Local Government Capability Statement & Brochure

Page 1

Enhancing community facilities with modern modular solutions.

Fleetwood’s Local Government capability statement.

Acknowledgement of Country

Fleetwood Australia acknowledges Traditional Owners of Country throughout Australia and recognises the continuing connection to lands, waters and communities. We pay our respect to Aboriginal and Torres Strait Islander cultures; and to Elders past and present.

The artwork on this page is by Garry Purchase, an Indigenous man from Sydney’s Eastern suburbs. His modern take on Aboriginal art depicts Fleetwood Australia as a meeting place, symbolising the company’s connection to remote regions. This artwork was created by Gary in May 2022 as part of Fleetwood’s Reconciliation Action Plan (RAP). Our RAP is a commitment to creating a culturally safe workplace for Aboriginal and Torres Strait Islander peoples. As an Australian company with a history in family business, we’re extending our efforts to support remote and urban communities through building and accommodation solutions.

2
Artwork by Garry Purchase (Dharawal, Bidjigal and Dhungutti)

Modern modular solutions for thriving communities

60 years of helping build a brighter future for all Australians.

At Fleetwood, we understand that local governments across Australia are facing multiple challenges. From affordable housing and robust infrastructure to shifting demographics and environmental sustainability, all amidst tight budget constraints.

That’s why our modern modular buildings offer a future-proof solution, providing tailored builds that meet present needs but are adaptable enough to shift and evolve with the demands of tomorrow. With over 60 years of experience, our diverse offerings include housing, sport and recreation facilities, offices, amenities and ablution blocks, as well as childcare, classroom and learning facilities.

We’re proud to offer solutions that are:

• Fit-for-purpose: Tailored to meet the unique needs of your community.

• Future-ready: Versatile and adaptable, evolving with future demands.

• Cost-effective: Our modular approach ensures projects are completed fully, on time and within budget.

• Fast: Rapid construction, built and delivered 50% faster than traditional methods.

• Durable and sustainable: Our construction methods produce lower greenhouse emissions and waste.

• Minimal disruption: Noise, traffic and overall impact to local communities is minimal, thanks to offsite construction.

Our aim is to not just build structures, but to enhance your community in a meaningful way. We believe in fostering resilience through close collaboration with stakeholders by building a stronger community together.

3

About Fleetwood

With over 60 years of industry expertise, we’ve emerged as leaders, renowned for our commitment to innovation, quality and reliability. Our comprehensive portfolio encompasses the entire spectrum of modern modular solutions, from initial design to offsite manufacture, civil site works, transportation, installation, relocation, refurbishment, decommissioning, maintenance, operations and storage.

We’ve collaborated closely with both private and public sector clients to deliver a broad range of projects across multiple sectors, including:

• Government

• Defence

• Education

• Commercial

• Custodial

• Build Own Operate

• Health and Aged Care

• Multi Residential

• Tourism

• Mining and Resources

4

60 years experience

ASX listed since 1987

Australian owned and operated Nationwide manufacturing facilities Largest offsite manufacturer

5

Why Fleetwood?

How we deliver modern modular solutions crafted for the next generation.

Cost-effective

Our modern modular approach ensures projects are completed fully, on time and within budget. Clients benefit from architecturally designed buildings at scale, without the high price tag. With customisable finishes, they can tailor their preferences to their budget from the outset. Plus, our streamlined manufacturing process minimises waste and labor, resulting in significant cost savings.

Customisable community-centric designs

Our in-house design team adopts a dynamic and flexible approach, ensuring that building designs are meticulously crafted to meet the unique needs of each community. This includes creating bespoke fittings and fixtures that resonate with the local area, as well as addressing accessibility requirements to ensure equal access for all citizens. Our brick facades also allow for the seamless integration of new modular builds with the look and feel of older existing buildings in your community.

