CLIENT TYPE: DEVELOPER
GFA: 254,911 SF GFA: SF
STORIES: 14 + C + APT #: 99 UNITS
1-4 FL PODIUM:
RETAIL & COMMERCIAL RETAIL
5-14 FL RESIDENTIAL: 5-14 FL AMENITY & CONDOS
ENVELOPE:
CURTAIN WALL SYSTEM W/ IGU GLASS, SPANDREL GLASS, METAL SPANDREL METAL PANEL, AND INTEGRATED METAL AND INTEGRATED METAL LOUVER
HVAC: AIR-COOLED VRF AC SYSTEM VRF
PROJECT DESIGNER position; responsible for:
PROJECT DESIGNER position; for:
• Phase: CD/ In Responding Ownership’s Comments / Revision Drawings for Bid
• Phase: CD/ In Comments / Revision Drawings for Bid
• Worked closely with the PM/ Job Captain to prioritize tasks Performed Building &
• Worked with the PM/ Job to prioritize tasks. Performed & Zoning Codes and ANSI/ADA standard compliance Managed and guided junior staff Codes and ANSI/ADA standard compliance. and junior staff on daily tasks Ensured design intent alignment with internal façade and interior design on tasks. Ensured intent with internal and interior teams Contributed to design coordination meetings with ownership, engineers, and teams. Contributed to coordination meetings with engineers, and design teams teams.
• Collaborated with design teams (facade, interior, landscape, lighting) to develop
• Collaborated with design teams interior, landscape, lighting) to develop construction details and complete Construction Drawing set for submission, works construction details and Construction Drawing set for submission, works included creating curtain wall schedule with an easy-identified tagged system, enlarged included creating curtain wall schedule with an system, storefront elevation with T O stone/ shelf/ slab, slab edge plans, wall details, MEP & storefront elevation with T.O. stone/ shelf/ slab, slab wall details, MEP & telecom openings throughout envelope, exit signs on egress path, MEP items on plans & telecom openings exit signs on egress MEP items on & RCPs, and stairs & accessible ramp at retail, etc and stairs & accessible ramp at etc.
• Collaborated with the PM/Job Captain in addressing and responding to ownership
• Collaborated with the PM/Job in and to comments on CD sets (all trades) Led the team to review and coordinate MEP drawings comments on CD sets trades). Led the team to review and coordinate MEP with Engineers Revised architectural drawings for bidding and Bulletin issuance with Engineers. Revised architectural for and Bulletin issuance.
• Coordinated details with envelope consultants and engineers for constructability and
• Coordinated details with envelope consultants and engineers for constructability and code compliance code compliance.
PROJECT DESIGNER/ TEAM BIM MANAGER position; responsible for:
PROJECT DESIGNER/ TEAM BIM MANAGER position; responsible for:
• Phase: VE items, Bulletin revisions, and Owner ’ s changes during CA.
• Phase: VE items, Bulletin revisions, and Owner’s CA.
• Worked closely with the PM/ Job Captain to prioritize tasks and revision issuances
• Worked with the PM/ Job to prioritize tasks and revision issuances for construction Collaborated with team members to produce sketches and construc- for construction. Collaborated with team members to sketches and construction details Performed Building & Zoning Codes and ANSI/ADA standard compli- tion details. Performed & Zoning Codes and ANSI/ADA standard ance Managed and guided junior staff on daily tasks ance. and junior staff on tasks.
• Served as team BIM manager, overseeing model deliveries and managing Revit
• Served as team BIM manager, overseeing model deliveries and managing Revit deliverables, including Bulletin revisions, sketches, architectural/structural model deliverables, Bulletin revisions, sketches, architectural/structural model updates, and background issuances Supervised junior staff and maintained office and issuances. junior staff and maintained office graphic standards standards.
• Improved workflow efficiency, and proactively maintained a detailed revision log
• workflow and maintained a detailed revision to prioritize background drawing issuance and track narratives for periodic Bulletin to prioritize issuance and track narratives for Bulletin submissions submissions.
• Coordinated with design teams (facade, interior, landscape), engineers, consult-
• Coordinated with teams interior, engineers, consultants, ownership, and construction team on VE items, RFIs, and design changes for ants, and construction team on VE items, and for construction, such as layout changes, locations of MEP openings and facade details construction, such as locations of MEP openings and facade details.
CLIENT TYPE: DEVELOPER GFA: 530,066 SF GFA: SF STORIES: 17@ N TOWER; 16@ S TOWER N S TOWER APT #: 569 UNITS
@2ND -17TH
• Reviewed and coordinated critical shop drawings, such as curtain wall/storefront/
• Reviewed and coordinated critical shop drawings, such as curtain wall/storefront/ kitchen packages, with vendors, contractor, and ownership kitchen with vendors, contractor, and ownership.
