SOUTHGATE HOME

2017 - 2019

Private client

Extension and Renovation of private Victorian terraced home.

RIBA Stages 2-6

DELHI NOIDA INTERNATIONAL AIRPOR T

2020 - 2021

Client: Noida International Airport Limited (NIAL)

The design of a modern, innovative and green new airport in India

RIBA Stages 2-4

BERMONDSEY HOUSING SCHEME

2021

Client: Southwark council

Design Competition for £29 million housing project

RIBA Stage 2

LAX BERGEN

2021

Client: Bergen Municipality

Masterplanning competition for shipyard in Bergen

RIBA Stages 2

SOUTHWARK ROOFTOP HOUSING

2021-2022

Client: Southwark council

Additional Rooftop homes to existing council block and new infill blocks, new landscaping

RIBA Stage 2-3

HS2 LONDON EUSTON STATION

2022

Client: HS2 Ltd (Government led company)

London terminus station at Euston for HS2, bringing services to the heart of the capital.

RIBA Stages 3

MUSEUM OF LONDONGENERAL MARKET BASE BUILD

2022 - Present

Client: Museum Of London

Design for new Museum of London

RIBA Stages 4-5

MUSEUM OF LONDONEXHIBITION DESIGN

2022 - Present

Client: Museum Of London

Design for new Museum of London Exhibition for our time

RIBA Stages 2-3

SELECTED PROJECTS

Architectural Assistant Part II

Asif Khan Ltd

2022-2023

Programmes Used:

Model/ Drawings - Revit/ Rhino

Rendering - Enscape

Editing - Photoshop/illustrator/indesign/ Keynote

Museum of London Sector:

Cultural

RIBA Stages 2-5

The current home to the museum of London closed its doors to the public in December 2022 for the preparation to move to a new premise in 2024/2026. The proposal for the new museum is located at Smithfield Markets and includes the site of the General Market (vacant), the Poultry Market and the annex building.

My role was within the basebuild team and Our time exhibition fit out team. I was responsible for detail drawings in revit, design and research of certain areas of the exhibition fit out.

00 FFL +13960.00 0M FFL +17000.00 01 FFL +17690.00 02 FFL +22000.00 W16 W15 W14 EQ EQ EQ FFL to Ceiling soffit 3550 TBC on site 7940 AHU as per MEP engineer specification Cantilevered glass used for performance platform. Not for public use Door frame-backpainted glass as per specialist specification Fixed glazing Door frame Silicone joint as per specialist specification Lord Mayors Coach (dotted) Base channel to glazing Door frame -Capping as per specialist specification Balustrade Height 1100 Capping channel Base channel to balustrade 915 915 WS.EX.GM.OT.WS.3 WS.EX.GM.OT.WS.4 WS.EX.GM.OT.WS.2 Project Drawing Drawn Date Drawing Location All levels are All dimensions drawing. Asif drawings and To be read specification, acoustic/ security Project Originator Asif Khan Ltd. 24-28 Pritchards London E2 9AP Phone +44(0)20 Email 300@asif-khan.com www.asif-khan.com 300 AKL Survey Note: Information the last models 21423-Museum Some assumed drawings where out, information aspects of the The survey models have subsequently producing 2D responsibility Museum GM -Internal Coach 02 FI 27/03/23 1 25 1 Internal Elevation -Lord Mayors Coach 01 RevisionDateDescription P01 Museum of London [2022 - 2023]
F1 F1 F1 W16 W15 W14 WS2 EQ EQ EQ 3 77110 2660 2660 Lord Mayors Coach Curved fixed glazing as per specialist specification To be confirmed on site 7940 Door Frame as per specialist specification Door joint: mid leaf division 850 850 To be confirmed on site 4430 Glazed door as per specialist specification TBC on site 915 TBC on site 915 Floor box for power and data Face of chimney Centre of Existing Column WS.EX.GM.OT.WS.3 WS.EX.GM.OT.WS.2 W14 WS2 AHU 1600 4200 EQ EQ Glazed balustrade used for performance platform. Not for public use AHU as per MEP engineer specification 850 Platform access 1200 WS.EX.GM.OT.WS.4 All levels are in metres above Ordnance Datum. All dimensions should be checked on site. Do not scale from this drawing. Asif Khan Studio to be advised of any variation between the drawings and site conditions. To be read in conjunction with: architectural drawings and specification, structural and services engineers information, and fire acoustic/ security strategies. Survey Note: Information has been based on survey information provided up until July 2019, with the last models being 21423-Museum of London_Basement_phase3_rev1 and 21423-Museum of London_GM_phase3_rev1. Some assumed information has been drawn from earlie survey and historic drawings where possible but this is unconfirmed. Where surveys have been carried out, information is not complete with large amounts of assumed material. Some aspects of the existing building therefore may not be shown accurately. The survey models provided by Murphy Surveys are in Revit version 2017. These have subsequently been upgraded to Revit 2023 by the Design Team for use in producing 2D drawings. Due to the upgrade process he Design Team accept no responsibility for the accuracy/ validation of the digital data supplied. 1 25 1 GF Plan -Lord Mayors Coach
Used: Model - Rhino Rendering - enscape Editing - Photoshop Left: Lord Mayors Coach Plan Right: Display design Bottom right: Lord Mayors Coach Museum of London [2022 - 2023]
Programmes