Faster Construction

2
1 Source: McKinsey & Company Modular construction: From projects to products, June 2019 1 2 3 4 Offsite manufacturing 3D volumetric 1 3 2 4 Planning and design Foundations Onsite construction Construction over-run Traditional 3 Site set up Handover 6 9 Traditional construction Planning and design Offsite manufacturing Foundations On site installation In-house architects expedite upfront design process, design phase shortens as designs are repeated Offsite manufacture begins in parallel with foundations Enhanced productivity in factory allows fast module build 20 – 50% faster Fast assembly because no MEP and finishing personnel required months
6

3

Flexibility and adaptability

Our modular buildings offer unparalleled adaptability, easily expanded, reduced, or repurposed, providing flexibility to meet evolving needs. Our versatile solutions, transportable and flexible, can swiftly accommodate the changing requirements of your project and workforce anywhere in Australia. From community centers to healthcare facilities, modular buildings cater to diverse needs, making them an ideal choice for local governments tackling various infrastructure demands.

Durability and quality

By constructing in a controlled environment, we achieve higher quality buildings that adhere closely to standards. Through Inspection Test Reports and rigorous quality assessments, we ensure compliance and top-notch workmanship throughout both manufacturing and installation phases. Our in-house designed buildings are certified by structural engineers, tailored to meet diverse Australian conditions such as extreme heat, coastal settings, bushfire-prone areas and cyclonic wind regions. 4

5

Greener building methods

Committed to sustainability, we employ eco-friendly materials and energy-efficient systems, minimising energy consumption and carbon emissions throughout construction and operation. Our modular approach integrates sustainable design elements like green roofs, solar panels and rainwater harvesting systems, amplifying our efforts to reduce the environmental footprint of our buildings.

6

Reduced community impact

Our innovative methods drastically minimise noise, disruptions and adverse impacts on communities, ensuring a seamless building process. Unlike traditional construction, which involves extensive on-site activity, modular construction takes place in a controlled factory setting, reducing noise, dust and other disturbances. Our modules are then swiftly transported and assembled on-site within days or weeks, minimising disruptions and inconvenience in the local community. This approach enhances safety, hygiene and comfort for users while reducing overcrowding on-site.

Australia-wide solutions

Ideal for regional and remote areas, our modular construction process excels in overcoming logistical hurdles. By crafting buildings off-site, we streamline the installation process. By transporting the buildings from the factory to their designated locations we eliminate the need for a large on-site workforce, ensuring a swift and seamless installation.

7
7

World-renowned for our craft

With 20 global awards under our belt, our commitment to quality, innovation and customer satisfaction is stronger than ever. Our achievements have gained recognition from both industry experts and satisfied clients, acknowledging our exceptional quality, innovation and design in every project.

2024

Modular Building Institute (MBI) Honorable mention

• Best Permanent Modular Education over 10,000 square feet (Our Lady’s Primary School)

2023

Modular Building Institute (MBI) Winner

• Best Permanent Modular Education over 10,000 square feet (Mackenzie State Special School)

• Best Permanent Special Application over 10,000 square feet (Sydney International Speedway)

• Honourable Mention – Permanent Modular Assembly (Albert Park Pavilion)

• Honourable Mention – Permanent Correctional (Corrections Victoria Prison Infill Expansion)

2022

Modular Building Institute (MBI) Winner

• Best of Show Green Building (Legacy Living Lab L3)

• Best Permanent Education over 10,000 square feet (Barramurra Public School)

• Best Permanent Modular Correctional (NSW Justice Infrastructure Prison Infill)

• Best Permanent Modular Assembly (Spencer Pavilion)

• Best Relocatable Modular Assembly (Westrac End of Trip Facilities and Changeroom)

2020

Modular Building Institute (MBI) Winner

• Best Permanent Modular Education Facility over 10,000 square feet (Frankston Heights Primary School)

• Best Permanent Modular Education Facility under 10,000 square feet (Moe South Street Primary School)

• Best Permanent Modular Education Facility under 10,000 square feet (Fairfield Primary School)

• Best Relocatable Modular Education Facility over 10,000 square feet (Carey Baptist Grammar M-Link Building)

2021

Modular Building Institute (MBI) Winner

• Best Relocatable Office over 10,000 square feet (Parramatta Eels Head Office)

Our success relies on our exceptional team, client partnerships, and community.

