2023.

It is assumed that all NEP buildings are decanted, constructed and completed simultaneously.

Norman Shaw North Norman Shaw South

1 Derby Gate 1 Parlament Street

Norman Shaw South Building (Revit Model)


RESTRICTED ACCESS: MANAGEMENT, COMMERCIAL, SECURITY

THE PROPOSALS

The proposals

Courtyard wing building wing building ACourtyard four storey central wing building will split the courtyard A four storey central wing building will split the courtyard into two smaller spaces, with a covered double height space on the eastern NSS side, and a into two smaller spaces, with a covered double height raised garden above the lower ground level on the 1 Canon Row western side.

internal refurbishment

new build elements

3

space

1

on eastern NSSa vehicular side, and a raised garden above Thethe Courtyard is currently service yard accessed from an arched the lowentrance off Commissioner’s Yard. This arched entrance will serve as the main, er ground level on the into 1 Canon western side.to pedestrian accessible, entrance the NSS Row block and will link through entrances to NSN and RH at this junction.

The Courtyard is currently a vehicular service yard accessed

4

2

5

St. Stephen’s Yard Link Building A link building within St. Stephen’s Yard will the NSS building with from an arched entrance offconnect Commissioner’s Yard. This Portcullis House. This link building will also lead down to Canon Row, which is currently envisaged to bewill the site’s main as pedestrian thoroughfare. The Canon accesarched entrance serve the main, pedestrian Row block refurbishment, currently on site, has a new entrance to the block at St. Stephen’s Yard. Access to this entrance will need to be incorporated into the sible, entrance into the NSS block and will link through to link building.

1

Proposed 4 central wing running north to south

2

Proposed double height space with glazed roof alongside Norman Shaw North to eastern side

3

Existing Norman Shaw South building refurbished

4

Proposed raised garden alongside 1 Canon Row to western side

5

Proposed slab over existing service yard to form new accomodation at lower ground level

1

Proposed 4 central wing running north to south

2

Proposed double height space with glazed roof alongside Norman Shaw North to eastern side

3

Existing Norman Shaw South building refurbished

4

Proposed raised garden alongside 1 Canon Row to western side

5

Proposed slab over existing service yard to form new accomodation at lower ground level

entrances to NSN and RH at thisdetail junction. A key part of Stage 2B will be to review in more the developing proposals impacts on 1 Canon Row and Portcullis House buildings, to be coordinated in Interface meetings.

St. Stephen’s Yard Link Building

existing courtyard & service area

1 Canon Row

Section perspective through building looking north

existing Furniture Store

Norman Shaw South

A link building within St. Stephen’s Yard will connect the NSS building with Portcullis House. This link building will

3

also lead down to Canon Row, which is currently envisaged to be the site’s main pedestrian thoroughfare. The Canon

1

2

Row block refurbishment, currently on site, has a new en-

1

Proposed 1 storey link building between Portcullis House and Norman Shaw South

2

Proposed 4 central wing running north to south

3

Existing Norman Shaw South building refurbished

1

Proposed 1 Storey link building between Portcullis House and Norman Shaw South

2

Proposed 4 central wing running north to south

3

Existing Norman Shaw South Building refurbished

trance to the block at St. Stephen’s Yard. Access to this entrance will need to be incorporated into the link building.

maintain existing service route to Portcullis House existing gym (basement level)

Section perspective through building looking east Commissioner’s Yard

Norman Shaw South

3

new link building

Portcullis House

Norman Shaw South and link building

Palace of Westminter (out of scope)


(Structure grid study for Link building)

View of stepped facade and terraces looking north

View of garden terrace and bar looking west *

Masterplan Section: Norman Shaw buildings


title/program:

16 Brewhouse Yard EC1V 4LJ London UK job title

Architect

National Children’s Hospital Dublin. It features 384 in-patient beds including 62 critical care beds, all in single en-suite rooms. Stage IV - Clinical Planning; Client: Children’s Hospital Group

ws 2.2


BUILDING DESIGN PARTNERSHIP SHALL HAVE NO RESPONSIB MADE OF THIS DOCUMENT OTHER THAN FOR THAT WHICH IT ISSUED. Mock soffit to be built on site to simulate actual soffit height

Mock soffit to be built on site to simulate actual soffit height

Red line shows extent of mock-up to be built

ALL DIMENSIONS SHOULD BE CHECKED ON SITE. DO NOT SCALE FROM THIS DRAWING

Mock soffit to be built on site to simulate actual soffit height

U/S Slab 3450mm AFFL

ANY DRAWING ERRORS OR DIVERGENCIES SHOULD BE BRO OF BUILDING DESIGN PARTNERSHIP AT THE ADDRESS SHOW

NOTES

U/S Slab 3450mm AFFL Red line shows extent of mock-up to be built

3 7000-0011

Red line shows extent of mock-up to be built

Ceiling Types

CLG-101 - Painted Plasterboard suspen framing/ supports – HTM 60 category 1. 1 layer of 12.5mm, seamless jointing. Me recommended by lining board manufactu slab RC slab soffit. Primer/ Sealer: Prime 9016 Traffic White (colour TBC) except f along corridor (RAL 1023 Traffic Yellow

CLG-101

100 CLG-112a CL

C CL

855

MDF Panel - Idea Paint - Create clear dry erase paint RAL 6018 Yellow Green TBC

70

Plywood pattress to inside face of partition for fixing of Indicative free form solid MDF frame lacqured

50

TV Panel Front Elevation

1

445

330

35 0

300 2125

2260

Infill units: Perforated zinc coated steel p folded profile and closed recessed joints as required to satisfy the acoustic perfor nominal 10mm plain border to tiles. Pane coated finish with fine textured matt appe Concealed grid - Form: Suited to insertio accordance with the manufacturer's reco

TV Panel Detail

CLG-112c - 1200x600 - Perforated Meta Grid - RAL 9016 Traffic White (TBC) - Ac Class C. Infill units: Perforated zinc coated steel p folded profile and closed recessed joints as required to satisfy the acoustic perfor nominal 10mm plain border to tiles. Pane coated finish with fine textured matt appe Concealed grid - Form: Suited to insertio accordance with the manufacturer's reco

TV recessed enough to not protrude into the room with all cables concealed and electrical outlet behind TV location. Client to confirm spec for TV and brackets. Spec of recess with equipment co-ordination TBC

900

550

MDF Panel - Idea Paint Create clear dry erase paint RAL 6018 Yellow Green TBC

500

30

CLG-121 - Proprietary Internal POD Fini

U- TVM906 Indicative free form solid MDF 100mm frame lacqured RAL1023 Traffic Yellow TBC

20

Sheet coved skirting to match flooring

TV Panel Front Elevation Setting Out

2

1 : 20

50

Cut out to panel behind TV for mounting plate for TV 600

0 30

U- TVM906 Indicative free form solid MDF 50mm frame lacqured RAL1023 Traffic Yellow TBC

Plywood patress to inside face of partition for fixing of Indicative free form solid MDF frame lacqured 50mm TV recess for cable management

70

200

780

MDF Panel - Magnetic Primer Idea Paint. RAL 6018 Yellow Green TBC

All cables concealed and electrical outlet behind TV location.

270

CL Cut out to panel behind TV for mounting plate for TV

645

590

TVM906 TV Screen To be supplied by client

CLG-112a - 785x300 - Perforated Metal Grid - RAL 1023 Traffic Yellow (TBC) - A Class A.

Internal fixing frame to perimeter of TV recess and proper anchoring required to top and bottom

100

30 0

Internal fixing frame to perimeter of TV recess and proper anchoring required to top and bottom

Refer to ARUP drawings for setting out of outlets

100 90 100 100 100 100 50 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

100 100 100 100 100 100 100 100 100 100 100 100 50 100 100 100 100 100 100 100 80

3

1 : 20

TV Panel Section

Refer to the mock up room clinic NPH-A-BDP-EL-7000-0001 and NPH-A-BDP-SP-7000-0001 for

Refer to ARUP drawings, setting specification

Joinery element to be developed the specialist joinery sub-contra

Refer to the mock up plans & ele NPH-A-BDP-A-XX-XX-7000-000

1 : 20

C02 TV panel updated following ID development C01 Additional details added following comments from GMP 1361 REVISION / DESCRIPTION

Overall ventilation unit size - 1800mm x 900mm. ARUP to clarify with NCH Infection control regarding the detail and specification of the ventilation grille. Further co-ordination, connection of services from void and detail information on the ventilation unit is required from ARUP's, refer to ARUP's specification

Line of cill and parent sofa bed when pulled flat in the bed position

Seat cushion COU901 Sofa Bed - Parent sofa bed on frame shared with ventilation unit (on anti vibration pads) CMHR Foam with a density between 40-50 with Boltaflex coated fabric.

COU901 Sofa Bed - Parent sofa bed on frame shared with ventilation unit (on anti vibration pads) CMHR Foam with a density between 40-50 with Boltaflex coated fabric. Boltaflex coated fabrics to match RAL colours; Back rest: RAL 6018 Yellow Green (TBC) Mattress: RAL 1023 Traffic Yellow (TBC)

1940

Boltaflex coated fabrics to match RAL colours; Back rest: RAL 6018 Yellow Green (TBC) Mattress: RAL 1023 Traffic Yellow (TBC)

235

Internal line of facade, facade details and co-ordination to be developed with BDP, ARUP and BAM

270

180

150mm MDF niche, gloss polyester lacquer to curved inner face of recess and back panel - (RAL 1023 Traffic Yellow, colour ref TBC)

80mm tolerance/fitting gap for the unitised system

380

100

Anodised metallic silver grey ventilation grille. Further co-ordination and detail information on the ventilation unit is required from ARUP.

95

Sofa Bed Front Elevation

405

Pull tag for removing cushion

Lacqured outer frame

30

550 1050

Sofa Bed Section

5

1 : 20

KEYPLAN

100

100mm Marmoleum coved skirting to match flooring

2000 2040

4

DIMENSIONS IN MILLIMETRES LEVELS IN METRES

Round magnetic fixing N52 grade TBC by manufacturer. Applied around base board frame to affix sofa bed to

380

650

Moisture resistant base board for seat

Line of cill and parent sofa bed when pulled flat in the bed position

Red line shows extent of mock-up to be built

Access and maintenance panel with concealed hinges and locks as required

1 : 20

Indicative wardrobe and parent sofa bed components

CLIENT

Ventillation Grille Overall ventilation unit size - 1800mm x 900mm. ARUP to clarify with NCH Infection control regarding the detail and specification of the ventilation grille

100mm Marmoleum coved skirting to match flooring Steel support frame for base unit & AHU

6

Blackhall Green Blackhall Place Dublin 7 Ireland T +353 (1) 474 0600 E dublin@bdp.com www.bdp.com

Sofa Bed Sketch Detail Not to scale

PROJECT TITLE

Parent sofa bed Nominal seating Height 450mm Nominal seating Depht 500mm Overall unit nominally 1000mm deep and 2000mm in length. Cushions fold down to form day bed / visitor bed.

National Paediatric Hospital Deve 2006304 DRAWING TITLE

MOCK UP ROOM - SINGLE BED TV PANEL AND SOFA BED DET DRAWING STATUS

A-Issued for Construction

DRAWING No.

NPH-A-BDP-DR-XX-XX-7000-00 NO

BUILDI MADE ISSUE

U/S of slabCorridor ceiling

Steel goal posts per S.E. details. Refer to OCSC drg: NPH-C-OCSC-DR-ZZ-002028-2217

L05-IPA-GW1-S014-18-D01

ENSUITE

'Pencil' coved skirting

L05-IPA-GW1-S044-17-D01

Manual Operated Glazed Sliding Door

4

Ensuite_Door Elevation

5

1 : 25

ASSESSMENT ROOM

Brushed SS door handle

No threshold to sliding door BEDROOM

L05-IPA-GW1-S044-17-D01

1 : 25

CORRIDOR

Anodised aluminium door frame (Colour TBC)

600

S/O 2400

80 2125

700

Corridor Wall

Brushed SS Kick plate

Bedroom_Door Section

2

1 : 25

Manifestation zone (design TBC by artist)

Metal/Timber Frame to match slidding door

L05-IPA-GW1-S014-18-D01

Bedroom_Door Elevation

ANY D OF BU

Overhead track with sloping canopy to manufacturer's specification. Colour to match wall (TBC).

Ensuite_Door Section

7

1 : 25

700

'Pencil' coved skirting

Brushed SS Door Handle

Anodised aluminium door frame (Colour TBC)

DO NO

Section through ceiling

Sloping top to overhead canopy. Colour to match wall

Overhead track/canopy extension by manufacturer. Colour to match wall (TBC). Pattressing required for fixing.

Laminate Door RAL 9016

1000

700

No threshold to sliding door

Section through ceiling

Ventilation grille. Refer to mechanical engineer specification. Grille RAL9016

BEDROOM

200

1500 1305

Anodised aluminium door frame (Colour TBC)

Manual Operated Glazing Sliding Door

1

CORRIDOR

Brushed SS door handle

700

S/O 2400

Tilt only interstitial blinds (White)

700

Corridor ceiling

100

S/O 2400

100

2190mm min - maximise clear opening height

100

Overhead track/canopy by manufacturer. Colour to match wall (TBC).

