Prepared by:
Primary Intersection_ Looking Northwest 1112 Pearl Street. Boulder CO, 80302 TEL
303 447 8202
FAX
303 440 7096
Commartsdesign.com Stantec.com
IdeaPak
The Shops at Perry Crossing: #200102949 PROJECT
Poag Shopping Centers OWNER
SE, KH, JW TEAM
Original: 2014 March 13 Revisions: 1
25% ID_ 2014 March 13
2
50% ID_ 2014 March 28
3
95% ID_ 2014 April 25
4 5
DO NOT FABRICATE DIRECTLY FROM THESE DRAWINGS: These drawings are for the sole purpose of expressing visual design intent only and are not intended to be used for actual fabrication purposes. Fabricator/contractor accepts total responsibility for materials selection, dimensions, engineering, fabrication and installation. COPYRIGHT RESERVED The copyright to all designs and drawings are the porperty of Stantec. Reproduction or use for any other purpose than that authorized by Stantec is forbidden.
Primary Intersection
Architectural Editing -Remove most egregious metalwork throughout property that isn’t contributing functionally or experientially.
Architectural Editing -Strategically alter existing trellises to provide meaningful shade and uplight “catchment”- paint warm colors in the process.
Warm Up Architecture -Strategically paint existing architecture that is “cold,” “heavy” or simply in need of paint.
20