These acknowledgements are a testament to our ongoing dedication to innovation and quality.

8

Standard solutions for all community

needs.

Explore our range of prefabricated builds that can be customised for your communities needs.

9

Standard multiuse modular buildings

Multiuse Buildings

Our multiuse areas are adaptable and able to be used for a variety of purposes. Various sized sections can be grouped together or stacked easily as per your requirements:

Some recent examples include:

• Prayer room

• Inwards good centre

• Admin office

• Meeting room

• Training room

• Briefing room

10

Standard amenity facilities

1 A B 8860 GENERAL NOTES LTANTS DOCUMENTATION. TTEN INSTRUCTION. information, ideas and concepts are the property Fleetwood Autodesk Docs://FWD_Standard Offer Projects_R2022/JXX01_01 MALE_FEMALE_ACCESS AR_R22.rvt DEPARTMENT OF EDUCATION AND EARLY CHILDHOOD NO. DESCRIPTION 1 A B 2 3600 8400 FEMALE TOILET MALE TOILET A B Specifications 8.4m x 3.6m Accessible toilet Female and male toilets Specifications: 8.6m x 4m Accessible toilet Female and male toilets
11
SPECIFICATION 8m x 4m plus ramps Accessible toilet Unisex toilet Female and male toilets 8x4 Custom
compliant toilet block B C 1 2 A 3930 VERANDAH 13 m² FTM-02 m² AMBULANT STAFF FVI m² STUDENT WC 1 FVI 2 m² STUDENT WC 2 FVI 11 m² UNISEX ACC WC FVI OVERALL LENGTH 8148 m² CLEANERS ROOM FVI UP UP UP RAINWATER TANK DRAWING NO. SHEET CHECKED DRAWN GENERAL NOTES ALL DIMENSIONS TO BE VERIFIED ON SITE PRIOR TO COMMENCEMENT OF WORKS. USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE DRAWINGS. READ IN CONJUNCTION WITH OTHER DRAWINGS, SPECIFICATIONS CONSULTANTS DOCUMENTATION. REFER ANY DISCREPANCIES IMMEDIATELY TO THE DESIGNER AWAIT WRITTEN INSTRUCTION. This document and any the documents information, ideas and concepts are the property of Fleetwood Australia and may not be used, copied or reproduced without express written permission. Copyright Fleetwood Australia. rights reserved. ABN: 78 114 678 349 PROJECT: PROJECT ADDRESS PROJECT CLIENT DC SIGN OFF: PROJECT STATUS PROJECT NO.: C:\Users\MariliaC\OneDrive Fleetwood Corporation Ltd\Documents\J004028_Lake Wangary PS Toilet_B1_AR_non conforming_R22_detached.rvt MARKETING PLAN A00.04 MC Checker KAPUNDA HIGH SCHOOL TOILET BLOCK DEPARTMENT FOR EDUCATION AS BUILTS WEST TERRACE, KAPUNDA SA 5373 J003252 NO. DESCRIPTION DATE BY CHK'D ISSUED FOR CONSTRUCTION 03/08/22 AS KJ 12
DDA
13

Housing

From cosy one-bedroom apartments to spacious four-bedroom homes, we build affordable housing that focuses on quality, innovation and sustainability to foster thriving communities.