Head restrain per S.E. details. Refer to OCSC drg: NPH-COCSC-DR-ZZ-00-2028-2217

1290

1630

ALL DI

Corridor ceiling

Head restraint per S.E. details. Refer to OCSC drg: NPH-COCSC-DR-ZZ-00-2028-2217

300

Overhead track/canopy extension by manufacturer. Colour to match wall (TBC). Pattressing required for fixing.

450

3350 Extent of overhead track TBC by manufacturer S/O 2700

Steel goal posts per S.E. details. Refer to OCSC drg: NPH-COCSC-DR-ZZ-00-2028-2217

S/O 2400

Head restraint per S.E. details. Refer to OCSC drg: NPH-C-OCSC-DR-ZZ00-2028-2217

2700

Steel goal posts per S.E. details. Refer to OCSC drg: NPH-C-OCSC-DR-ZZ00-2028-2217

L00-EMG-MRR-S069-02-D01

Glazed sliding door

L00-EMG-MRR-S069-02-D01

ED Room_Door Elevation

8

1 : 25

ED Room_Door Section 1 : 25

ED ASSESSMENT ROOM

BEDROOM SIDE 255 nib min Partition Wall IWS-01

ENSUITE

Fixed glazing panel

S/O 2700

Steel goal posts per S.E. details. Refer to OCSC drg: NPH-C-OCSCDR-ZZ-00-2028-2217

2 X 70X70X8SHS steel goal posts per S.E. details

Steel goal posts per S.E. details. Refer to OCSC drg: NPH-C-OCSC-DR-ZZ-00-2028-2217

S/O 1800 300mm min.

250

Brusehd SS door cranked handle

80

Metal/Timber Frame (TBC) RAL 9003 Overhead track/canopy

Glazed sliding door with manifestation (details TBC)

CORRIDOR

Metal Grab Rail (TBC) RAL 9003

BEDROOM

364

Pencil coved skirting

Glazed sliding door with interstitial blinds (White)

Handle extent in door closed position Anodised aluminium door frame (Colour TBC)

700

CORRIDOR SIDE

700

335

1550mm required clear opening width

C06

3

Bedroom_Door Plan

6

1 : 25

Ensuite_Door Plan

9

1 : 25

ED Room_Door Plan

10

1 : 25

ED Room_Internal Door Elevation 1 : 25

C05 C04 C03 C02 C01

Steel goal posts per S.E. details. Refer to OCSC drg: NPH-C-OCSC-DR-ZZ00-2028-2217

Interstitial Blinds Operation: mechanism (magnetic) to operate the blinds should be located on the room side for the sliding panel and on the corridor side for the fixed panel

REVISION / D

60

ENSUITE SIDE

3 part knockdown metal frame

Anodised alluminium frame (colour TBC) Brisehd stainless steel door handle

CORRIDOR SIDE

14

100mm max.

Pod Wall BEDROOM SIDE

Head restrain per S.E. details to sit in wall cavity. Refer to OCSC drg: NPH-C-OCSC-DR-ZZ-00-2028-2217

Finished face of prebaricated pod

Pod Wall

100mm max.

80

BEDROOM SIDE

CORRIDOR SIDE

BEDROOM SIDE

Wall Type ISW-01

Sloped canopy to overhead track

Pencil round architrave Timber packing if required

75mm max.

Track

ENSUITE SIDE Pelmet

Timber frame to suit Pod Wall thickness

Metal frame to suit Pod Wall thickness

No threshold

Door stop

clear glass with integral blind

Panel fixed to slab per manufacturer recomendations Vinyl floor finish

CORRIDOR SIDE

Wall to be made structurally solid to support sliding door track BEDROOM SIDE

CLIENT

Head restrain per S.E. details to fit in wall cavity. Refer to OCSC drg: NPHC-OCSC-DR-ZZ-00-20282217 Mastic sealant

Ventilation grille

Ventilation grille

sliding glazing panel

100mm max.

CORRIDOR SIDE

1:5

Finished face of prebaricated pod

BEDROOM SIDE

ENSUITE SIDE

fixed glazing panel

Anodised alluminium door frame (colour TBC)

Single Sliding Door Jamb Detail_ED Room

max. 75mm

Head restraint per S.E. details. Refer to OCSC drg: NPH-C-OCSCDR-ZZ-00-2028-2217

Pod Wall

Steel head restraint per S.E. details. Refer to OCSC drg: NPHC-OCSC-DR-ZZ-00-2028-2217

clear glass with integral blind

clear glass with integral blind

16 Subject to VE approval

1:5

Timber packing if required

Mastic sealant

Pelmet

CORRIDOR SIDE

Timber Frame Door Jamb Detail_Ensuite

Ceiling

Glazed sliding door with interstitial blinds (White)

Door frame to suit Pod wall thickness

60

Wall Type ISW-01 to u/s of slab CEILING 75mm max.

Door stop

CORRIDOR SIDE

1:5

Track

Gypframe 70 S 50 'C' stud at 600mm centres

Timber packing if required

Sliding Door Jamb Detail_Bedroom

PVC strip or similar to seal gap to manufacturers' recommendations

KEYPLAN

60

Pencil round architrave

14a

Brusehd Stainless steel door handle

D L

Steel goal posts per S.E. details. Refer to OCSC drg: NPH-C-OCSC-DR-ZZ-002028-2217

60

ENSUITE SIDE

100mm max.

11

Stainless steel frame

1:5

100mm max.

Glazed sliding door with interstitial blinds (White)

45 15

Steel goal posts per S.E. details. Refer to OCSC drg: NPH-C-OCSC-DR-ZZ00-2028-2217

Metal Frame Door Jamb Detail_Ensuite

80

Partition Wall IWS-01

DE ASSESSMENT ROOM SIDE

Timber packing if required

100mm max.

Steel goal posts per S.E. details. Refer to OCSC drg: NPH-C-OCSCDR-ZZ-00-2028-2217

CORRIDOR SIDE

Metal door frame to suit Pod wall thickness

Pod Wall

Mastic sealant

BEDROOM SIDE

18

Single Sliding Door Patressing Detail_ED Room 1:5

Clear glass with integral blind

Anodised alluminium door frame (Colour TBC)

No threshold

Concrete slab Concrete slab

12

Sliding Door Head Detail_Bedroom

13

1:5

LOCATION

LEVEL

DOOR NUMBER

DOOR TYPE

Structural Opening Width

Structural Opening Height

Frame Width

Frame Height

GEOMETRY AND DIMENSIONS Required Required Clear Clear Opening Opening Leaf Height Width Height

Leaf 1 Width

15

1:5

Side Glazing

Leaf 2 Width

Side Panel

Overhead Panel

Double Swing

Bi-Swing

Vision Panel Type Leaf 1

Wall Thickness

Metal Frame Door Head Detail_Ensuite

Vision Panel Powered Type Leaf Door Hold Opening 2 Closer Open (Push Button)

ADD-ONS Power Assisted Opening

AGV Automatic Opening

Timber Frame Door Head Detail_Ensuite

L05-IPA-GW1-S014-18-D01 L05-IPA-GW1-S014-18-D02

S-1A S-2Y

2700 440

2400 2110

2700 440

1350 340

1350 340

0 0

2186 2060

1550 0

2150 0

0

No

No

No No

No

132 92

0 0

0 0

No No

No No

No No

No No

No No

L05-IPA-GW1-S044-17-D01

D-2D

1720

2260

1720

2125

1620

1055

565

2075

1370

0

0

No

Yes

No

No

130

0

0

No

No

No

No

No

No

S-5B

1800

2400

1800

2400

1800

1800

0

2186

1550

2150

132

0

0

No

No

No

No

No

No

Door Protection

No No

Glazing Privacy

Required Fire Rating

Required Acoustic Rating

Subject to VE approval

SECURITY Anti-ligature Design

Security

CONSTRUCTION AND FINISHES Frame Type

Frame Finish

Leaf Finish

Secondary Steel

SPECIALS

Specials

Turn Key Area

Specification Reference

IB

0 0

No No

MTL TMB

PNT PNT

GLZ PNT

Yes Yes Yes

0

0

No

NONE

No

TMB

PNT

LAM

Yes Yes

L20/IDR-110

0

30

No

NONE

No

MTL

PNT

GLZ

Yes Yes

L11/IDR-127

No No

NONE

Interlocked

M

AFT

30 0

Radiation Protection

17

1:5

PERFORMANCE ADD-ONS

Hermetically Sealed

L05

No

15a

1:5

L05 L05

L00 (Ground) L00-EMG-MRR-S069-02-D01

2400 2110

Total Leaf Width

Sliding Door Threshold Detail_Bedroom

L11/IDR-123A L20/IDR-102

Single Sliding Door Head Detail_ED Room 1:5

19

Single Sliding Door Threshold Detail_ED Room 1:5

Blac Blac Dubl Irela T +3 E du www

PROJECT T


BUILDING DESIGN PARTNERSHIP SHALL HAVE NO RESPONSIBILITY FOR ANY USE MADE OF THIS DOCUMENT OTHER THAN FOR THAT WHICH IT WAS PREPARED AND ISSUED. ALL DIMENSIONS SHOULD BE CHECKED ON SITE. DO NOT SCALE FROM THIS DRAWING ANY DRAWING ERRORS OR DIVERGENCIES SHOULD BE BROUGHT TO THE ATTENTION OF BUILDING DESIGN PARTNERSHIP AT THE ADDRESS SHOWN BELOW.

Indicative line of facade with 80mm tolerance gap. To be developed further with facade detail

Red line shows extent of mock-up to be built

NOTES

U/S slab 3450mm AFFL

Ceiling Types

100

100mm tolerance to the joinery above ceiling height

CLG-101 - Painted Plasterboard suspended ceiling with metal framing/ supports – HTM 60 category 1. 1 layer of 12.5mm, seamless jointing. Metal beads/stops recommended by lining board manufacturer, suspended directly from slab RC slab soffit. Primer/ Sealer: Primer to painted areas. RAL 9016 Traffic White (colour TBC) except for bed room bulkhead soffit along corridor (RAL 1023 Traffic Yellow - colour TBC)

U/S ceiling 3200mm AFFL

80

1100

600

U/S ceiling 2700mm AFFL

Red line shows extent of mock-up to be built

210

Pull Out, undermounted wardrobe clothes rail silver epoxy coated steel with single extension ball bearing runners 70

Plan - Hanger Rail

100

150

Infill panel to conceal the column

150mm MDF niche gloss polyester lacquer to curved inner face of recess - (RAL 1023 Traffic Yellow colour ref TBC)

600

400 850

400

300

100

Service void

Packing as required

CLG-121 - Proprietary Internal POD Finish

Fixed upper panel: panel continuous 100mm beyond ceiling line Plywood pattress as required

2

1 : 20

Refer to the mock up room clinical equipment list; NPH-A-BDP-EL-7000-0001 and schedule NPH-A-BDP-SP0001 for further details

Subframe for panel system and associated equipment HPL laminate faced MDF to wardrobe face with ABS edging (colour to match RAL 9016 TBC) White matt finish

5 Wardrobe Detail Plan

Refer to specification N20 issued from Tender for further de on the joinery specification. Joinery package to be develope further with sub-contractor and client

CLG-101 plasterboard suspended ceiling

50mm radius edges HPL laminate faced MDF with ABS edging to match colour with pencil rounded radius edges - finish to match RAL 9016, white matt finish Marmoleum coved skirting to match flooring

Plan - Niche

1

CLG-112c - 1200x600 - Perforated Metal Plank Tile with Concealed Grid - RAL 9016 Traffic White (TBC) - Acoustically absorbent to Class C. Infill units: Perforated zinc coated steel panels with square edge folded profile and closed recessed joints. Perforation type and pattern as required to satisfy the acoustic performance requirements with nominal 10mm plain border to tiles. Panels to have polyester powder coated finish with fine textured matt appearance (20% gloss level). Concealed grid - Form: Suited to insertion of clip-in tiles in accordance with the manufacturer's recommendations.

Interior face of wardrobe door

HPL laminate MDF to wardrobe face and side panel with ABS edging to match colour with pencil rounded radius edges, white matt finish (colour ref to match RAL 9016 TBC) 150mm MDF niche, gloss polyester lacquer to curved inner face of recess and back panel including socket cover plate flush to back panel - (RAL 1023 Traffic Yellow, colour ref TBC)

200

Partition

Column

100

50

Red line shows extent of mock-up to be built

Indicative line of facade

Finger pull profile handle gloss polyester lacquered - RAL 1023 Traffic Yellow (colour ref TBC)

125

Internal carcass, MFC melamine (RAL 1023 Traffic Yellow, colour TBC) matt finish

600

400

560

Parent reading light, refer to ARUP specification

500

80

Internal carcass, MFC melamine Traffic (colour to match RAL 1023 TBC) matt finish

Wardrobe door with hanger rail

1250

Infill panel to conceal the column

Infill units: Perforated zinc coated steel panels with square edge folded profile and closed recessed joints. Perforation type and pattern as required to satisfy the acoustic performance requirements with nominal 10mm plain border to tiles. Panels to have polyester powder coated finish with fine textured matt appearance (20% gloss level). Concealed grid - Form: Suited to insertion of clip-in tiles in accordance with the manufacturer's recommendations.