Architectural Assistant Part II

Haptic Architects ltd

2021-2022

Programmes Used:

Model/ Drawings - Revit

Rendering - Enscape Editing - Photoshop/illustrator/InDesign

Southwark Rooftop Housing

Sector: Residential RIBA Stages 2-3

The initial proposal is to create 45 new homes for local residents. 27 new rooftop homes by adding 1 storey to each of the proposed blocks. An additional 18 flats can be created by infill opportunities.

My role was within the Haptic lead designers team and I was responsible for detail drawings in revit and massing and design. I was responsible for correspondence with various consultants and leading meetings and site consultation. I also had the responsibility of training a Part I with revit.

Top left: Entrance render

Top : Front Elevation

Right: Bin and cycle study

Bottom: GF GA Plan

Architectural Assistant Part II

Haptic Architects ltd

2020-2021

Programmes Used:

Model/ Drawings - Revit

Rendering - Enscape

Editing - Photoshop/illustrator/indesign

Delhi Noida International Airport

Sector: Aviation

RIBA Stages 2-4

Delhi Noida International Airport will be built in Jewar, 25 miles south of Delhi, by developer Zurich Airport International. It is to be India’s greenest airport. My role was within the planning team of the overall airport and I was responsible for detail drawings in revit, design of smart units and overall terminal planning.

stack on top of each other and be supported by brackets back to cladding. Screen panels to align with the 1.5m cladding system joints behind.

Jaali brackets and fixing details shall be coloured to match the panel. 15mm steel plate brackets to support screen either side and be coordinated with shadow gap of backing cladding panel to prevent visible fixings through the panel. Secret fixings shall be used in the construction of the aluminium profiled 'jaali' to achieve seamless appearance.

No secondary systems (ICT, signage etc) shall be fixed to any part of the 'jaali system.

Refer to Section XXX in Scheme Design Report YI-MA-T1-DS-AR-DES-0004 -Interior Design report for further details.

Office block column panel

PPC pressed metal panel channels shall be used at nterfaces with columns; set out as defined on the drawings. Joints within PPC channels shall be seamless and set out to align with 'jaali' pattern junctions. Channel to incorporate solid acoustically insulated backing panel to enable partition wall to be provided as required.

Panel to incorporate cut-out around primary column bracket to enable movement. Face of panel to be set-out 200mm from face of column for movement.

Office block 'Jaali screens' closing panels

Perforated hinged panel to be provided at top and bottom of screen to close off the void; colour to match screen. Contractor to design top panel to take weight of person for access and maintenance. Access to top panel to be enabled via lanyard system back integrated to perimeter balustrade. Integrated lighting to be provided behind the screen located above and below the perforated panel respectively as set-out in the drawings and specified in the Studio Fractal drawings and report.

Media screens and displays

Media screen to be comprised of LED or LCD screens with a 16:9 aspect ratio to fit within the formed opening.