Features

• 600mm European appliance package

• Reverse cycle air conditioning

• Internal wall painting

• Quality floor coverings

• Window treatments

• Internal and external light fittings

• Stylish bathroom

• Fully insulated to comply with energy efficiency ratings

• Delivery options available

2 1 A B M O D U L E 1 14400 MODULE 1 4800 BEDROOM 2 BEDROOM 1 WC BATH
ALFRESCO
ROBE 2.6m X 3.0m 2.6m X 3.4m 2.7m X 3.4m 1.9m X 5.8m 0.9m X 2.0m 1.9m X 1.8m 2.4m X 3.1m LINEN DINING HALLWAY 2.2m X 3.1m 0.9m X 3.4m LIVING KITCHEN BH @2200MM 1 50 A02-FP01 FLOOR PLAN 2 1202 Abernethy Rd, Perth Airport WA 6105 (08) 9281 7500 1 : 50 A02-FP01 FRONT ELEVATION 1 AREAS ROOM NAMEAREA ALFRESCO7 m² BATH3 m² BEDROOM 19 m² BEDROOM 29 m² DINING7 m² HALLWAY3 m² KITCHEN11 m² LIVING9 m² WC 2 m² TOTAL 60 m² SLAB = 14.4m x 4.8m CEILING HEIGHT @ 2410mm UNLESS OTHERWISE NOTED
ROBE
14
15

Large amenities complex

Commentator

DRAWING PRINTED IN COLOUR ANY FORM OF REPRODUCTION OF THIS DRAWING FULL OR IN PART WITHOUT THE WRITTEN COPYRIGHT COX ARCHITECTURE PTY LTD PERMISSION OF COX ARCHITECTURE PTY LTD CONSTITUTES AN INFRINGEMENT OF COPYRIGHT Drawing Title Client Project Document Control Status: Project No. A1 DRAWING SHEET www.coxarchitecture.com.au Cox Architecture Scale: Co-ordinated: Drawn: Drawing Number: Revision: Project Architect: Project Director: Date: North: Modular Building Systems A Fleetwood Building Solutions business NSW 2164 Percival Road, Smithfield 0 0m 1: 20 @ A1 C TfNSW Western Sydney Parklands SYDNEY SPEEDWAY COVER SHEET AM-01-00 200839 ISSUED FOR APPROVAL KL 30/04/2020 DT DT SYDNEY SPEEDWAY WESTERN SYDNEY PARKLANDS 19163.00 Rev Description ByDate AIssue For Construction DT12.01.2021 BAdded rooms data, revised layout DT03.05.2021 CAMENDED DETAILS KM24.06.2021 DRAWING PRINTED IN COLOUR PERMISSION OF COX ARCHITECTURE PTY LTD CONSTITUTES INFRINGEMENT OF COPYRIGHT Drawing Title Client Project Document Control Status: Project No. A1 DRAWING SHEET PLOT STAMP DATE: www.coxarchitecture.com.au Cox ArchitectureDrawing Number: Project Architect: Project Director: 2/07/2021 1:50:51 PM TfNSW Western Sydney Parklands SYDNEY SPEEDWAY COVER SHEET CM-00-14 200839 ISSUED Designer Approver SYDNEY SPEEDWAY WESTERN SYDNEY PARKLANDS 19163.00 Rev Description ByDate AIssue For Construction DT12.01.2021 BAMENDED DETAILS KM02.07.2021
Specifications
Ticket booth Admin Office Food Outlets
Grandstand
platform 16
17

Gymnasium

Customisable to your needs

SIDING RD, TAMWORTH NSW 2340 TYPE C INFORMATION: DRAWING REGISTER 18

Changeroom and canteen

Customisable to your needs UP UP UP 1 2 3 4 5 6 7 8 A C D 1 A09.00 1 A09.00 W01 103.1 W01 105.1 W01 106.1 W01 107.1 D03 101.1 D01 102.1 D01 102.2 D01 104.1 D04 104.2 D01 107.1 30 m² STORE 101 30 m² CANTEEN 102 12 m² SHR & WC1 103 51 m² CHANGE ROOM 1 104 51 m² CHANGE ROOM 2 107 D02 102.4 D02 102.3 1800 90 6220 180 6220 180 6220 90 90 4819 90 4820 90 1800 90 11320 90 90 1500 90 9730 90 MODULE 1 1800 MODULE 2 3200 MODULE 3 3200 MODULE 4 3200 MODULE 5 3200 MODULE 6 3200 MODULE 7 3200 21000 1800 11500 90 6310 90 12620 90 13300 RDP RDP RDP RDP RDP W02 104.1 W02 104.2 W02 107.2 W02 107.1 BHS-01 W01 111.1 W01 111.2 W01 104.3 W01 107.3 W01 102.2 W01 102.1 12 m² SHR &WC2 106 NOTE ALL STAIRS, RAMP & CONCRETE 1500 1500 m² CLEANER/ STORAGE 109 m² ACC WC 108 D01 108.1 D01 109.1 90 2400 90 6791 90 1949 90 W01 109.1 W01 108.1 1:14 1:14 RAMP 9000 2000 RAMP 3600 LANDING 1700 LANDING 1700 PROJECT: PROJECT ADDRESS PROJECT CLIENT PROJECT STATUS PROJECT NO.: LEICHHARDT OVAL NO. 2 AMENITIES 2 GLOVER AVENUE, LEICHHARDT NSW 2040 INNER WEST COUNCIL PRELIMINARY J005017 19