ENVELOPE: PTD MTL PANEL PTD INTEGRATED W/ WINDOW INTEGRATED WINDOW WALL SYSTEM, BRICK WALL W/ WALL BRICK WALL W/ PUNCH WINDOW, EIFS PUNCH EIFS
HVAC: VERTICAL STACK CONDENSER WATER SOURCE HEAT PUMPS
ARCHITECTURAL DESIGNER position; responsible for:
ARCHITECTURAL DESIGNER position; for:
• Phase: DD/ CD/ BID/ DOB FILING & PAAs/ Revisions/ CA
• Phase: DOB FILING & CA
• Collaborated with the Principal and Lead Architect to design and develop key areas, completing DD
• Collaborated with the and Lead Architect to and areas, DD and CD sets for the Front Desk, Staff Supports areas, Cafeteria, Restrooms, and Office floor Created and CD sets for the Front Staff Supports areas, Restrooms, and Office floor. Created detailed electrical outlet plans, furniture layouts, enlarged partial plans, and interior elevations across detailed electrical outlet furniture and interior elevations across multiple floors and zones Coordinated lighting, plumbing, and electrical requirements with the engineers floors and zones. Coordinated and electrical requirements with the engineers and lighting designer and designer.
• Researched, specified, and scheduled a range of materials and FFE throughout the building, including
• Researched, and scheduled a range of materials and FFE the finishes, plumbing, appliances, accessories, and medical equipment Worked closely with the architect to finishes, accessories, and medical equipment. Worked with the architect to finalize finish selections by developing finish boards and color-rendered elevations Prepared presentation finalize finish selections finish boards and color-rendered elevations. presentation and finish boards for ownership review and approval and finish boards for review and approval.
• Worked with the team to complete permit set and energy compliance drawings for obtaining NYC DOB
• Worked with the team to permit set and energy for NYC DOB approval Assisted in resolving objections on Zoning, Energy, and NB items approval. Assisted in on Zoning, Energy, and NB items.
• Coordinated door, hardware, and telecom narratives with vendors to ensure alignment with design intent
• Coordinated door, hardware, and telecom narratives with vendors to ensure alignment with intent and ownership requirements Reviewed and coordinated FFE and electrical shop drawings with layout and requirements. Reviewed and coordinated FFE and electrical with plans and interior elevations across the building Updated drawings and schedules for construction revi- plans and interior elevations across the building. Updated drawings and schedules for construction revision Assisted the team in conducting periodic site observations and participated in on- site OAC meetings sion. Assisted the team in site observations and in on-site OAC meetings.
ARCHITECTURAL DESIGNER position; responsible for:
ARCHITECTURAL DESIGNER position; responsible for:
Salvaged Building Elements Salvaged Building Elements (DEMO & SALVAGED DRAWING SET) & SALVAGED DRAWING
• Documented existing conditions including floor plans, building elevations, and salvaged building elements with a tag-
• Documented existing conditions floor elevations, and elements with a tagging system; completed Architectural Demolition and Salvage drawing set for bid ging system; Architectural Demolition and set for bid.
New Supportive Housing New (DD/ CD/ DOB filings & PAAs/ BID/ VE & REVISIONS/ CA/ AS -BUILT CLOSEOUT ) CD/ DOB & PAAs/ BID/ VE & REVISIONS/ CA/ AS-BUILT CLOSEOUT
• Worked on floor plans, unit layout plans, RCPs, interior elevations, window & wall details, and zoning diagrams
• Worked on floor unit RCPs, interior elevations, window & wall details, and zoning diagrams. Completed schedules by researching and specifying code - compliant plumbing, appliance, lighting fixtures, window, door, schedules and code-compliant lighting fixtures, window, door, and hardware Prepared presentations for Community Board meetings and hardware. presentations for Community Board meetings.
• Collaborated with team mates to complete drawing sets and specifications for construction Coordinated with the team,
• Collaborated with team mates to complete drawing sets and for construction. Coordinated with the team, Engineers, and Green Consultants to revise construction details and specifications to meet Codes, NYSERDA, HPD, and and Green Consultants to revise construction details and to meet Codes, NYSERDA, HPD, and Enterprise Green Communities standards Performed Building & Zoning Codes, NYCECC, and ANSI/ADA standard com- Green Communities standards. Performed & Codes, NYCECC, and ANSI/ADA standard compliance, and completed permit set and energy drawings for obtaining NYC DOB approval, including PAAs Coordinate and permit set and energy for NYC DOB PAAs. Coordinate with in-house expeditor to complete filing documents, such as ZD1, PW1, PW1A/1B, TR8, etc, for NYC DOB approval with in-house to documents, such as ZD1, PW1, PW1A/1B, TR8, etc, for NYC DOB approval.
• Worked with Principal/ PM to prepare addendum issuance, modified drawings & documentation for VE revisions
• Worked with PM to prepare addendum issuance, modified & documentation for VE revisions. Assisted in reviewing Change Orders and preparing Construction Change Directives Assisted in reviewing Orders and preparing Construction Directives.