Media screen to fit within the framed opening.Supplier to provide aluminium perimeter frame;20mm thick colour to match jaali screen. Supplier to provide infill panels as required.

Media screens shall have bezels of no greater than 5mm to ensure seamless appearance and interface joints shall be a maximum of 20 mm to allow screen removal. Contractor to provide fixings of media screen to backing substrate and account for deflection and tolerances with jaali screen to ensure consistent shadow gaps and level setting out

MEP perforated screen

Perforated screen to be provided around the MEP ductowork. Screen to comprise PPC aluminium perforated panels, colour anthracite; fixed back to vertical PPC steel wind posts connected to office block lid and restrained a top at primary roof truss.

Vertical recess joints to be minimum 15mm with secret fixings. Panels to be hinged to enable access to MEP ductwork behind.

Vertical recess joints to be minimum 15mm with secret fixings. Panels to be hinged to enable access to MEP ductwork behind.

Radiused corners shall be complete radiused panels to provide a smooth, seamless radius. Vertical joints to be on orthogonal

H H 3 ZZ 00915 5100180026253375 150015001500150015001500150015001500150015001500 +13.600 +20.500 +25.300 PL2 ZZ - 00915 1 2 1800 2625 2175 1200 5100 7800 WF-01 WT-15 CL-01 1500 1500 1500 1500 1500 1500 1500 1500 +13.600 L2 +20.500 L3 +25.300 1 2 1800 2625 3375 7800 5 ZZ-00914 CL-01 WT-15 WF-01 WF-01 3 Contractor to provide optional price for providing jaali screen on north facade H-F H-06 ZZ - 00915 1500 1500 1500 1500 1500 1500 50175850 1075 WT-15 WT-07 General For coordination principles and illustrations of Design Intent for Interior Design elements refer to Scheme Design Report YI-MAT1-DS-AR-DES-0004 -Interior Design. Cladding system Office block cladding to be 1.5m wide PPC aluminium panels to be supported from steelwork substrate. Vertical recess joints to be minimum 15mm with secret fixings. All joints shall be consistent and no joints shall exceed 50mm and any exposed fixings shall be PPC to match panels. Radiused corners shall be complete radiused panels to provide smooth, seamless radius. Vertical joints to be on orthogonal faces only. Fascia panel to return top and bottom to form parapet and interface with ceiling with integrated stainless steel shadow gap. On North facade around primary column, cladding to be curved to enable uniform offset around the column to connect to Lshaped retail volume. Curtain walling Curtain walling to comprise 10mm HS 1.52mm SGP + 10mm HS laminated glazing panels; connected top and bottom via stainless steel channels. Bottom channel to be fixe to substrate and have integrated150mm stainless teel skirting. Top channel to be recessed in ceiling and incorporate eflection head. Glazing panes to abut seamlessly with structural silicon joints. Glazing to be set-back 150mm from the face of the cladding. Aluminium PPC profile to be provided to connect glazing to partition wall where required. Office block 'Jaali screens' Feature 'jaali' screen comprised of equilateral triangular components fabricated from 100x20mm hollow aluminium rectangular sections with mechanical fixings hidden with front caps. Screens to be formed of 3m typical and 2.1m edge panels with 20mm perimeter frame; factory formed for assembly on site. Panels to stack on top of each other and be supported by brackets back to cladding. Screen panels to lign with the 1.5m cladding system joints behind. Jaali brackets and fixing details shall be coloured to match the panel. 15mm steel plate brackets to support screen either side and be coordinated with shadow gap of backing cladding panel to prevent visible fixings through the panel. Secret fixings shall be used in the construction of the aluminium profiled 'jaali' to achieve a seamless appearance. No secondary systems (ICT, signage etc) shall be xed to any part of the 'jaali system. Refer to Section XXX in Scheme Design Report YI-MA-T1-DS-AR-DES-0004 -Interior Design report for further details. Office block column panel PPC pressed metal panel channels shall be used at nterfaces with columns; set out as defined on the rawings. Joints within PPC channels shall be seamless and set out to align with 'jaali' pattern junctions. Channel to incorporate solid acoustically insulated backing panel to enable