Arcylic safety mirror on the interior face of door size: 400x900mm

300

300

3 7000-0003

CLG-112a - 785x300 - Perforated Metal Plank Tile with Concealed Grid - RAL 1023 Traffic Yellow (TBC) Acoustically absorbent to Class A.

100

100

300

100

200

Column Service void

1250

Infill panel, allow for tolerance of radial external wall in rooms, tolerance may not be required, further development with joinery sub-contractor required. (colour ref to match RAL 9016 TBC) White matt finish

Partition

Indicative line of facade

400

600

900

560

4 7000-0003

100

Wardrobe Detail - Front Elevation

Refer to the mock up plans & elevation dwgs; NPH-A-BDP-A-XX-XX-7000-0001 & 0002

Refer to first stage tender Combined Specifiations Doc No. NPH-A-BDP-TD-SP-XX-XX-0001 and Reference Code Inde Doc No. NPH-A-BDP-TD-SP-XX-XX-0002

Wardrobe Head Detail Not to scale

C3 Additional details added following comments from GMP 1361 C2 Notes amended C1 Issued for Construction

Clothes rail to wardrobe

1 : 20

SS SS SS

REVISION / DESCRIPTION

100mm tolerance to the joinery above ceiling height

300

100

KL

2

KL DH

0 0

CHECKED

DIMENSIONS IN MILLIMETRES LEVELS IN METRES

Refer to specification N20 123 issued for Tender for further details on the joinery specification

100

100mm tolerance to the joinery above ceiling height

DRAWN

KEYPLAN

U/S ceiling 3200mm AFFL

U/S ceiling 3200mm AFFL Indicative line of facade

1105

1105

Access Hatch

U/S ceiling 2700mm AFFL

U/S ceiling 2700mm AFFL

560

Subframe as appropriate to support the wardrobe

600

300 Infill panel, finish to match wardrobe door (colour to match RAL 9016 TBC)

20

Shelf for clothes (colour to match RAL 1023 TBC) Pull Out, undermounted wardrobe clothes rail silver epoxy coated steel with single extension ball bearing runners

Shelf for clothes Pull Out, undermounted wardrobe clothes rail silver epoxy coated steel with single extension ball bearing runners

1050

Niche Recess Detail Not to scale

20

1800

20

2100

HPL laminate face MDF to wardrobe side panel with ABS edging to match colour with pencil rounded radius edges, white matt finish (colour to match RAL 9016 TBC)

1800

6

Internal carcass, MFC melamine (colour to match RAL 1023 TBC)

Service void

2100

CLIENT

Solid through colour laminate applied to moisture resistant MDF substrate or equivalent (colour to match RAL 9016 TBC) White matt finish

50

HPL laminate faced MDF to wardrobe face and side panel with ABS edging to match colour with pencil rounded radius edges, white matt finish (colour to match RAL 9016 TBC)

Internal carcass, MFC melamine Traffic (colour to match RAL 1023 TBC) matt finish

1070

160

560

200

20

20

560

100

20 160 20

20

80

Subframe as appropriate to support the wardrobe socket cover plate flush to back panel Gloss polyester lacquer to curved inner face of recess and back panel. (colour to match RAL 1023 TBC) Cut out for framed recess to align with inner lacquered face

Red line shows extent of mock-up to be built

Wardobe integrated around the column

150mm MDF niche, gloss polyester lacquer to curved inner face of recess and back panel including socket cover plate flush to back panel - (RAL 1023 Traffic Yellow, colour ref TBC)

20

150

MDF substrate Split batten support or equivalent to achieve concealed fixing for panel system

Blackhall Green Blackhall Place Dublin 7 Ireland T +353 (1) 474 0600 E dublin@bdp.com www.bdp.com

HPL laminate faced MDF to wardrobe face with ABS edging (colour to match RAL 9016 TBC) White matt finish

480

830

20

200

150mm MDF niche, gloss polyester lacquer to curved inner face of recess and back panel (RAL 1023 Traffic Yellow, colour ref TBC)

ABS edging to panel laminate fare face with pencil rounded radius edge Subframe as appropriate to support the wardrobe Propriety skirting as part of sheet floor system to match floor finish. Top edge to underside of MDF joinery panel

Marmoleum coved skirting to match flooring

265

Weld joint to match floor finish

35

9 Fitzwill

T +353 (1) E info@oconnel www.oconnel

PROJECT TITLE

Wardrobe Detail- Internal Elevation

3

4

1 : 20

Wardrobe Detail - Section

7

1 : 20

National Paediatric Hospital Development new children's hospital

Coved Skirting Detail Not to scale

2006304

DRAWN B

DRAWING TITLE

MOCK UP ROOM - SINGLE BEDROOM WARDROBE DETAILS

SCALE

DRAWING No.

REVISION

S

1:2 DATE

02

NPH-A-BDP-DR-XX-XX-7000-0003

W08

Refer to first stage tender Combined Specifiations Doc No. NPH-A-BDP-TD-SP-XX-XX-0001 and Reference Code Index Doc No. NPH-A-BDP-TD-SP-XX-XX-0002

BUILDING DESIGN PARTNERSHIP SHALL HAVE NO RESPONSIBILITY FOR ANY USE MADE OF THIS DOCUMENT OTHER THAN FOR THAT WHICH IT WAS PREPARED AND ISSUED. ALL DIMENSIONS SHOULD BE CHECKED ON SITE. DO NOT SCALE FROM THIS DRAWING ANY DRAWING ERRORS OR DIVERGENCIES SHOULD BE BROUGHT TO THE ATTENTION OF BUILDING DESIGN PARTNERSHIP AT THE ADDRESS SHOWN BELOW.

NOTES

CC

SWC025

CC

Finishes: Bedroom/ ED Assessment Room

DIS438

Walls: PT-106 - Polyurethene coating (RAL 9016 Traffic White TBC) PT-104A - Matt emulsion - (RAL 9016 Traffic White TBC) Floors: FF-111 - 2.5mm Sheet flooring - Noraplan Sentica 6525 (performance and accessories to match as specified for rubber) Skirting: SK-102 Coved skirting to match floor

Red line shows extent of mock-up to be built

Red line shows extent of mock-up to be built

U-HCT80008

CAL034

OUT905

Ensuite Proprietary Internal Pod finish by Specialist Floor: To match RAL 7042 (Traffic Grey)

STA900 OUT905 SWC025

U-HCT80054 U-HCT80003 U-BHB9000 BRA003 SUC001

CHA802

Doors: For Door Types please refer to schedule in drawing with reference number: NPH-A-BDP-DR-XX-XX-7000-0008

U-TVM906

TAB073

Partitions-Partition tags:

U-BED015 MAT003

IWS-000 XX

HOL016 RAI907

U-BHB9001

A

BRA003

D

SHE800 MIR800 RAI161 LIG803 BIN028 U-WCH906

B C

U-ECS010

PIR001

A D RAI161 HOO019 HOO019

For all services as per ARUPs Drawings and setting out dimensions Ceiling mounted fittings shown for coordination purposes only, for specification refer to ARUP information. Exact size of access hatches to be confirmed by Contractor

DIS013 DIS435 HOL004 RAI161 SHE802 SHE801 OUT345 U-SHO818

B C

COU901

CHA095

CAL012

Partition/ lining types tag Require fire rating in minutes

Note:

RAI048 U-BAS902

Refer to drawing 7000-0005

SCR923

Refer to the mock up room clinical equipment list; NPH-A-BDP-EL-7000-0001 and schedule NPH-A-BDP-SP-7000-0001 for further details

DD

DD

Refer to drawing 7000-0002

C08 Acoustic partition updated to step between pods. Riser door added to duct. Access panel behind and below mirror omitted. C07 Partitions and lining types updated. ES setting out updated. C06 Amendments following comments from meeting 26.01.2018 C05 Amendments following comments from GMP 1361 C04 Amendments following comments from GMP 1361 C03 Amendments following comments from GMP 1361 C02 Notes amended C01 Issued for Construction

W08

REVISION / DESCRIPTION

L05 - Single Bedroom - S014-18 - Context

1

Single Bedroom - 3D View1

2

1 : 50

3

1:1

LG

KL

16.02.2018

LG SS SS SS SS SS SS

DH KL KL KL KL KL DH

09.02.2018 02.02.2018 22.11.2017 08.11.2017 25.10.2017 04.10.2017 02.10.2017

DRAWN

CHECKED

DATE

Single Bedroom - 3D view 2 1:1

Emergencgy light Red line shows extent of mock-up to be built

Light Fitting

Red line shows extent of mock-up to be built

Light Fitting

Sprinkler For Mock Up room please replace with standard partition wall detail type IWS-128

KEYPLAN

IWS-101 LIN-109 0

60 875

330

2080

LIN-102

350

140 150 210

LIN-102

Extract

795

Smoke detector

EQ

2400mm AFFL Radiant Panel. Size/ setting out to be confirmed dependant on final product Access Hatch 400x350

Edge of bulkhead to align with edge of wardrobe

600

600

4

Light fitting

LIN-102

L05 - Single Bedroom - S014-18 Setting Out 1 : 50

Mock sheer wall to be built on site to simulate actual sheer wall required

5

EQ

Centre Line

2490

Emergency Light fitting

Radiant Panel. Size/ setting out to be confirmed dependant on final product Centre Line to metal tiles grid

3565 Variable

Sprinkler

Sprinkler

80

Dummy facade

Access Hatch

Centre Line

PIR

Access Hatch 600x350

CLG-101 3200mm AFFL

1:50 fall in floor to shower drain

CLG-121

250

0° .0 90

350

265

2050

90 .0 0°

635

Mock column to be built on site to simulate actual column positions

Smoke detector

150

Ensuite L05-IPA-GW1-S044-17

L05-IPA-GW1-S044-17-D01 BAM to advise and provide details

Centre Line

POD-101: -Pod build up TBC in accordance with manufacturer's specifications. -Pod wall type to be coordinated in accordance with specialist's manufacturer's design. - Proprietary Internal Pod finishes TBC by Specialist Pod manufacturer. Floor to match RAL 7042

CLIENT

Emergency Light fitting

90 .0 0°

IWS-104 0 210

2300

440

10 60

130

875

800

POD-101: -Pod build up TBC in accordance with manufacturer's specifications. - Pod finishes TBC by Specialist Pod manufacturer.

Sprinkler Light fitting

10

60 130

1250

CLG-101 2700mm AFFL

Extract duct from below

0° .0 90

35

IWS-104 0

Edge tile to be fixed CLG-112a 2400mm AFFL

EQ

2080

2230

LIN-102 LIN-109

IWS-103 0

IWS-104 0

150

440

5400

IWS-104 0

L05-IPA-GW1-S014-18-D02

GLC-101 RAL 1023 Traffic Yellow (TBC) on bulkhead soffit only

Setting out of tiles in bedroom to be aligned with corridor tiles

1185

WL: PT-104A FL: FF-111 SK: SK-102

0° .0 90

Bedroom - Single L05-IPA-GW1-S014-18

900

Sh

150

Edge tile to be fixed

200

60

0° .0 89

130

89 .0 0°

CLG-112c 2400mm AFFL CLG-101 2400mm AFFL

240

IWS-101 0 130

LIN-140

2490

2700

600

3830 Variable

L05-IPA-GW1-S014-18-D01

150

2150

WL: PT-104A FL: FF-111 SK: SK-102

130

DIMENSIONS IN MILLIMETRES LEVELS IN METRES

Supply and extract grille

Corridor L05-IPA-CIR-C001-01

EQ

L05 - Single Bedroom - S014-18 - Reflected Ceiling Plan 1 : 50

Blackhall Green Blackhall Place Dublin 7 Ireland T +353 (1) 474 0600 E dublin@bdp.com www.bdp.com

6

Corridor - 3D View

9 Fitzwilliam Place Dublin 2 Ireland T +353 (1) 676 7408 E info@oconnellmahon.ie www.oconnellmahon.ie

PROJECT TITLE

National Paediatric Hospital Development new children's hospital 2006304

DRAWN BY

MOCK UP ROOM - SINGLE BEDROOM AND ENSUITE

DRAWING TITLE

SCALE

DRAWING STATUS

DATE

DRAWING No.

REVISION

A-Issued for Construction NPH-A-BDP-DR-XX-XX-7000-0001

SS

As indicated 1:50 @A1 @A1 02.10.2017

C08




BUILDING DESIGN PARTNERSHIP SHALL HAVE NO RESPONSIBILITY FOR ANY USE MADE OF THIS DOCUMENT OTHER THAN FOR THAT WHICH IT WAS PREPARED AN ISSUED. ALL DIMENSIONS SHOULD BE CHECKED ON SITE. DO NOT SCALE FROM THIS DRAWING

ANY DRAWING ERRORS OR DIVERGENCIES SHOULD BE BROUGHT TO THE ATTEN OF BUILDING DESIGN PARTNERSHIP AT THE ADDRESS SHOWN BELOW.