Case studies

Examples of our recent work in the education sector.

20

Maroondah City Council Administration Building, VIC

Double-storey architecturally designed office space.

• We delivered a full turnkey solution, including a new double-storey permanent modular building (13 modules) and various associated site works, all completed within a 12-weeks.

• Supplied and installed a new permanent modular building in Melbourne’s NorthEastern suburbs.

• This project marked the first stage of a series of works for the council.

Scan to read more about this project. 21

Spencer Pavilion, VIC

Multi-purpose, double-storey sports complex.

• A 26 module, double-story complex totaling 916 square meters, with change rooms, storage, modern entry foyer, lift, kitchen, meeting room, offices and first aid/trainer’s room.

• Construction completed in 11 weeks on-site despite challenges like soil contamination.

• Offsite construction ensured delivery before the sporting season, with minimal disruption, offering a comfortable and adaptable space for players and staff.

Scan to read more about this project. 22
23
24

Osprey Village, WA

293 dwelling worker accommodation and community living.

• Collaboration with the Housing Authority and Royalties for Regions, Fleetwood delivered a full turn-key solution in Port Hedland.

• Comprising of 293 dwellings, offering affordable, high-quality housing and has been managed by Fleetwood since 2014.

• Completed within 9 months, the village features one, two and three-bedroom houses, along with community amenities like parkland BBQ areas, playgrounds, fully maintained gardens, CCTV security and on-site management. Catered to various needs, including those of the elderly and people with limited mobility.

Scan to read more about this project.

25

Parramatta Eels Head Office and Training Facility, NSW

Elite new training facility and admin building.

• Designed, manufactured and installed a 2,100m² head office and training facility for the Parramatta Eels Rugby League.

• The modular build is part of the larger Parramatta Eels Community Facility, housing various team resources and amenities.

• Early client engagement and 3D virtual design technology were employed to ensure collaborative vision alignment and design refinement. Including a purposebuilt 500m² gym with specific features like concrete floors and high ceilings.

Scan to read more about this project.

26
27
28

Sydney Roosters Headquarters, NSW

First-class administration and training facility.

• The double-storey modular facility spanned 1500 sqm adjacent to Allianz Stadium for the Sydney Roosters in 2019.

• It provided a temporary home during the Allianz Stadium redevelopment and minimised disruption to club operations with fast, offsite construction.

• The facility included a reception, gym, medical rooms and player lounges.

Plus, a spacious ground-floor gym with a concrete slab and an upper-floor office area, conveniently accessible via both internal staircase and lift.

Scan to read more about this project.

29

WesTrac End-of-Trip Facilities,

WA

New change room facilities for staff.

• Partnered with WesTrac to create end-oftrip (EOT) and ablution facilities at their WA head office, encouraging staff to consider greener commutes.

• Despite challenges posed by the site’s sloping terrain, we designed a facility that seamlessly integrates with WesTrac’s existing structures and aesthetic.

• New facility features modern amenities, including lockers, showers and bike racks, enhancing workplace satisfaction, promoting healthier habits and reducing parking demand.

Scan to read more about this project.

30
31
We’re ready to be your trusted partners in delivering modular solutions that enhance your community. Thank you for your time. For further details please contact: e sales@fleetwood.com.au t 1300 123 272

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.