partition wall to be provided as required. Panel to incorporate cut-out around primary column bracket to enable movement. Face of panel to be set-out 200mm from face of column for movement. Office block 'Jaali screens' closing panels Perforated hinged panel to be provided at top and bottom of screen to close off the void; colour to match screen. Contractor design top panel to take weight of person for acces and maintenance. Access to top panel to be enable via lanyard system back integrated to perimeter balustrade. Integrated lighting to be provided behind the screen located above and below the perforated panel respectively as set-out in drawings and specified the Studio Fractal drawings and report. Media screens and displays Media screen to be comprised of LED or LCD screens with a 16:9 aspect ratio to fit within the formed pening. Media screen to fit within the framed opening.Supplier to provide aluminium perimeter frame;20mm thick colour to match jaali screen. Supplier to provide infill panels as required. Media screens shall have bezels of no greater than 5mm to ensure seamless appearance and interface joints shall be maximum of 20 mm to allow screen removal. Contractor to provide fixings of media screen to backing substrate and account for deflection and tolerances with jaali screen ensure consistent shadow gaps and level setting out MEP perforated screen Perforated screen to be provided around the MEP ductowork. Screen to comprise PPC aluminium perforated panels, colour anthracite; fixed back to vertical PPC steel wind posts connected to office block lid and restrained top at primary roof truss. Vertical recess joints to be minimum 15mm with secret fixings. Panels to be hinged to enable access to MEP ductwork behind. Vertical recess joints to be minimum 15mm with secret fixings. Panels to be hinged to enable access to MEP ductwork behind. Radiused corners shall be complete radiused panels to provide smooth, seamless radius. Vertical joints to be on orthogonal faces only. Balustrade and planter Balustrades and handrails are to be fabricated from perimeter flat frame and welded steel flats at 50mm dimensions. Balustrade to be at 1.5m centres to match awning and cladding panels. Handrail bases to be at regular centres bolted to rimary structure below floor finish and covered. Balustrades to be welded internally to stringers. All welds shall be ground down to achieve flush seamless finish. m high; to be formed out of PPC metal trough; face to be aligned with front 200 Office screen and glazing (north) key elevation 2 50 Office screen and glazing (north) Elevation 3 50 Office screen and glazing (north) Section 4 Office screen and glazing (north) axo 5 50 Office Screen and glazing (North) plan 1 H H ZZ 00915 5100180026253375 150015001500150015001500150015001500150015001500 +13.600 L2 +20.500 L3 +25.300 L4 PL2 ZZ - 00915 1 2 1800 2625 2175 1200 5100 7800 WF-01 WT-15 CL-01 1500 1500 1500 1500 1500 1500 1500 1500 +13.600 +20.500 +25.300 F PL2 1800 2625 3375 7800 ZZ-00914 CL-01 WT-15 WF-01 WF-01 Contractor provide optional price for providing jaali screen on north facade H-F H-06 ZZ - 00915 1500 1500 1500 1500 1500 1500 50175850 1075 WT-15 WT-07 General For coordination principles and illustrations of Design Intent for Interior Design elements refer to Scheme T1-DS-AR-DES-0004 -Interior Design. Cladding system Office block cladding to be 1.5m wide PPC aluminium panels to be supported from steelwork substrate. Vertical recess joints to be minimum 15mm with secret fixings. All joints shall be consistent and no joints shall exceed 50mm and any exposed fixings shall be PPC to match Radiused corners shall be complete radiused panels to provide smooth, seamless radius. Vertical join faces only. Fascia panel to return top and bottom to form parapet and interface with ceiling with integrated stainless On North facade around primary column, cladding to be curved to enable a uniform offset around the col shaped retail volume. Curtain walling Curtain walling to comprise 10mm HS + 1.52mm SGP 10mm HS laminated glazing panels; connected stainless steel channels. Bottom channel to be fixed to substrate and have integrated150mm stainless channel to be recessed in ceiling and incorporate eflection head. Glazing panes to abut seamlessly with structural silicon joints. Glazing to be set-back 150mm from the face Aluminium PPC profile to be provided to connect glazing to partition wall where required. Office block 'Jaali screens' Feature 'jaali' screen comprised of equilateral triangular components fabricated from 100x20mm hollow sections with mechanical fixings hidden with front caps. Screens to be formed of 3m typical and 2.1m edge panels with 20mm perimeter frame; factory formed for Panels to stack on top of each other and be supported by brackets back to cladding. Screen panels to a cladding system joints behind. Jaali brackets and fixing details shall be coloured to match the panel. 