Case Study
FLR GROUP FLOORING
INSTALL
COMPLIANCE
EDUCATION
SPORTS
Introduction English Martyrs Catholic Primary School is an inner city school in the heart of a thriving multi-cultural area.
Project Description
downtime, FLR specified the fast track ‘Eco-Fit’ version of the Gerflor’s world When English Martyrs Catholic Primary renowned Taraflex 6.2mm Multi-Use School contacted us regarding the Sports surface. Designed to be loose replacement of their ageing main hall laid over existing floors, the Eco-Fit floor, the FLR Group were ready to go. system is an economic and fast track Within 48 hours we had carried out a answer site survey, specified various options and quoted the project. This made it Products quick and easy for the client to make • Gerflor Taraflex Multi Purpose an informed decision and instruct the surface with Eco-Fit loose lay works to proceed. backing. Due to the time constraints and the need to minimise disruption and CUSTOMER TESTIMONIAL We are very pleased with our new floor. It is used all day for various activities including early morning breakfast club as well as assemblies, dinner time, PE and a variety of other functions. The floor looks good at all times and we are delighted with it. Diane Mealey English Martyrs Catholic Primary School