NOTES Ceiling Types Access Panel with plasterboard bulkhead

Mock soffit to be built on site to simulate actual soffit height

Red line shows extent of mock-up to be built

U/S slab 3450mm AFFL

CLG-101

CLG-112a

CLG-101

840

37

U/S ceiling 2700mm AFFL

34 U/S ceiling 2400mm AFFL

U/S slab 3450mm AFFL CLG-101

CLG-101 - Painted Plasterboard suspended ceiling with framing/ supports – HTM 60 category 1. 1 layer of 12.5mm, seamless jointing. Metal beads/stop recommended by lining board manufacturer, suspende directly from slab RC slab soffit. Primer/ Sealer: Primer painted areas. RAL 9016 Traffic White (colour TBC) ex bed room bulkhead soffit along corridor (RAL 1023 Tra Yellow - colour TBC)

Red line shows extent of mock-up to be built

U/S ceiling 3200mm AFFL

CLG-112a - 785x300 - Perforated Metal Plank Tile with Concealed Grid - RAL 1023 Traffic Yellow (TBC) Acoustically absorbent to Class A.

100

Mock soffit to be built on site to simulate actual soffit height

U/S ceiling 2700mm AFFL

U/S ceiling 2400mm AFFL

Infill units: Perforated zinc coated steel panels with squ edge folded profile and closed recessed joints. Perforat type and pattern as required to satisfy the acoustic performance requirements with nominal 10mm plain bo tiles. Panels to have polyester powder coated finish wit textured matt appearance (20% gloss level). Concealed grid - Form: Suited to insertion of clip-in tiles accordance with the manufacturer's recommendations.

33 EQ EQ

36

32

700

41

27 28

1545

36

300

33

40

42 500

CLG-112c - 1200x600 - Perforated Metal Plank Tile wit Concealed Grid - RAL 9016 Traffic White (TBC) - Acou absorbent to Class C. Infill units: Perforated zinc coated steel panels with squ edge folded profile and closed recessed joints. Perforat type and pattern as required to satisfy the acoustic performance requirements with nominal 10mm plain bo tiles. Panels to have polyester powder coated finish wit textured matt appearance (20% gloss level). Concealed grid - Form: Suited to insertion of clip-in tiles accordance with the manufacturer's recommendations.

16 1-3 7000-0011

Single Bedroom - Elevation A

A

Single Bedroom - Elevation B

B

1 : 50

1 : 50

CLG-121 - Proprietary Internal POD Finish

Note: Services as per ARUPs Drawings, setting ou specifications

CLG-101

3

22

20

20

5 19

44

35

10

14

12

15

4-7 7000-0011

16

27

1240

16

Single Bedroom - Elevation C

D

1 : 50

1

80mm tolerance/ fitting gap for the unitised system

2

Anodised metallic silver grey curtain wall with opaque window and ventilation. Facade details and co-ordination to be developed with BDP, ARUP and BAM

3

BLI9004 - Large roller blind, non-automatic concealed with contained cord. Internal aluminum cover to conceal blind fixed to window frame, to match curtain wall anodised finish. Refer to specification N10 241B

4

BLI9005 - Small roller blind, non-automatic concealed with contained cord. Internal aluminum cover to conceal blind fixed to window frame, to match curtain wall anodised finish. Refer to specification N10 241B

5

U-JOI912 - Fixed Panel to wardrobe, panel to conceal column and finish to match wardrobe door. Refer to specification N20 123

6

U-JOI912 - 600x300mm Wardrobe, soft close hinged door with safety mirror on the interior face of door and finger pull profile handle with colour. Refer to specification N20 123

7

LIG801 - Parent reading light - Refer to ARUP lighting specification

8

Back of sofa bed to match curtain wall transom at 650mm H

9

Facade ventilation slot opening. Facade details and co-ordination to be developed with BDP, ARUP and BAM

10

COU901 - Parent sofa bed on frame shared with ventilation unit (on anti vibration pads) CMHR Foam with a density between 40-50 with Boltaflex coated fabric

11

Ventilation unit underneath sofa bed to Engineer's details

12

COU901 - Parent single bed sofa bed base & accessible panel thermally & acoustically sealed base board and unit: to incorporateaccessible panel for maintenance of AHU / Filters. (Refer to interior design intent and M&E details)

13

25mm infill panel to accommodate tolerance of interface with curtain wall

14

Ventilation grill anodised metallic silver grey, finish to match curtain wall

15

COU901 - Sofa bed metal base, 100mm marmoleum coved skirting around unit

16

Coved former with marmoleum coved skirting to match floor

17

BRA003 - Bracket; holder; suction unit wall mounted. To be supplied by the client

18

SUC001- Suction unit; pipeline; high/low pressure; rail/wall mounted, supplied by the client ECS010 - Entertainment communication system. ECS010 Handset , entertainment communication system, to be supplied by the client. Additional patressing required

650

980

1300

980

900

4-8 7000-0004

1-3 7000-0004

1-7 7000-0010

1-7 7000-0003

C

650

28 29

18

Single Bedroom - Elevation D

D1

1 : 50

Single Bedroom - Elevation D Setting out 1 : 50

19

7

45

Parent reading light

Single Bedroom - 3D View

Integrated mobile table and locker example

Refer to first stage tender Combined Specifiations NPH-A-BDP-TD-SP-XX-XX-0001 and Reference C Doc No. NPH-A-BDP-TD-SP-XX-XX-0002

Single Bedroom Legend

600

26 23

44

17

11

9

Refer to the mock up room clinical equipment list; NPH-A-BDP-EL-7000-0001 and schedule NPH-A-BDP-SP-7000-0001 for further details

U/S Slab 3450mm AFFL

24

39

8

560

CLG-112a

Line of dummy facade

25

30

7

13 15

80

31

CLG-101

CLG-101

695

7

14

80mm tolerance/fitting gap for the unitised system

U/S ceiling 21 AFFL 2400mm

43

6

10

U/S Slab 3450mm AFFL

22

U/S ceiling 2700mm AFFL

21

3 38

CLG-112a

Bedroom Ceiling Light

695

U/S ceiling 3200mm AFFL

2

Refer to drawing NPH-A-BDP-DR-XX-XX-7000-00 details and setting out for the bedhead joinery elem specification N20 issued from Tender. Joinery pack developed further with joinery sub-contractor and c

570

1 Dummy facade

Access Radiant Panel Panel

Red line shows extent of mock-up to be built

Red line shows extent of mock-up to be built

Red line shows extent of mock-up to be built

2

4

Mock soffit to be built on site to simulate actual soffit height

Access Radiant Panel Panel

CLG-101 Mock soffit to be built on site to simulate actual soffit height

Mock soffit to be built on site to simulate actual soffit height

20

U-BHB9000 & U-BHB9001- Bedhead services medical supply on recessed panel, refer to ARUP dwgs for further details

21

Recessed bedhead - Acroyvn Wall protection 9003 Snow White Suede texture

22

JOI912 - HPL laminate MDF to face of joinery, white matt finish RAL 9016. Refer to specification N20 123

23

JOI912 - Clinical wash hand basin with recess for dispensers, HPL laminate faced MDF IPS panels with ABS edging to to match colour with pencil rounded radius edges gloss finish

24

DIS435 - Wall mounted gloves dispenser. Group 3 item provided by the client

25

DIS013 - Wall mounted paper towel dispenser. Group 3 item provided by the client

26

DIS030 - Wall mounted Soap dispenser. Group 3 item provided by the client

27

TAP290 - Clinical tap, IPS wall mounted

28

BAS101 - Clinical Wash Hand Basin

29

HOL006 - 60 Litre bin, Group 3 item provided by the client

30

U-CHT8003 - Wall Mounted PC. To be supplied by the client, refer to ARUP dwgs

31

U-CHT8054 - Wall Mounted monitor. To be supplied by the client, refer to ARUP dwgs U-TVM906 - Child personalisation panel with magnetic board and integrated TV, to be supplied by the client Sliding Door L05-IPA-GW1-S014-18-D01 with interstitial blinds

32 33 34 35

U-TVM906 - Wall mounted TV and panel - with 12mm pattress, TV to be supplied by the client, refer to ARUP specification Niche with power socket OUT010, refer to ARUP dwgs and specifications

36

DIS905 - Wall mounted Alcohol Gel dispenser, Group 3 item provided by the client

37

Bulkhead

38

Anodised metallic silver grey door, to match curtain wall with finger pull profile handle in contrasting colour with friction hinge. Facade details and co-ordination to be developed with BDP, ARUP and BAM U-BED015 - BED variable height, two-way tilt, adjustable backrest and knee-break, built-in bed extension. MAT003 - Mattress; Kings Fund bed; child; standard backrest; 1655L 865W 125D. To be supplied by the client, refer to ARUP specification

39 40

STA900 - Thermostat room temperature control, refer to ARUP dwgs

41

SWC025 - Light Switch, refer to ARUP dwgs and specifications

42

OUT905 - Single Socket, refer to ARUP dwgs and specifications

43

RAI901 - Vertical medical rail

44

RAI902 - Horizontal medical rail

45

TAB073 - Overbed cantilevered table with integrated patient bedside locker, to be supplied by the client

C05 C04 C03 C02 C01

TV panel updated following ID development Amendments following comments from GMP 1361 Amendments following comments from GMP 1361 Notes amended Issued for Construction

REVISION / DESCRIPTION

SG SS SS SS SS DRAWN

DIMENSIONS IN MILLIMETRES LEVELS IN METRES KEYPLAN

CLIENT

Blackhall Green Blackhall Place Dublin 7 Ireland T +353 (1) 474 0600 E dublin@bdp.com www.bdp.com

T E info@ www

PROJECT TITLE

National Paediatric Hospital Development new children's hospital 2006304 DRAWING TITLE

MOCK UP ROOM - SINGLE BEDROOM ELEVATIONS DRAWING STATUS

A-Issued for Construction

DRAWING No.

NPH-A-BDP-DR-XX-XX-7000-0002

NOTES

BUILDING DESIGN PARTNERSHIP SHALL HAVE NO RESPON MADE OF THIS DOCUMENT OTHER THAN FOR THAT WHICH ISSUED.

Joinery Legend

ALL DIMENSIONS SHOULD BE CHECKED ON SITE. DO NOT SCALE FROM THIS DRAWING

ANY DRAWING ERRORS OR DIVERGENCIES SHOULD BE BR OF BUILDING DESIGN PARTNERSHIP AT THE ADDRESS SHO

GENERAL NOTES: Main Reception Desk

Department Reception Desk

Central Staff Base

Staff Base/ Back Counter

Consult/ Exam Room

CAMHS/ Arts & Crafts/ School Room

CAMHS Bedroom Joinery Bed/ Integrated sofa/ Wardrobe and desk

Fixed Seating / CAMHS Fixed Seating

TV Panel / CAMHS TV Panel

Bedhead Joinery

Seating Niches

Sofa Bed ( Base carcass)

Touchdown

Play Area/ Classroom Storage

Beverage Bays/ CAMHS Kitchen

Security Desk

Desk Hatch Portal

Built-in Worktop

Nappy Change

Vanity Unit

Main Reception Desk Legend - Ground Floor Multi-faceted face panel formed using solid surface material clad to bespoke suitable sub-structure. All edges to have nom. 2mm pencil radius. To be fully integrated with adjacent solid surface elements by seamless jointing. LED light sheet to be integrated behind selected panels. Colour changing LED’s see ARUP’s specification. Light to shine from behind in an even manner. Solid surface material: Manufacturer: avonite Colour: white f1-8016 (satin finish)

2

Upright support end panels formed using solid surface material clad to bespoke suitable sub-structure. All edges to have nom. 2mm pencil radius. To be fully integrated with adjacent solid surface elements by seamless jointing. solid surface material: Under counter storage with tamper proof lockable drawers. Laptop charging point located inside drawer units for 4 computers. Suitable timber /moisture resistant MDF framework with HPL laminate face. Colour to match solid surface white. Manufacturer: avonite Colour: white f1-8016 (satin finish) nom. o/a structure thickness: 100mm

5

4 NPH-A-BDP-DR-00-XX-7100-5001

2

NPH-A-BDP-DR-00-XX-7100-5001

95 13

19 17

174

0 75

1

4445 600 211.6 7°

L00-MAI-PUB-S081-01 Welcome Centre - Concierge Reception Desk (4 w/s)

1200

600 7° 211.6

350

350 50 0

1000

14 400

95 14

14

1210

0 52

3

Reception desk worktop formed using solid surface material clad to bespoke suitable sub-structure. All edges to have nom. 2mm pencil radius. To be fully integrated with adjacent solid surface elements by seamless jointing. solid surface material: Manufacturer: avonite Colour: white f1-8016 (satin finish) nom. o/a structure thickness: 60mm

14

4

Emergency alarm activation button.

1

5

Reception desk carcass / sub-frame structure formed using suitable construction to support solid surface cladding and desk function.