15mm steel plate brackets to upport and be coordinated with shadow gap of backing cladding panel to prevent visible fixings through the panel. be used in the construction of the aluminium profiled 'jaali' to achieve seamless appearance. No secondary systems (ICT, signage etc) shall be xed to any part of the 'jaali system. Refer to Section XXX in Scheme Design Report YI-MA-T1-DS-AR-DES-0004 -Interior Design report for Office block column panel PPC pressed metal panel channels shall be used at nterfaces with columns; set out as defined on the PPC channels shall be seamless and set out to align with 'jaali' pattern junctions. Channel to incorporate insulated backing panel to enable partition wall to be provided as required. Panel to incorporate cut-out around primary column bracket to enable movement. Face of panel to be set of column for movement. Office block 'Jaali screens' closing panels Perforated hinged panel to be provided at top and ottom of screen to close off the void; colour to match design top panel to take weight of person for access and maintenance. Access to top panel to be enable back integrated to perimeter balustrade. Integrated lighting to be provided behind the scree located above and below the perforated panel respectively drawings and specified in the Studio Fractal drawings and report. Media screens and displays Media screen to be comprised of LED or LCD screens with a 16:9 aspect ratio to fit within the formed pening. Media screen to fit within the framed opening.Supplier to provide aluminium perimeter frame;20mm thick screen. Supplier to provide infill panels as required. Media screens shall have bezels of no greater than 5mm to ensure seamless appearance and interface maximum of 20 mm to allow screen removal. Contractor to provide fixings of media screen to backing substrate and account for deflection and tolerances ensure consistent shadow gaps and level setting out MEP perforated screen Perforated screen to be provided around the MEP ductowork. Screen to comprise PPC aluminium perforated anthracite; fixed back to vertical PPC steel wind posts connected to office block lid and restrained a top Vertical recess joints to be minimum 15mm with secret fixings. Panels to be hinged to enable access to Vertical recess joints to be minimum 15mm with secret fixings. Panels to be hinged to enable access to Radiused corners shall be complete radiused panels to provide smooth, seamless radius. Vertical join faces only. Balustrade and planter Balustrades and handrails are to be fabricated from perimeter flat frame and welded steel flats at 50mm to be at 1.5m centres to match awning and cladding panels. Handrail bases to be at regular centres bolted to rimary structure below floor finish and covered. Balustrades to be welded internally to stringers. All welds shall be ground down to achieve flush seamless finish. Balustrade to be integrated with base planter; 450mm high; to be formed out of PPC metal trough; face face of balustrades to maintain flush finish; with 15mm shadow gaps either side of balustrade. 1 2 3 4 5 6 7 8 200 Office screen and glazing (north) key elevation 50 Office screen and glazing (north) Elevation 3 50 Office screen and glazing (north) Section Office screen and glazing (north) axo 5 50 Office Screen and glazing (North) plan 1 Delhi Noida International Airport [2020 - 2022]