• Coordinated telecom, door & hardware, and security system narratives with vendors and finalized sketches for owner
• Coordinated door & and security system narratives with vendors and finalized sketches for owner review and construction Reviewed shop drawings, responded to RFIs under supervision, and performed site meetings and review and construction. Reviewed to RFIs under supervision, and site meetings and observations Prepared as -built drawings for closeout submission observations. as-built for closeout submission.
• Directed the photographer on- site to complete professional architectural photographs
AXONOMETRIC DIAGRAM
• Directed the on-site to architectural photographs. CLIENT TYPE: NON PROFIT ORG TYPE: PROFIT ORG.
GFA: 47,628 SF GFA: SF
STORIES: 6, CELLAR STORIES: CELLAR APT #: 78 UNITS APT
SUPPORTIVE HOUSING UNIT @ PARTIAL 1ST, 2-6 FL @ PARTIAL 1ST, 2-6 FL COMMUNITY FACILITY @ 1ST FL & CELLAR LEVEL 1ST FL & CELLAR LEVEL
ENVELOPE: NEW CMU/ BRICK WALL STSTEM BRICK WITH PUNCH WINDOW AND HVAC PTACS SYSTEM
ARCHITECTURAL DESIGNER position; responsible for:
ARCHITECTURAL DESIGNER position; for:
• Phase: DD/ CD/ LPC/ DOB Filings & PAAs/ Revisions/ CA
• Phase: DD/ CD/ LPC/ DOB & PAAs/ Revisions/ CA
• • Worked with the Architect to develop 6th fl addition in plan & RCP, and building wall section
Worked with the Architect to develop 6th fl addition in & and wall section and details A details. Assisted in coordinating MEP designs with the engineer and consultant ssisted in MEP with the engineer and consultant.
• Researched and specified plumbing, appliance, lighting fixtures, window, door, and
• Researched and and hardware on schedules Coordinated with kitchen vendor to finalize layouts, fixtures, and hardware on schedules. Coordinated with kitchen vendor to finalize and finishes per ownership requests finishes per requests.
• Performed Building Code and ANSI/ADA standard compliance Completed permit set
• Performed Code and ANSI/ADA standard compliance. permit set for obtaining LPC/ DOB approval, including multiple PAAs A for obtaining LPC/ DOB approval, including multiple PAAs. Assisted in zoning analysis and ssisted in zoning and obtained CCD1/ ZD1 approval obtained CCD1/ ZD1
• Rreviewed shop drawings, responded to RFIs, and provided sketches with revised layouts
• Rreviewed to RFIs, and sketches with revised and details for construction construction.
CLIENT TYPE: DEVELOPER GFA: 17,569 SF GFA: SF
STORIES: 6, CELLAR STORIES: 6, CELLAR APT #: 9 UNITS
SCOPE:
RECONFIGURATE A 5-STORY A TOWNHOUSE WITH A NEW WITH A 6TH FL ADDITION INTO 9 APT FL UNITS FOR SALE
ENVELOPE: - FRONT/ LANDMARK - LANDMARK REPLACE WOOD WINDOWS AND WROUGHT IRON DOORS DOORS - REAR/ NEWNEW CMU/ BRICK WALL WITH NEW BRICK WALL WITH NEW ALUM WINDOWS AND ALUM. DOORS
PROPOSED WALL ASSEMBLY AT 5-6TH FLOOR (NEW) PROPOSED WALL ASSEMBLY AT 5-6TH FLOOR (NEW)
EXTENDING THE LIVING EXPERIENCE TOWARD NATURE & OCEAN THE & AND CREATING INSIDE - OUT & OUTSIDE -IN LIVING SPACE INSIDE-OUT OUTSIDE-IN
Studio Group Project/ Singal Family House; Acted as the TEAM CAPTAIN: Studio Acted as the TEAM CAPTAIN:
• • Led the team to deliver the project from landscape and architectural spacial development to interior Led the team to deliver the project from and architectural to interior design, including the architectural spacial layout, landscape planning, featured space design development, the architectural featured space design sustainable features and strategies, green materials and finish selections sustainable features and strategies, green materials and finish selections.
• • Contributed to concept development, building mass study, 3D model development, site plan, layout plans, Contributed to concept development, mass 3D model site elevations, and renderings of exterior spaces. elevations, and of exterior spaces.
ZongziisatraditionalChinesefood made withstickyriceandothertastyingredients wrappedinbambooleaves in tapered shape “Bao ZongziinMandarinmeanssuccessful and makesZongziasa food withblessing
Thisexhibitionfeaturesbambooleavesas theprimarymaterialapplied on the shelter Theslightlyroughtexturesmellandeco ,,friendlynaturemakeitanexcellentchoicefor buildingalightweightshelterThismaterialis strongenoughtoweaveeither wetordry