6

Central upright support to desk (hidden below desk, adjacent carcass) formed using suitable sub-frame structure / recessed post and cantilevered bracket / support arm. Spray paint / powder coat finished with high impact satin finish to any metal work, RAL 9003 signal white, to match solid surface to outer faces.

0 35

500

35 0

ce

495

50

15 DD A C 00 lear an

600

100

2930

188

350

7 8

NPH-A-BDP-DR-00-XX-7100-5001 3

2

1 : 50

Plan 1 : 20

340

790

1075

60 1100 700

LED Sheet Light

1100

LED Sheet Light

LED Sheet Light LED Sheet Light

1

Ensure no drainage or supply runs are located withi proximity and/or directly above the switch/socket ou All fixings to be hidden fixings.

To be read in conjunction with bdp equipment sch fo NPH-A-BDP-RP-7000-0037 and ARUP

Joinery notes and finishes

1. All joinery drawing finishes to be read in conjunc (7100) series drawings and finishes legend. 2. Contractor to provide rods / shop drawings for co by project team prior to commencement of manu 3. Contractor to provide finishes / materials sample comment by the project team prior to procureme including samples of edging / lipping and corner as appropriate. 4. Contractor to coordinate all M&E, IT and service requirements to joinery items. 5. Contractor to site verify all dimensions and fully coordinate site installation. 6. All details to be checked by the contractor and discrepancies notified to the project team. 7. Contractor to coordinate and verify structural inte reception desk and fabricate a suitable structure purpose as part of c.d.p.

Mobile induction loop, refer to ARUP details

DDA Recess Proprietary adjustable feet to frame base, concealed from by outer faces.

WIP

Floor grommets to co-ordinate with desk position - layout and positioning by others.

12

Cable management route integrated containment to carcass sub-frame structure with proprietary removable access panels.

13

Proprietary cable tray / cage to full width of reception desk rear inner face. To fully integrate with cable management route.

14

80mm diameter proprietary desk grommets in stainless steel finish with associated covers. To fully integrate with cable management route.

REFER TO SHEET NPH-A-BDP-DR-XX-XX-7100-5026 FOR BUILT IN SEATING ASSOCIATED WITH RECEPTION AREA. REFER TO SHEET NPH-A-BDP-DR-XX-XX-7100-5019 FOR DESK SETTING OUT DIMENSIONS.

LED Sheet Light

3

Location of setting-out of sockets and spurs to equip coordinated between main contractor and consultan final site verification by contractor.

White HPL finish to underside of worktop and inside fascia panel RAL 9003, signal white, to match solid surface to outer faces.

9 10 11

Location Plan

1

All joinery items to coordinate with client equipment and associated service requirements to be coordina contractor.

C01

Issued for Contract

BC/S MA/S

REVISION / DESCRIPTION

DRAW

11 915

235 1000

DIMENSIONS IN MILLIMETRES LEVELS IN METRES

100 235

340

1 : 20

3

290

3

KEYPLAN

50

Elevation A

80 35

8

14 5

60

1

13 12 4 700

3

1100

13

60

760

340

12

6 8

1100

9

2

700

2 8 780 350

600

1200

600

350

600 1380

10 200

655 CLIENT

4

Elevation B

5

1 : 20

Section 1 : 10

Blackhall Green Blackhall Place Dublin 7 Ireland T +353 (1) 474 0600 E dublin@bdp.com www.bdp.com

T E info@ www

PROJECT TITLE

New Children's Hospital PROJECT NUMBER

2006304 DRAWING TITLE

3D Visual - At daylight

3D Visual - At night

3D Visual

Joinery Details Main Reception Desk L00 TYPE FXJ-101-A DRAWING STATUS

A1-Issued for Contract

DRAWING No.

NPH-A-BDP-DR-00-XX-7100-5001


TITLE/PROGRAM:

Avenida Infante Santo, 69 a-c, 1350-177 Lisbon, Portugal

Favelas into new neighborhoods, SĂŁo Paulo. This project was the winning proposal of an Urban Planning and Architecture competition contest(RENOVA SP) to renovate the SĂŁo Paulo favelas(slums). A large-scale project.

ws 3


D2


D2

D2

D2

D2


1

2 76

GU

A IR

02

GU

IR

LA

AN

A

0 RU

AC

A

RU

A RU

C034 LA

TR

03

AV

E .S

M

N

E OM

AN

GU

IR

A

M NOME VLA. SE

M NOME VLA. SE

R001*

AR

AC

A

AR

AC

AN

VIE

AR

770

VIE

TR

AV

.S

EM

NO

ME

C

RUA ARACAN

VIELA 04

GUIRA

RU

VIELA 04

C024

OR

AC

AC

IRA

RU

OR

755

VIELA 04 VIELA 04

A

IR RU

GUIRA RUA ARACAN

780

ÇU

ÇU

VIELA 05

NOME

C019

VIELA 05

VIELA 05

TRAV

TRAV

. SEM

. SEM

755

NOME

RU

RUA ARACANGUIRA

RUA ARACANGUIRA banco

banco

VIELA 06

MA

NAC

C023

AIA RU

AA

MA

AIA NAC

VIELA 06 VIELA 06

VIELA 07

AA

C020

C017

ARAR IPIRA

RU

C016

VIELA 08

RUA

VIELA 07

VIELA 06

VIELA 07

C009

78 5

VIEL

A 08

VIELA 09

DA TILHA MPAR

VIELA 11

C011

VIELA 09

VIA CO

VIELA 09

VIELA 11

VIELA 09

C010

VIELA 09

VIELA 09

VIELA 09

C012 ARV

VIELA 10

A 12

ADA

VIELA 10 RUA CORRUIRAÇU

A CORRUIRAÇU

C014* C015

RTILH

C013*

VIELA 10

3

Analysis of one of the neighbourhoods/Slums included in the project.

4

These detail drawings were aimed to characterize preliminarily the conditions of the foundations:

1 - Situation before intervention. Indicating the slums to be removed 2 - Project / Intervention areas. Indication of landscape and leisure spaces

3, 4 - Geotechnial consolidation revision. Plan and section of alley 6 5- Landscape plans and sections of the alleys 4 and 6

5

D2


TITLE/PROGRAM:

2-24-8 Minami Aoyama, Minato-ku, Tokyo, 107.0062 Japan JOB TITLE

Architectural Intern

LI-ZE SOHO Design Competition, Beijing, China. A-class rated offices in a 200meter-rise tower. Two Options: Separeted volumes (1) and Combined volumes (2). CD phase proposal; Client: SOHO China

ws 4 .1


1

The site is located at Li-Ze, Beijing's new Financial District, and situated at a strategic infrastructural junction adjacent to a subway interchange station and elevated expressway connecting the 2nd and 3rd ringroad. A park-like setting surrounds the site with a boulevard to the north and a park with the future underground mall to the west. The requested development indicates a precise program that fills out the site with a 200m tall tower and a 30m tall podium.

2


3

In the first option(images 1 and 2), the tower and the podium(23,000m2 in a double height entrance lobby space) are separated in differente volumes. While the Sunken Garden is positioned above the subway line. In the second option(images 3 and 4), the office tower and the podium are combined together in the same building, and the Sunken Garden continues as a part of the city park.

1, 2 - Separated Volumes proposal. 3, 4 - Combined Volumes proposal.

4


5

8

6

7

5,6 High-raise courtain wall option 1 7 CD detail proposal option 1

• View from the Silken Garden: • Access to Metro Station

Separated volumes proposal - Rhino volume study

9

10

8, 9 High-raise courtain wall option 2 10 CD detail proposal option 1

Silken Garden

Combined volumes proposal - Rhino volume study


1

2

3

4

5

6

7

8

9

Study for a third proposal.

This proposal consisted in a separated combination of volumes. Being, however, connected in the Podium


A

B

C

1

Studying options for the facade

2

3 1, 2, 3

Silken Garden

Combined volumes proposal - Rhino volume study

Options studied

Podium access / Main entrance


TITLE/PROGRAM:

2-24-8 Minami Aoyama, Minato-ku, Tokyo, 107.0062 Japan JOB TITLE

Architectural Intern

Multifunctional building for the EPFL University of Lausanne, Switzerland. The project was the winning proposal of a international Design competition.

ws 4 .2


Cc2 0505

Cc3 0402

Cc2 0505

Cm1 0403

Cm2 0403

Cm1 0403

Cm2 0403

Cm3 0508

Cg1 0010

Cm3 0508

Allée de Savoie

Cc3 0505

Pl. Cosandey


Cw1 0401

Cw2 0401

Cc1 0402

Allée de Savoie

Cwl 0504 Cg1 0010

Cg1 0010

Cl1 0010

L'Esplanade

Cl1 0010

Cw1 0401

Cw2 0401

Cc1 0402

16 TON

Cl2 0010

Cl2 0010

Cl3 0010

Ch. des Machines

Kengo Kuma & Associates, together with Holzer Kobler Architekturen from Zurich, won the architectural design competition launched in 2012 to develop Cosandey Square at EPFL. The project, “Under One Roof,” will unite an experimental Art & Sciences space and a demonstration pavilion under a single, long stone roof at the Montreux Jazz Lab.

Confédération Suisse

Représentée par: CEPF Conseil des Ecoles Polytechniques Fédérales ETH-Rat Immobilien Häldelwieg 15, ETH Zentrum - 8092 Zürich Délégué du propriétaire: EPFL Ecole Polytechnique Fédérale de Lausanne Domaine immobilier et infrastructures BS 127 (Bâtiment BS), Station 4 - 1015 Lausanne

Rte des Noyerettes

ENTREPRISE TOTALE Marti Construction SA Chemin d'Entre-Bois 29 - CP 45 - 1008 Lausanne tél: +41 21 622 07 07 - marti-construction@martisa.ch ARCHITECTE Kengo Kuma & Associates 2-24-9 BY-CUBE 3F Minamiaoyama Minato-ku Tokyo 107-0062 Japan tél: +81 80 5092 3991 - epfl@kkaa.co.jp

The project site is a vast lawn, a void in the middle of the EPFL Holzer Kobler Architekturen GmbH Ankerstrasse 3 CH-8004 Zürich tél: +41 44 240 52 00 - epfl@kkaa.co.jp

campus. It disconnects the North side of the campus (with the Esplanade plaza, social heart of the campus, and the tram staINGENIEUR CIVIL INGPHI SA Rue Centrale 9bis - 1003 Lausanne tél: +41 21 310 77 88 - central@ingphi.ch

tion) from the student residential area on the South. Also it INGENIEUR CVS BG Ingénieurs-conseils Avenue de Cour 61 Case postale 241 - 1001 Lausanne tél: +41 216181111 - thierry.occelli@bg-21.com

separates the dense West part of the campus with the currently evolving East side that is articulated around the impressive presGEOTECHNIQUE Karakas & Français Avenue des Boveresses 44 - 1010 Lausanne tél: +41 21 654 44 88 - karakas-francais.sa@bluewin.ch

ence of the Rolex Learning Center. INGENIEUR RESEAUX Schopfer & Niggli SA Bd. de Grancy 19A - 1006 Lausanne tél: +41 21 613 14 11 - info@schopfer-niggli.ch

Rolex Learning Centre, by SANAA

INGENIEUR ELECTRICITE Scherler, Ingénieurs-conseils Ch. de Maillefer 36 - 1052 Le Mont-sur-Lausanne tél: +41 21 641 47 10 - carmelo.arcoria@scherler.ch Ch. des Machines INGENIEUR LUMIERE L'Observatoire International 120 Walker Street, 7th Floor East - New York, NY 10013 tél: +1 212 255 44 63 - info@lobsinti.com INGENIEUR ACOUSTIQUE AAB - J. Stryjenski & H. Monti SA Rue des Noirettes 32 - 1227 Carouge tél: +41 22 827 80 40 - aabmonti@bluewin.ch INGENIEUR PHYSIQUE DU BATIMENT AAB - J. Stryjenski & H. Monti SA Rue des Noirettes 32 - 1227 Genève tél: +41 22 827 80 40 - aabmonti@bluewin.ch ETUDE DE FACADES ... DESIGNER MOBILIER ... AMENAGEMENT / PRODUCTION ... AMBIANCE / SIGNALETIQUE ... SCENOGRAPHIES DIVERSES ... ARCHITECTE PAYSAGISTE ...