H 3 ZZ 00915 5100180026253375 150015001500150015001500150015001500150015001500 +13.600 L2 +20.500 L3 +25.300 PL2 ZZ - 00915 WF-01 WT-15 CL-01 1500 1500 1500 1500 1500 1500 1500 1500 +13.600 +20.500 +25.300 PL2 1 2 1800 2625 3375 7800 ZZ-00914 CL-01 WT-15 WF-01 WF-01 3 Contractor provide optional price for providing jaali screen on north facade H-F H-06 ZZ - 00915 1500 1500 1500 1500 1500 1500 WT-07 General For coordination principles and illustrations of Design Intent for Interior Design elements refer to Scheme Design Report YI-MAT1-DS-AR-DES-0004 -Interior Design. Cladding system Office block cladding to be 1.5m wide PPC aluminium panels to be supported from steelwork substrate. Vertical recess joints to be minimum 15mm with secret fixings. All joints shall be consistent and no joints shall exceed 50mm and any exposed fixings shall be PPC to match panels. Radiused corners shall be complete radiused panels to provide smooth, seamless radius. Vertical joints to be on orthogonal faces only. Fascia panel to return top and bottom to form parapet and interface with ceiling with integrated stainless steel shadow gap. On North facade around primary column, cladding to be curved to enable uniform offset around the column to connect to Lshaped retail volume. Curtain walling Curtain walling to comprise 10mm HS 1.52mm SGP + 10mm HS laminated glazing panels; connected top and bottom via stainless steel channels. Bottom channel to be fixe to substrate and have integrated150mm stainless teel skirting. Top channel to be recessed in ceiling and incorporate eflection head. Glazing panes to abut seamlessly with structural silicon joints. Glazing to be set-back 150mm from the face of the cladding. Aluminium PPC profile to be provided to connect glazing partition wall where required. Office block 'Jaali screens' Feature 'jaali' screen comprised of equilateral triangular components fabricated from 100x20mm hollow aluminium rectangular sections with mechanical fixings hidden with front caps. Screens to be formed of 3m typical and 2.1m edge panels with 20mm perimeter frame; factory formed for assembly on site. Panels to stack on top of each other and supported by brackets back to cladding. Screen panels to lign with the 1.5m cladding system joints behind. Jaali brackets and fixing details shall be coloured to match the panel. 15mm steel plate brackets to support screen either side and be coordinated with shadow gap of backing cladding panel to prevent visible fixings through the panel. Secret fixings shall be used in the construction of the aluminium profiled 'jaali' to achieve a seamless appearance. No secondary systems (ICT, signage etc) shall be xed to any part of the 'jaali system. Refer to Section XXX in Scheme Design Report YI-MA-T1-DS-AR-DES-0004 -Interior Design report for further details. Office block column panel PPC pressed metal panel channels shall be used at nterfaces with columns; set out as defined on the drawings. Joints within PPC channels shall be seamless and set out to align with 'jaali' pattern junctions. Channel to incorporate solid acoustically insulated backing panel to enable partition wall to be provided as required. Panel to incorporate cut-out around primary column bracket to movement. Face of panel to be set-out 200mm from face of column for movement. Office block 'Jaali screens' closing panels Perforated hinged panel to be provided at top and ottom of screen to close the void; colour to match screen. Contractor to design top panel to take weight of person for access and maintenance. Access to top panel to be enable via lanyard system back integrated to perimeter balustrade. Integrated lighting to be provided behind the scree located above and below the perforated panel respectively as set-out in the drawings and specified in the Studio Fractal drawings and report. Media screens and displays Media screen to be comprised of LED or LCD screens with 16:9 aspect ratio to fit within the formed pening. Media screen to fit within the framed opening.Supplier to provide aluminium perimeter frame;20mm thick colour to match jaali screen. Supplier to provide infill panels as required. Media screens shall have bezels of no greater than 5mm to seamless appearance and interface joints shall be maximum of 20 mm to allow screen removal. Contractor to provide fixings of media screen backing substrate and account for deflection and tolerances with jaali screen to ensure consistent shadow gaps and level setting out MEP perforated screen Perforated screen to be provided around the MEP ductowork. Screen to comprise PPC aluminium perforated panels, colour anthracite; fixed back to vertical PPC steel wind osts connected to office block lid and restrained top at primary roof truss. Vertical recess joints to be minimum 15mm with secret