Case Study
FLR GROUP FLOORING
INSTALL
Introduction Complete installation of flooring to Headlam plc’s new prestige head office.
Project Description Having carried out their previous installation, the Headlam Group asked FLR Group to install all the flooring products on their new multi million pound state-of-the-art headquarters at Coleshill. Working in conjunction with both Andy Lakin the project manager from Headlam and designer Chris Orton of Thuja Design, the installation was completed to a ‘fast track’ and demanding programme. Intricate pattern work along with complex setting out only added to the overall challenge of completing the works on time. Our dedicated teams worked
straight through the Christmas period, stopping only to open presents, to ensure target dates were achieved.
Products
• Interface Carpets including Monochrome, Equilibrium, and Chenille Warp • Swiss wood engineered wooden flooring. • Shaw Carpets ‘Edge’ range of carpet tiles. • Polyflor - Pearlazzo vinyl and Expona LVT • VC Ltd - vinyl sheet and logos • Gradus Ltd - matting
Result; a great showcase installation for both Headlam and the FLR Group. Well done to all the team. Gary Lloyd Technical Director FLR Group