Altitude de référence: Niveau ±0.0

Groupement KKHK Projet

Auteur

UOR ARC

Partie de l’ouvrage

BAT G

Phase: N° Affaire:

Niveau/Coupe/Facade

Rg

Phase

No. plan

Indice

02 0001 r7

Holzer Ko Ankerstr Tel: + 41 Fax: + 41

Titre

Pla ma

UOR-ARC-BATG-Rg-2-0001-r7 Plan de masse

MISE À L'ENQUETE © KKAA

Japan Tel.: +81 3 3401 7721 Fax: +81 3 3401 7778 kuma@ba2.so-net.ne.jp

KENGO KUMA & ASSOCIATES 2-24-8 BY-CUBE 2F Minamiaoyama Minato-ku Tokyo 107-0062

Mise à l'enquete

Indice:

81203

r1

Date: 2013/06/20

Provisoire

812

Dess:

Description de la modification:

NM

Révision du projet (réduction selon so


Allée de Savoie

Cm2 0403

Cm3 0508 y07

y06

y05

y04

380.00

y03

y02

y01

380.00

x01

Végétation Haute

Grille de prise d'Air Neuf (5sqm) 60% Transparance 498.32

x02

178.84

[BO-04]

z01

[BO-04]

P

Parois EI30

[PI-03]

+25

+23

+24

+20

+19

+18

+17

Escalier R60 [BO-04] +14

+11

+13

+12

+10

+08

+06

+05

+04

+03

Grille de prise d'Air Neuf (5.4m²) 60% transparance de 11m²

845.00

M6 1311

accès à la Mezzanine

[PI-03]

[BO-04]

M3 1311

M2 1311

[BO-04] 2248.32

position boîte de sol da vérifier x03

Plancher type M5

40 Sièges

Ouverture désenfumage

[BO-04]

[PI-03]

Faîtage

905.00

boîte de sol 56 Sièges

Garde-corps maille métallique

position boîte de sol da vérifier

x04

+4.34 +400.23

[PI-02] 391.85

[PI-02]

9

1

7

4

1 +0

+0

2

3

+0

+0

+0

5

6

+0

+0

+0

8

+1

+1

3

4

5 +1

+1

+16

7

8 +1

+1

+1

+2

Cm3 0508

Cm2 0403

0

3

+2

5

+0.50 +396.39 +2

z02

[BO-04]


Cm1 0403 y16

Descente de gouttierre_n.12

y15

y14

y13

y12

y11

y10

y09

y08

Descente eaux pluvial a travers la paroi_n.13

Descente de gouttierre_n.11

[CE-02]

[CE-01]

Plancher incombustible EI60 Parois EI60 Portes EI30

+01

+05

+02

+03

+04

+06

+07

+08

+09

+10

Plancher type M6

[PI-03]

Parois EI30 [PI-03]

16 Sièges

+4.34 +400.23

[PI-03]

[BE-03]

Parois EI30

+4.34 +400.23

Porte EI30

[PI-03] Garde-corps Vitrage

Porte EI30C Porte EI30C

Vitrage EI30

Parois EI30 AC - XX

Ouverture désenfumage

12 Sièges

Parois EI30

Faîtage

sprinkler sous toiture

Vitrage EI30 [PI-03] écran de diffusion réduites

Descente de gouttierre_n.15

AC - XX

AC - XX

Descente de gouttierre_n.16

Descente de gouttierre_n.17

Cm1 0403

Var.


-0.16 + 395.73

Cc3 0402 y26

y25

y24

y23

y22

y21

y20

y19

y18

y17

-0.03 + 395.86 12.0

+ 0.00 + 395.89

-0.03 + 395.86

+0.27 + 396.16

+0.27 + 396.16

Végétation Haute

1%

2%

+ 0.04 395.93

Poteau metallique

nique sous-sol

Poteau metallique

Borne anti belier

+0.34 + 396.23 Poteau metallique

Borne anti belier 2%

+ 0.01 + 395.90

Descente de gouttierre_n.10

accés technique Descente

66.0

Borne anti belier - amovible

Caniveau

Parois EI30

Parois EI30

e anti belier - amovible

140.3

+ 0.17 395.99

op

BatC_A2 Surf. 8.5 m² C1 1311

Portes EI30

1659.1

entrée principale [PI-02]

Portes EI30

Parois EI60

Vitrage EI30 Vitrage WK5

+ 0.17 + 396.06

+ 0.14 + 396.03

923.5

935.1

projecteur au plafond

BatC_A1 | Ca 30 Espace d'accueil Surf. 49.7 m² Plafond / HL 3.00m

+0.34 +396.23 SL

sprinkler sous toiture

[BE-01]

[BE-01]

BatC_Esc2 Escalier Surf. 52.1 m²

H

H -22

-21

-20

-19

-18

-17

45.0 -16

-15

-14

-13

-12

-11

-10

1080.0

boucle magnetique

1217.3

/ 80 sqm

Détecteur de

-09

-08

-07

-06

-05

-04

-03

-02

-01

surface d'esposition +0.34 + 396.23

66.0

Socles de protection 20x80x120 cm Descente de gouttierre_n.18

2.7 %

401.97

Poteau metallique

+0.34 + 396.23

+ 0.19 + 396.08 + 0.22 + 396.12 2268.0

40 TON + 0.26 + 396.15

+ 0.26 + 396.15 Cc3 0505

+0.31 +396.20

+0.31 +396.20

Porte g

Portes EI30

Ccl1 0506

Ouverture désenfumage escalier Borne anti belier

[BE-03] Ccl1 0506

Portes EI60

[BE-02] BatC_Sa1 Surf. 8.1 m²

Faîtage sprinkler sous toiture

age

[AC-04] BatC_Asc1 Surf. 16.1 m² Ouverture ventilation

C1 1311

946.8

942.5

gaine technique

511.8

+ 0.07 + 395.96

BatC_S1 Storage et exploitation Surf. 54.5 m² / 50 sqm HL Variable 332.7

[BE-03]

Portes EI60

442.5

451.8

entrée merchandises

Plates-formes elevatrices 300x200

BatC_Cam Zone camion Surf. 61.0 m² HL Variable

+0.34 +396.23 SL

Portes EI30

Socles de protection 20x80x120 cm

Descente

1%

Pl. Cos


-0.11 + 395.78

-0.11 + 395.78

-0.16 + 395.73

Cc2 0505

Match line

projection galerie technique sous-sol

y36

y35

y34

y33

y32

y31

y30

y29

y28

y27

7978.8

-0.03 + 395.86

+0.27 + 396.16

7588.0

projection galeire technique sous-sol

projection galerie technique sous-sol Végétation Haute

Végétation Haute

Végétation Haute

bornes anti-bélier longueur de la vitriage à vérifier que le prospectus

Borne anti belier

Grille de prise d'Air Evacué Trou d' homme 80x80 cm

2%

2%

accés technique de gouttierre_n.9

Joint silicone

Descente de gouttierre_n.8

Descente de gouttierre_n.7

Parois type C1

panneau de bois perforé

+0.34 +396.23 SL

118.8

Cg1 0010

120.0

BatC_C2 -01 -02 -03 -04 escalier -05 -06 -07 -08 -09 -10 -11 -12 -13 -14 -15 -16 -17 Ouverture Surf.5.2 m² désenfumage

projection

BatC_Esc3 -22 -21 -20 -19 -18 -17 -16 -15 -14 -13

130.0

BatC_E1 | Espace d'e Surf. 581.0 Str. exp./ H

+06

+05

+04

+03

+02

+01

130.0

guillotine

Portes EI30

[BE-01]

[BO-06]

BatC_Esc4

BatC_Ca Surf. 9.2 m²

433.2

[BE-03]

685.3

671.9

170.0

BatC_C1 Surf. 7.8 m²

BatC_Esc1 Surf. 79.7 m²

Parois EI60

-01 -02 -03 -04 -05 -06 -07 -08 -09 -10 -11-12

Parois EI60 Portes EI30 Plancher type C4 Ouverture désenfumage escalier

Ouverture désenfumage

[CE-01]

Faîtage sprinkler sous toiture

Faîtage

Parois EI60

sprinkler

Détecteur de fumée au plafond

Portes EI30 957.7

4173.6 552.4

dernière gradin

dernière gradin accessible

boîte de sol

e fumée au plafond

Cg1 0010 +0.34 + 396.2

de gouttierre_n.19

150.00

Joint silicone

Descente de gouttierre_n.20

Descente de gouttierre_n.21 3.42 %

+0.34 + 396.23

SILATEC B1

Grille de prise d'Air Neuf + 0.20 + 396.09

1126.8

3028.0

Cc2 0505

1%


Cw1 0401 y62

y61

y60

y59

y58

y57

y56

y55

y54

+24

+22

+23

+21

+19

+20

+18

+17

+16

+15

+14

+13

+12

+11

+10

+07

+09

+08

+06

+05

+02

+04

+03

+01

1.00 %

1.00 %

Descente de gouttierre_n.1

sortie de secours

VC 345mm

Sonde d'ambiance

+4.04 +399.93

boîte de sol

[BO-05]

1.26 %

[BO-05]

1.00 %

Vitrage EI30

Portes EI30

boîte de sol W2 1311

[PI-03]

+8 +7 +6

Ouverture désenfumage escalier

Sonde d'ambiance

Sonde d'ambiance

20

21

19

+

18

+

+

14

+

13

+ 17 16 15

12

+

+

+

+

+

09

08

11 10

+

07

+

05

+

+

04

06

+

+

03

02

+

01

+

+

+

Ventilo convecteur

+

Vitrage EI30

Faîta

Faîtage

Sonde d'ambiance

Ecran de projection dans le sol projection 16/9 cahier des charges [07.01.2013 4/9]

+5 +4 +3 +2

[PI-03]

+1

W3 1311

Descente eaux pluvial a travers la paroi _ n.26

Grille de prise d'Air Neuf

Descente eaux pluvial a travers la paroi _ n.25

+ 2.84 +398.73

Descente eaux pluvial a travers la paroi _ n.24

4.5 %

+1.80 +397.69

5.5 %

projection 16/9 250.50

215.44

382.91

445.23

PROJECTION 16/9 SUR ÉCRAN COLLISANT

+1.82 +397.71 SL

+1.61 +397.51 SL

+1.61 +397.51 SL 3.3 %

3.3 %

3.3 %

3.3 %

3.3 %

3.3 %

3.3 %

3.3 %

3.3 %

Cw1 0401


y69

y68

y67

y66

y65

y64

y63

x01

Profiles metalliques HEA 300

498.32

2.02 %

z02

ge

x02

3.71 399.60

Profiles metalliques HEA 300

845.00

Cg1 0010

511.96

CL1 0010

x03

905.00

L'extension de l'esplanade x04 1234.01

3.3 %

3.3 %

3.3 %


The Montreux Jazz Lab, with an area of 1,400 square meters, is located in the southern part of Cosandey Square and will accommodate a Montreux Jazz CafĂŠ and a theater/concert hall with a stage. These spaces can be separated or combined depending on the area needed. Innovative experimental devices developed by the EPFL MetaMedia Center together with the EPFL+ECAL Lab will also allow visitors to relive 50 years of concerts recorded at the renowned Montreux Jazz Festival.


310.0

+11.36 +407.25

accès à la Mezzanine +04.04 +399.93

290.5

1F

GF

+00.34 +396.23

peV-04 UOR-ARC-BATG-DF-2-1011-r1 380.0

380.0

y01

380.0

y02

y03

380.0

y04

y05

+11.36 +407.25

+09.58 +405.47

+07.95 +403.84

+09.19 +405.08

+07.61 +403.50

498.2 1F

+04.34 +400.23

GF

+00.34 +396.23

220.0

332.5

220.0

accès à la Mezzanine

348.4

Grille de prise d'Air Neuf (5.4 m²)

esplanade

x02

x03

x04

ligne supérieure de lignatur

Poutres longitudinales S235

Poteau metallique

Poteau metallique

Poteau metallique

526.3

accés technique sortie de secours

+0.65 -- +396.54 voiture protection

Socles de protection 42x96x120 cm

Borne anti belier

12.0

12.0

12.0

6.5

40 ton

peO-02b UOR-ARC-BATG-DF-2-1001-r1 380.0

y21

380.0

y20

380.0

y19

380.0

y18

380.0

y17

380.0

y16

380.0

y15

peO-02 UOR-ARC-BATG

380.0

y14

380.0

y13

380.0

y12

380.0

y11


Match line

BO-03 - Perforé OSB

Sprinkler

Vitrage EI30

BatC_E1 581.05 m²

-02.57 +393.32

0010 Cg1

SS

+00.34 +396.23

RC

x02

x01

Confédération Suisse Représentée par: CEPF Conseil des Ecoles Polytechniques Fédérales ETH-Rat Immobilien Häldelwieg 15, ETH Zentrum - 8092 Zürich

Toiture type 1

Délégué du propriétaire: EPFL Ecole Polytechnique Fédérale de Lausanne Domaine immobilier et infrastructures BS 127 (Bâtiment BS), Station 4 - 1015 Lausanne

250.00

ENTREPRISE TOTALE Marti Construction SA Chemin d'Entre-Bois 29 - CP 45 - 1008 Lausanne tél: +41 21 622 07 07 - marti-construction@martisa.ch ARCHITECTE Kengo Kuma & Associates 2-24-9 BY-CUBE 3F Minamiaoyama Minato-ku Tokyo 107-0062 Japan tél: +81 80 5092 3991 - epfl@kkaa.co.jp

30.0 0

Holzer Kobler Architekturen GmbH Ankerstrasse 3 CH-8004 Zürich tél: +41 44 240 52 00 - epfl@kkaa.co.jp

22.10

INGENIEUR CIVIL INGPHI SA Rue Centrale 9bis - 1003 Lausanne tél: +41 21 310 77 88 - central@ingphi.ch

descente de gouttière portes pour vérification

INGENIEUR CVS BG Ingénieurs-conseils Avenue de Cour 61 Case postale 241 - 1001 Lausanne tél: +41 216181111 - thierry.occelli@bg-21.com GEOTECHNIQUE Karakas & Français Avenue des Boveresses 44 - 1010 Lausanne tél: +41 21 654 44 88 - karakas-francais.sa@bluewin.ch INGENIEUR RESEAUX Schopfer & Niggli SA Bd. de Grancy 19A - 1006 Lausanne tél: +41 21 613 14 11 - info@schopfer-niggli.ch INGENIEUR ELECTRICITE Scherler, Ingénieurs-conseils Ch. de Maillefer 36 - 1052 Le Mont-sur-Lausanne tél: +41 21 641 47 10 - carmelo.arcoria@scherler.ch

165.00 25.00

12.00 25.00

PI-02

INGENIEUR LUMIERE L'Observatoire International 120 Walker Street, 7th Floor East - New York, NY 10013 tél: +1 212 255 44 63 - info@lobsinti.com

30.00

12.00

395.72

12.00

2

paratonnerre

395.72

INGENIEUR ACOUSTIQUE AAB - J. Stryjenski & H. Monti SA Rue des Noirettes 32 - 1227 Carouge tél: +41 22 827 80 40 - aabmonti@bluewin.ch

25.00

240.00 - 02.57 +393.32

38.00

38.00

19.50 cm +02.95 SS cb +392.94

25.00 241.00

240.00

278.00

SS Gal.