fixings. Panels to be hinged to enable access to MEP ductwork behind. Vertical recess joints to be minimum 15mm with secret fixings. Panels to be hinged to enable access to MEP ductwork behind. Radiused corners shall be complete radiused panels to provide smooth, seamless radius. Vertical joints to be on orthogonal faces only. Balustrade and planter Balustrades and handrails are to be fabricated from perimeter flat frame and welded steel flats at 50mm dimensions. Balustrade to be at 1.5m centres to match awning and cladding panels. Handrail bases to be at regular centres bolted to rimary structure below floor finish and covered. Balustrades to be welded internally to stringers. All welds shall be ground down to achieve flush seamless finish. Balustrade to be integrated with base planter; 450mm high; to be formed out of PPC metal trough; face to be aligned with front face of balustrades to maintain a flush finish; with 15mm shadow gaps either side of balustrade. NOTES DEVELOPMENT NOIDA INTERNATIONAL MASTER Terminal 01 All dimensions are millimeter’s Written dimensions shall be read Level 0.0m Lvl shall correspond All site levels shall be coordinated This drawing to be read in conjunction Reports and Specifications For Scope demarcation between (Airside and Landside Infrastructure), Volume [Employer’s Requirement] 21 31 41 51 61 STATUS PROJECT SUB CONSULTANT: CONSULTANT: CLIENT: DRAWING TITLE JOB No: SCALE DSGN DRWN CHKN APPD NAME DRAWING NO. RELEASED FOR INFORMATION TENDER YAMUNA PVT. LTD. WI As indicated 29/0 TERMINAL Office block North Elevation SCHEMATIC Designer Checker Author Approver YIAPL -MA -AR -ZZ 200 Office screen and glazing (north) key elevation 50 Office screen and glazing (north) Elevation 3 50 Office screen and glazing (north) Section Office screen and glazing (north) axo 5 50 Office Screen and glazing (North) plan 1 REV. NO. DESCRIPTION Key Value CL-01METAL WF-01BACK WT-07100 WT-15INTERNALH 0 H 4 H 0 H H 0 +13.600 L2 +20.500 L3 +25.300 L4 1 2 1800 2625 3375 7800 5 ZZ-00914 CL-01 WT-15 WF-01 WF-01 3 Contractor to provide optional price for providing jaali screen on north facade General For coordination principles and illustrations of Design Intent for Interior Design elements refer to Scheme Design Report YI-MAT1-DS-AR-DES-0004 -Interior Design. Cladding system Office block cladding to be 1.5m wide PPC aluminium panels to be supported from steelwork substrate. Vertical recess joints to be minimum 15mm with secret fixings. All joints shall be consistent and no joints shall exceed 50mm and any exposed fixings shall be PPC to match panels. Radiused corners shall be complete radiused panels to provide a smooth, seamless radius. Vertical joints to be on orthogonal faces only. Fascia panel to return top and bottom to form parapet and interface with ceiling with integrated stainless steel shadow gap. On North facade around primary column, cladding to be curved to enable a uniform offset around the column to connect to Lshaped retail volume. Curtain walling Curtain walling to comprise 10mm HS + 1.52mm SGP 10mm HS laminated glazing panels; connected top and bottom via stainless steel channels. Bottom channel to be fixed to substrate and have integrated150mm stainless steel skirting. Top channel to be recessed in ceiling and incorporate deflection head. Glazing panes to abut seamlessly with structural silicon joints. Glazing to be set-back 150mm from the face of the cladding. Aluminium PPC profile to be provided to connect glazing to partition wall where required. Office block 'Jaali screens' Feature 'jaali' screen comprised of equilateral triangular components fabricated from 100x20mm hollow aluminium rectangular sections with mechanical fixings hidden with front caps. Screens to be formed of 3m typical and 2.1m edge panels with 20mm perimeter frame; factory formed for assembly on site. Panels
to
