Fred Kafka Portfolio

Page 1


Kafka 2020 -2024 P O R T F O L I O

Education

FRED KAFKA

Contact

Phone: (310)-280-8219

Email: fredmkafka@gmail.com

I am a recent graduate of Cal Poly San Luis Obispo. I am passionate about designs focused on social equity, environmental remediation, and comfort

I have a range of skills through diverse exposures in academics and work.

Cal Poly San Luis Obispo Student Bachelors of Landscape Architecture Graduated 2024

Cal Poly San Luis Obsipo Student Bachelors of City Planning 2017-2019 (Changed Majors)

Clubs and Extracurriculars

Cal Poly RainWorks Lead Team Lead 2024

Cal Poly Wind Power GIS Lead 2020 - 2021

Boy Scouts Eagle Scout 2012-2017

Awards

2021 US Department of Energy Collegiate Wind Power Competition 3rd Place

University Union Redesign

RainWorks Competition

Merced River Trail
Arboretum Work

Rainworks Competion

Analysis of Grey Water Contamination and Their Solutions

Location

Cal Poly SLO Campus

Club Name

Cal Poly Water Works

Project Type

Club Group Work

Project Year Winter - Spring 2024

Project Participants

Fred Kafka

Piper O’Neill

Clara Hallgarth

Khalid Ibrahim

Abigael Walker

Cristine Tran

Project Objective

The parking area at the north of campus is planned to be converted into student housing. This area currently experiences an incline which funnels heavy metals, farm refuse, and chemicals into the creek. We took water surveys of the existing problems endemic to the site and provided green infrastructure solutions. These solutions solve 3 major problems: stream pollution, poor circulation, and disconnection between the arboretum and the campus core

Stream Monitoring

Our club and the Cal Poly Water Works Club monitored Brizzolara Creek in order to find its levels of pollution. These findings are necessary for our design as we can pinpoint exactly what to fix using our design. These findings are used by the university as official data for historic creek data.

Lower Brizzolara

Upper Brizzolara

Lower Brizzolara Creek Testing Site

Upper Brizzolara Creek Testing Site

Parking Lot Contamination Pesticide Contamination

GIS Work

Using GIS, I was able to find the topography data. We were then able to transfer this into a program called SWIM which maps flow patterns. We used this data to place buildings who were situated to let water flow unimpeded.

I was then able to bring this contour data into Rhino. I then draped a mesh over the contours, creating a 3D rendering of the site which was used in our isometric.

Rhino Work: Freddy Kafka Photoshop: Piper O’Neill

Merced River Trail

Analysis and Guidelines for Development

Location

Merced County

Instructor Miran Day-Jung

Project Type Group Work

Project Year Fall 2020

Project Participants

Dylan Reeder

Mariella Delfino

Elissa Urbina

Kathleen Dempsy

Fred Kafka Studio LA 402

Project Objective

Mariposa County is planning to build a trail along the Merced River. It’s purpose is to connect the lower lying town of Bagby to the entrance of Yosemite. It will be a multi use trail with pedestrian, bicycle, and community activities. The theme of our design was “Ego to Eco”. It’s purpose was to base our design on ecology, creating an appreciation for the river’s unique biodiversity.

Opportunities and Constraints

These are graphs showing the relationships between the opportunities and challenges of the project. There are 5 components of the relationships: Development, Species Coexistence, Culture, Natural Systems, and Knowledge/ Outreach.

These are graphs showing the relationships between the opportunities and challenges of the project. There are 5 components of the relationships: Development, Species Coexistence, Culture, Natural Systems, and Knowledge/ Outreach.

The Trail

These are suggestions for activities and aspects of the trail. They include natural aspects as well as human interaction with nature.

Gazebo Project

Building a Stage and Gazebo at the Cal Poly Campus

Location

Cal Poly SLO Campus

Project Type

Job

Project Year Spring - Summer 2024

Project Objective

The Cal Poly Arboretum was looking to create an ADA accessible viewing area for a stage and gazebo slated to be built. My class was tasked to design and build the project.

I was then offered a job over the summer to build the stage and gazebo. This was headed by the construction management department using designs from landscape architecture students.

I worked in a team of 3 with oversight from Professor Brian Knakiewicz, and Arboretum Director Tiffany Faulstich. While there I surveyed the site, changed drawings accordingly, then dug holes for the posts, applied aggregate, leveled the sonotubes, poured concrete, and cut supporting wood.

Drawings for the Gazebo

The Gazebo was originally designed by Prof. Ragsdale’s Construction Documents class. But, the designs did not reflect the topographic reality of the site, so the drawing on the right is an updated cross section.

Top Left: Initial Surveying
Bottom Left: Pouring Concrete and Setting Bases
Top Right: Framing

A Collection of Art

Here is a collection of art I have completed over the last couple of years. Art has always been an important aspect of my life.

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Fred Kafka Portfolio by F Kafka - Issuu