20.00

INGENIEUR PHYSIQUE DU BATIMENT AAB - J. Stryjenski & H. Monti SA Rue des Noirettes 32 - 1227 Genève tél: +41 22 827 80 40 - aabmonti@bluewin.ch

Gall G

-03.1 +392.7

ETUDE DE FACADES ... DESIGNER MOBILIER ... AMENAGEMENT / PRODUCTION ... AMBIANCE / SIGNALETIQUE ... SCENOGRAPHIES DIVERSES ... ARCHITECTE PAYSAGISTE ...

Altitude de référence: Niveau ±0.00 = 395.70

Groupement KKHK Projet

Auteur

UOR ARC

Partie de l’ouvrage

BAT C

KENGO KUMA & ASSOCIATES 2-24-8 BY-CUBE 2F Minamiaoyama Minato-ku Tokyo 107-0062

Niveau/Coupe/Facade

Cc

Japan Tel.: +81 3 3401 7721 Fax: +81 3 3401 7778 kuma@ba2.so-net.ne.jp

Phase

No. plan

Indice

02 0402 r3

30.00

+03.88 +392.01

Phase: Mise à l´enquête N° Affaire: 81203 Responsable: Javier VIllar Ruiz Contrôlé par: Nicola Maniero Echelle: 1:100 / 1:50 Format: A1+++ (59.4 x 126.1 cm)

Titre

BatC Coupes.pdf

UOR-ARC-BATC-Cc-2-0402-r3 BatC Coupes

81203-1000

MISE A' L'ENQUETE - Provisoire SS CVS

Holzer Kobler Architekturen Ankerstrasse 3 CH-8004 Zürich Tel: + 41 44 240 52 00 Fax: + 41 44 240 52 02

Indice: a2

Date:

Dess:

Description de la modification:

NM

Redefinition des coupes

r1

2013/07/19

NM

Révision du projet (réduction selon solution B)

r2

2013/08/31

NM

Mise à jour

r3

2013/09/13

NM

Mise à jour

2013/05/15




CONFIGURAÇÃO DOS LODGES

GERAÇÃO DOS MÓDULOS

LODGE 2 MÓDULOS: TIPO 1

LODGE TIPO 2

2

Lodge configurado por 2 módulos: A e B

Lodge configurado por 2 módulos: A e C

LODGE 3 MÓDULOS: TIPO 1

LODGE TIPO 2

Lodge configurado por 3 módulos: A, C e D

Lodge configurado por 3 módulos: A, B e D

LODGE 4 MÓDULOS: TIPO 1

LODGE TIPO 2

Lodge configurado por 4 módulos: A, B, C e D

Lodge configurado por 4 módulos: A, B, C e D

MÓDULOS:

B

3

MÓDULOS:

Volume inicial de 12x12 metros

Adaptação da cobertura para um sistema de duas águas

Corte do volume inicial em 4 partes

Cada uma das partes resultantes é uma peça pré-fabricada que se usará para a configuração base dos diferentes módulos. Dependendo do seu tamanho, cada módulo alberga um programa diferente:

A

Instalação Sanitária

B

Dormitório duplo

C D

Dormitório de casal

MÓDULOS:

Sala

TITLE/PROGRAM: Architecture contest: Hotel Lodge Resort. Wako Kungo, Angola.

OPERA | DESIGN MATTERS Calle Pallars 84, 5a 6o Barcelona 08018 Spain

4

JOB TITLE

Architectural Intern

WS 5

INTERNSHIP


OBJECTIVOS Ao desenhar uma unidade de turismo com estas particularidades houve um conjunto de directrizes que foram traçadas e fundamentais para delinear toda a proposta. O objectivo primordial foi a concepção de um conjunto sustentĂĄvel, respeitando o FDP TJTUFNB FYJTUFOUF BMJBEP B VNB WPOUBEF de proporcionar o maior conforto possĂ­vel ao usuĂĄrio, e uma resposta programĂĄtica e compositiva que fosse, ao mesmo tempo, GVODJPOBM BQSB[Ă€WFM F ĂŠOJDB &N CBJYP TÂşP enumeradas os parâmetros que caracterizam a proposta: SISTEMATIZAĂ‡ĂƒO utilizando a prĂŠfabricação dos vĂĄrios componentes dos Lodges, ĂŠ usada uma lĂłgica de construção que permite a sistematização do processo de montagem. As peças serĂŁo fabricadas em sĂŠrie, agrupadas por semelhança formal, transportadas e montadas de uma forma TJTUFNÂľUJDB 6NB SFEVºP TJHOJlDBUJWB EB moldura temporal e, principalmente, de custos sĂŁo os principais benefĂ­cios. A possibilidade de adicionar (ou eventualmente, remover ou USPDBS PT NĂ…EVMPT RVF DPNQÉFN PT -PEHFT lDB UBNCÂźN GBDJMJUBEB QFMB VUJMJ[BºP EFTUF processo. FLEXIBILIDADE o desenho dos Lodges foi concebido desde um ponto de vista modular, o que permite, alĂŠm da sistematização da construção dos vĂĄrios elementos que os DPNQÉFN VNB EJTQPTJºP F VNB SFMBºP com o terreno potencialmente Ăşnica para cada um deles. Apesar de estarem baseados nos mesmos princĂ­pios modulares, o facto de poderem ser agrupados de forma bastante livre, permite que se obtenham muitas WBSJBÉFT QPTTĂ€WFJT EFOUSP EF VN NFTNP modelo. Desta foma ĂŠ possĂ­vel responder a um grande leque de requerimentos de um NFSDBEP BJOEB OÂşP EFlOJEP DPN DMBSJEBEF F oferecer um catĂĄlogo rico de possibilidades aos clientes. ADAPTABILIDADE Ă s condicionantes EP MVHBS DPN NĂ€OJNBT BMUFSBÉFT TPCSF P DPOUFYUP P RVF QFSNJUF EFTFOWPMWFS HSBOEF parte do projecto com um alto grau de liberdade em relação ao lugar e, ao mesmo tempo, estabelecer uma relação com o mesmo de verdadeiro respeito. Esta solução permitirĂĄ EFlOJS B FTUSBUÂźHJB EF QPTTĂ€WFJT BNQMJBÉFT PV USBOTGPSNBÉFT EP QSPHSBNB F NBOUFS uma coerĂŞncia ao longo da intervenção e com custos controlados. SUSTENTABILIDADE por uma questĂŁo ĂŠtica em relação ao âmbito da intervenção, toda a proposta baseia-se numa premissa de minimização de impactos ambientais, a utilização de materiais eco-amigĂĄveis, e uma polĂ­tica de gestĂŁo energĂŠtica inteligente. A utilização de energias alternativas, e a optimização tĂŠrmica dos edifĂ­cios possibilita uma redução, ao mesmo tempo, do consumo de energia e do impacto ambiental. Apesar de, numa primeira fase, o investimento inicial a nĂ­vel energĂŠtico ser mais avultado do que o normal, a longo prazo esta polĂ­tica ĂŠ recompensadora porque alĂŠm dos gastos energĂŠticos reduzidos, o entorno ambiental ĂŠ grandemente CFOFlDJBEP Por ser baseada em premissas honestas de uma perspectiva ambiental e da sustentabilidade e desenhado tendo em vista o conforto, a funcionalidade e a originalidade da solução, uma proposta desta natureza trarĂĄ um enorme valor adicional ao local onde irĂĄ ser implantada.

CONFIGURAĂ‡ĂƒO DOS LODGES

GERAĂ‡ĂƒO DOS MĂ“DULOS

ELEMENTOS DE CO

LODGE 2 MĂ“DULOS: TIPO 2

-PEHF DPOlHVSBEP QPS NĂ…EVMPT AeB

-PEHF DPOlHVSBEP QPS NĂ…EVMPT AeC

LODGE 3 MĂ“DULOS: TIPO 1

LODGE 3 MĂ“DULOS: TIPO 2

-PEHF DPOlHVSBEP QPS NĂ…EVMPT A, C e D

-PEHF DPOlHVSBEP QPS NĂ…EVMPT A, B e D

LODGE 4 MĂ“DULOS: TIPO 1

LODGE 4 MĂ“DULOS: TIPO 2

-PEHF DPOlHVSBEP QPS NĂ…EVMPT A, B, C e D

-PEHF DPOlHVSBEP QPS NĂ…EVMPT A, B, C e D

B

LODGE 2 MĂ“DULOS: TIPO 1

Volume inicial de Y NFUSPT

Adaptação da cobertura para um sistema de duas åguas

Corte do volume inicial em 4 partes

Cada uma das partes resultantes Ê uma peça prÊ-fabricada que se VTBS¾ QBSB B DPOlHVSBºP CBTF EPT diferentes módulos. Dependendo do seu tamanho, cada módulo alberga um programa diferente:

A B

Instalação Sanitåria Dormitório duplo

C

DormitĂłrio de casal

D

Sala


MPOSIĂ‡ĂƒO COBERTURA 6OT UPMEPT EF DBNVmBEP RVF U½N B EVQMB GVOºP de proteger do sol e dissimular a aparĂŞncia EB FEJlDBºP 0 TFV UBNBOIP F QPTJºP TÂşP absolutamente variĂĄveis, criando uma grande EJWFSTJEBEF EF FTQBÂťPT FYUFSJPSFT TFN RVF IBKB uma sobrecarga no orçamento.

MĂ“DULOS PRÉ-FABRICADOS 6N TJTUFNB DPOTUSVUJWP TJNQMFT UJQP hCBMMPO frameâ€?, que pode ser em madeira o aço leve (light steel frame), que permite criar uma multiplicidade EF DPNCJOBÉFT B QBSUJS EF RVBUSP CMPDPT repetidos. SĂŁo compostos por elementos planos, fĂĄceis de transportar atĂŠ ao lugar e fĂĄceis de montar. Requerem uma cimentação mĂ­nima.

PLATAFORMA 6N QMBOP EF BQPJP QBSB PT NĂ…EVMPT RVF HFSB QPS TVB WF[ PT UFSSBÂťPT F PT FTQBÂťPT FYUFSJPSFT EF uso privado. A plataforma serĂĄ construĂ­da a partir EF QFÂťBT QSÂź GBCSJDBEBT EF FYUFOTÉFT DPOTUBOUFT sobre apoios pontuais. O facto de estarem elevadas do terreno, faz com que tenham uma grande liberdade de posicionamento, adaptandoTF ¸T QFOEFOUFT FYJTUFOUFT

SUPORTES 6N DPOKVOUP EF QJMBSFT EF NBEFJSB TPCSF GVOEBÉFT QPOUVBJT EF CFUºP BSNBEP QFSNJUFN B DPOUJOVJEBEF EP UFSSFOP FYJTUFOUF BP OÀWFM EP solo. Estes lugares, sombreados agora pela plataforma, poderão chegar a ser jardins privados dos apartamentos.

SECĂ‡ĂƒO TIPO


INTRODUĂ‡ĂƒO

PAISAGENS DIFERENCIADAS

O projecto desenvolve-se como resposta a um concurso de ideias restrito, promovido pela Empresa de Construção AraĂşjo LDA cujo objectivo ĂŠ estabelecer as bases, a nĂ­vel de EstĂşdio PrĂŠvio, de um “Lodge com caracterĂ­sticas marcantes e diferenciadasâ€?. O âmbito da intervenção ĂŠ uma parcela de BQSPYJNBEBNFOUF )B OP 8BLV ,VOHP provĂ­ncia de Kuanza Sul, marcada principalmente pelo rio e a presença de uma sĂŠrie de montes rochosos de grande beleza. NĂŁo dispomos, atĂŠ Ă data, de documentação UÂźDOJDB BMÂźN EF VNB GPUPHSBlB EF TBUÂźMJUF F de dados obtidos durante uma breve visita ao terreno. Com base nestes elementos, DPOTUSVĂ€NPT VN MFWBOUBNFOUP UPQPHSÂľlDP plausĂ­vel, sobre o qual pudemos estabelecer as bases do projecto e os parâmetros da estratĂŠgia de ordenação. NĂŁo obstante, ĂŠ importante ressaltar que a proposta apresentada deve ser considerada como uma estratĂŠgia de intervenção e nĂŁo como um projecto. Neste caso seria necessĂĄrio dispor de informação mais concreta, relativa tanto ao carĂĄcter fĂ­sico do terreno, como ao do projecto empresarial.

ESTRATÉGIA DE INTERVENĂ‡ĂƒO

EncontrĂĄmos no terreno quatro cenĂĄrios paisagĂ­sticos bem diferenciados. 6N EPT QBSÂśNFUSPT EP QSPKFDUP Âź P EF TBDBS QBSUJEP desta diversidade e construir uma estratĂŠgia de aproveitamento dos valores que comportam.

'PSNBÉFT SPDIPTBT TJOHVMBSFT .POUFT

LUANDA

Savana LOCAL DE INTERVENĂ‡ĂƒO

ESPAÇOS COMUNS

A proposta pretende estabelecer as bases para uma estratĂŠgia correcta de intervenção OP MVHBS 1BSB JTTP EFlOJNPT BMHVOT DSJUÂźSJPT RVF OPT EBSÂşP B mFYJCJMJEBEF F adaptabilidade necessĂĄria para fazer frente aos condicionantes que possam surgir de um estudo pormenorizado do solar. 1 Estabelecer um sistema constructivo prĂŠ-fabricado com objectivo de reduzir o impacto sobre o terreno durante a fase de construcção reduzindo, ao mesmo tempo, os custos. 2 Separar os edifĂ­cios do solo de forma a que evite movimentos de terra e reduza P JNQBDUP EB FEJlDBºP TPCSF BT ÂľHVBT TVQFSlDĂ€BJT F BP NFTNP UFNQP BQSPWFJUBS a pendente da colina para escalonar as FEJlDBÉFT DPN P PCKFDUJWP EF NBYJNJ[BS BT vistas. 3 Aproveitar as zonas mais singulares da formação rochosa para colocar de maneira integrada os espaços comuns e, em particular, a zona de piscinas e restaurante com vistas sobre o rio. 4 Criar um acesso de grande beleza paisagĂ­s-tica atravĂŠs da sublime fenda central entre os dois montes, criando assim uma sensação de chegada verdadeiramente especial. 5 Albergar a zona de suporte tĂŠcnica e de serviços numa ĂĄrea protegida das vistas, na encosta oposta do monte. 6 Criar um micro-clima com vegetação F MÂśNJOBT EF DBNVmBHFN RVF HBSBOUBN uma sensação Ăłptima de conforto para os visitantes, inclusivĂŠ durante as temporadas de calor.

Zonas agrĂ­colas

ENTRADA & SALA DE ESTAR

N 18 m2 7 m2 19 m2 13 m2 N 10 m2

SALA MULTIUSOS - TEATRO E

150m2

4BMB .VMUJVTPT 5FBUSP (VBSEB SPVQB 8$

LODGES

ADMINISTRAĂ‡ĂƒO Ç

JARDIM BOTĂ‚NICO

ADMINSTRAĂ‡ĂƒO RESTAURANTE PISCINA

ESTAR

BAR / BBQ

70m2 N N N N

RESTAURANTE T

277m2 7

SPA

70m2

PISCINA

93m2

N N 82 m2 8 m2 10 m2

#BMOFÂľSJPT 4BVOB NBTTBHFN ZPHB FUD

SPA

PRAÇA DE RECEPĂ‡ĂƒO DE VISTITANTES

1JTDJOB IJESPNBTTBHFN Banheiros & cacifos

55m2

Churrascaria - cozinha 4BMB EF KBOUBS UFSSBÂťP

N N

N 28 m2

BARBECUE

ZONA DE APOIO TÉCNICO Acesso reservado a trabalhadores

N N N

%JSFDºP 4BMBT EF SFVOJÉFT (VBSEB SPVQB 8$

$P[JOIB 4BMB EF KBOUBS CafĂŠ ArmazĂŠm WC

MULT-IUSOS

148m2

7FTUĂ€CVMP Recepção / atendimento Guarda bagagem Sala de estar / sala de espera Barr ;POB EF SFUBMIP WC

20 m2

ZONAS EXT E TERIORES COBERTA E S

N

140m2

Zonas inundĂĄveis

LODGES ZONA DE APOIO

LOCALIZAĂ‡ĂƒO

SERVIÇOS

O terreno encontra-se situado no vale do Rio Keve, sensivelmente a 30 kms a Norte de $FMB 8BLV ,VOHP NVJUP QSĂ…YJNP EP EFMUB EP rio Qussoi. 'JDB EFlOJEP FOUSF B FTUSBEB RVF VOF Quissobi e Calato e o rio Keve, servindo como paisagem de transição entre os montes rochosos de pedra viva, as suaves colinas que descem atĂŠ o rio e o vale inundĂĄvel.

ACESSO

PLANO DE ORDENAĂ‡ĂƒO Ăƒ A1 - E 1:2000 A3 - E 1:4000

SERVIÇOS

ADMINISTRAĂ‡ĂƒO

0

100

200 m

MULTIUSOS

RESTAURANTE

LODGES

LODGES

PISCINA

JARDIM BOTĂ‚NICO

BBQ

SPA

BAR JARDIM

LODGES

30 UNIDADES ((70 CAMA M S))

A distribuição programĂĄtica do Lodge e faz-se numa malha de usos interconectados. A paartir de um ponto distribuidor central onde se situa a zo ona de Estar, estabelece-se uma estrutura radial de e espaços JOUFSJPSFT F FYUFSJPSFT BMUFSOBUJWPT 6N JOUFSJPSFT F FYUFSJPSFT BMUFSOBUJWPT 6NB DJSDVMBºP de caminhos radiais, conecta os programas desde o FYUFSJPS DPN PT -PEHFT BUSBWÂźT EPT KBSEJOT Desta forma gera-se uma grande versatilidade quando forem usados os serviços comuns, permitindo acessos directos desde o vestĂ­bulo Ă s zonas mais pĂşblicas (restaurante e sala multiusos) F EJSFDUBNFOUF EFTEF BT IBCJUBÉFT B UPEPT PT serviços, incluindo a zona da piscina ou os jardins temĂĄticos. ¢ JNQPSUBOUF EFTUBDBS RVF BT DJSDVMBÉFT EF TFSWJÂťP ¢ JNQPSUBOUF EFTUBDBS RVF BT DJSDVMBÉFT EF TFSWJÂťP se produzem na sua maioria a um nĂ­vel inferior, BQSPWFJUBOEP BT EJGFSFOÂťBT UPQPHSÂľlDBT EF GPSNB B que seja minimizada a interferĂŞncia com os clientes. 6N FTQBÂťP FYUFSOP TVlDJFOUFNFOUF BGBTUBEP albergarĂĄ toda a estrutura de suporte necessĂĄria para o correcto funcionamento da instalação (gasolineira, PlDJOB FUD

Ă rea mĂŠdia por unidade

A.2

A.1 A.3

MÓDULO A. INSTALAÇÕES SANITà RIAS.:

26.07m2

A.1 SUP. TERRAÇO 1: A.2 SUP. TERRAÇO 2: A.3 SUP. I.S.:

8.53m2 3.35m2 14.19 m2

MODULO B. QUARTO DUPLO:

B.2

B.1-QUARTO DUPLO: B.2-SUP. TERRAÇO 1: B.3-SUP. TERRAÇO 2: B.4-SUP. I.S.:

B A

B.1

A

B.4

A

B.3 D D

C MĂ“DULO C. SALA:

47.07m2

C.1 SALA: C.1 SUP. TERRAÇO 1: C.2 SUP. TERRAÇO 2: C.3 SUP. COZINA:

29.51m2 5.61m2 2.44m2 9.50 m2

D.3 D.4

D.1

C

D

MODULO D. QUARTO DE CASAL:

33.31m2

D.1.-QUARTO DE CASAL: D.2-SUP. TERRAÇO 1: D.3-SUP. TERRAÇO 2: D.4-SUP. VESTIDOR:

18.98m2 2.87m2 2.60m2 8.86 m2

D.2 C.3 C.1

MĂ“DULO A: MĂ“DULO D:

0

10

20 m

A1 - E 1:200 A3 - E 1:400

0

MĂ“DULO A: MĂ“DULO B: MĂ“DULO C: MĂ“DULO D:

26.07m2 47.07m2 33.31m2

PLANTA TIPO COM TRĂŠS MĂ“DULOS

PLANTA TIPO COM DOIS MĂ“DULOS

CONFIGURAĂ‡ĂƒO DOS MĂ“DULOS PRÉ-FABRICADOS A1 - E 1:200 A3 - E 1:400

MĂ“DULO A: MĂ“DULO C: MĂ“DULO D:

26.07m2 33.31m2

10

20 m

A1 - E 1:200 A3 - E 1:400

0

D3

C.2

LODGE COMPOSTO POR MÓDULOS A, C e D SUP. TOTAL LODGE: 148.22m2 SUP. TERRAÇO: 78.03m2

LODGE COMPUESTO POR MODULOS A, C e D SUP. TOTAL LODGE: 110.68m2 SUP. TERRAÇO: 44.70m2

LODGE COMPOSTO POR MÓDULOS A e D SUP. TOTAL LODGE: 63.61m2 SUP. TERRAÇO: 45.00m2

C.4

26.07m2 37.54m2 47.07m2 33.31m2

PLANTA TIPO COM QUATRO MĂ“DULOS 10

20 m

A1 - E 1:200 A3 - E 1:400

0

10

100 m2

400m2 300m2

ESPAÇOS EXTERIORES ESTRADAS à REA E S COMUNS JARDINS T TEM Mà TICOS E ENVOLV VENT TE LODGES

37.54m2 22.07m2 6.28m2 2.08m2 7.11 m2

3000m2

ZONAS DE APOIO MORADIAS DE SERVI E CIO OFICINAS

D3

LODGES

DISTRIBUIĂ‡ĂƒO PROGRAM MĂ TICA

20 m

17000m2 7000m2 10000m2 20000m2


OPERA | DESIGN MATTERS Calle Pallars 84, 5a6o Barcelona 08018 Spain

D3

TITLE/PROGRAM:

Architecture contest: Hotel Lobito. Lobito, Angola. JOB TITLE

Architectural Intern

WS 5 .2


1

CONCEITO E APLICAÇÃO A proposta tem como ponto de partida três parâmetros geradores: •

Fazer uma clara distinção entre os dois usos (hotel E apartamentos ) e ao mesmo tempo manter uma coerência formal

Aproveitar as sinergias entre os dois programas E dar máxima flexibilidade a sua gestão.

Maximizar o número de quartos com vistas directas para o mar, sendo o caso do hotel um eficiência igual a 100%

2

D3

1.

1/200 Final Model

2.

Final Model, viewed from the west towards the courtyard


3

4

Both, the hotel and the apartments, have a modulation width of 3.8 m, which is the result of maximizing the views towards the sea and the parking spaces. Starting from there, multiple combinations allow to maintain a highly number of flexible typological solutions. 3.

5

6

First floor Plan

4.

First solution of the Hotel’s room

5.

Second solution of the Hotel’s room

6.

Conclusion and idea of the project, viewed from the main

beach.

D3


a

D3


a

OPERA | DESIGN MATTERS

TITLE/PROGRAM:

Calle Pallars 84, 5a6o Barcelona 08018 Spain JOB TITLE

Architectural Intern

Architecture contest: De La Hoya Park. Large scale project with the insertion and development of a central park. Almería, South of Spain.

D3.3

D3


La Hoya is a fascinating void at the heart of historical centre of AlmerĂ­a. In 2009 the City Hall called for ideas within the frame of a 2nd phase international competition to define the strategy for the future development of a central park that should also include a civic centre and an open archeological site. The particular conditions of the site in relation with the City Hall and the Alcazaba made the project particularly relevant for the future interests of the city.

1. 2. 3.

Aerial view of the project and final proposal Site plan Perspective views of the project


JOSÉ LACERDA SALDANHA, Arquitectos LTD.

1

2

3

4

TITLE/PROGRAM:

Restoration project and detailed drawing of the openings. Porto, Portugal.

Porto Portugal JOB TITLE

Architectural Assistant

WS 6 INTERNSHIP


5 The selected work consisted in the draft of a building from the beginning of the XX century, including the detail of the openings. The selected drawings are disposed in following order: 1.

Front elevation

3.

Section view C-D

2. 4. 5.

6. 7.

8.

9.

Rear elevation

Section view L-M

Section view N-O Ground floor plan First floor plan

Second floor plan

Details of the openings:

- front elevation

- plan section view

- vertical section view

D4

6


D4

7

8


To be an architect you have to be compelled to create

.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.