faces only. Balustrade and planter Balustrades and handrails are to be fabricated from perimeter flat frame and welded steel flats at 50mm dimensions. Balustrade to be at 1.5m centres to match awning and cladding panels. Handrail bases to be at regular centres bolted to primary structure below floor finish and covered. Balustrades to be welded internally to stringers. All welds shall be ground down to achieve flush seamless finish. Balustrade to be integrated with base planter; 450mm high; to be formed out of PPC metal trough; face to be aligned with front face of balustrades to maintain a flush finish; with 15mm shadow gaps either side of balustrade. 1 2 3 4 5 6 7 8 NOTES DEVELOPMENT OF NOIDA INTERNATIONAL AIRPORT (NIA) MASTER KEY PLAN Terminal -1 KEY PLAN 01 02 All dimensions are in millimeter’s & all levels re in meter’s, unless stated otherwise. Written dimensions shall be read and drawings sha not be measured. Level 0.0m Lvl shall correspond to 199.15m RL at Site All site levels shall be coordinated with EPC -2 Package Contractor This drawing to be read in conjunction with al other relevant Discipline drawings, Design Reports and Specifications For Scope demarcation between EPC-1 Package (Terminal Building) and EPC-2 Package (Airside and Landside Infrastructure), refer to Document no Appendix-1 [Battery Limits] of Volume [Employer’s Requirement] 11 21 31 41 51 61 12 22 32 42 52 62 13 23 33 43 53 63 03 04 05 14 24 34 44 54 64 15 25 35 46 56 66 16 26 36 45 55 65 06 SUB CONSULTANT: CONSULTANT: CLIENT: YAMUNA INTERNATIONAL AIRPORT PVT. LTD. NORDIC -OFFICE OF ARCHITECTURE, GRIMSHAW, HAPTIC, Approver Checker Author Designer and glazing (north) Section Office screen and glazing (north) axo 5 REV. NO. DESCRIPTION DESIGNEDDRAWNCHECKEDAPPROVED NIA_Office Block Key Value Keynote Text CL-01METAL LINEAR BAFFEL CEILING WF-01BACK PAINTED GLASS WT-07100 THK GYPSUM DRY WALL WT-15INTERNAL LAMINATED GLASS PARTITION - FRAMELSS STRUCTURAL SILICON JOINT
WT-15 WF-16 H CL-04 5 3 120225430100110 120755110 1300 900 450440 2200 890 1200 8 WF-16 CL-13 RL-14 H CL-01 WF-16 195430100110 725110 1150 400250 1800 WF-16 FX-06 WF-01 3 ZZ 00914 535 535 535 535 535 2680 955 955 955 WF-16 FX-06 345 330 3 WF-16 General For coordination principles and illustrations of Design Intent for Interior Design elements refer to cheme Design Report YI-MAT1-DS-AR-DES-0004 -Interior Design. Cladding system Office block cladding to be 1.5m wide PPC aluminium panels to be supported from steelwork substrate. Vertical recess joints to be minimum 15mm with secret fixings. All joints shall be consistent and no joints shall exceed 50mm and any exposed fixings shall be PPC to match panels. Radiused corners shall be complete radiused panels to provide smooth, seamless radius. Vertical joints to be on orthogonal faces only. Fascia panel to return top and bottom to form parapet and interface with ceiling with integrated stainless steel shadow gap. On North facade around primary column, cladding to be curved to enable a uniform offset around the column to connect to Lshaped retail volume. Curtain walling Curtain walling to comprise 10mm HS 1.52mm SGP 10mm HS laminated glazing panels; connected top and bottom via stainless steel channels. Bottom channel to be fixe to substrate and have integrated150mm stainless teel skirting. Top channel to be recessed in ceiling and incorporate eflection head. Glazing panes to abut seamlessly with structural silicon joints. Glazing to be set-back 150mm from the face of the cladding. Aluminium PPC profile to be provided to connect glazing to partition wall where required. Office block 'Jaali screens' Feature 'jaali' screen comprised of equilateral triangular components fabricated from 100x20mm hollow aluminium rectangular sections with mechanical fixings hidden with front caps. Screens to be formed of 3m typical and 2.1m edge panels with 20mm perimeter frame; factory formed for assembly on site. Panels to stack on top of each other and be supported by brackets back to cladding. Screen panels to lign with the 1.5m cladding system joints behind. Jaali brackets and fixing details shall be coloured to match the panel. 15mm steel plate brackets to upport screen either side and be coordinated with shadow gap of backing cladding panel to prevent visible fixings through the panel. Secret fixings shall be used in the construction of the aluminium profiled 'jaali' to achieve seamless appearance. No secondary systems (ICT, signage etc) shall be xed to any part of the 'jaali system. Refer to Section XXX in Scheme Design Report YI-MA-T1-DS-AR-DES-0004 -Interior Design report for further details. Office block column panel PPC pressed metal panel channels shall be used at nterfaces with columns; set out as defined on the drawings. Joints within PPC channels shall be seamless and set out to align with 'jaali' pattern junctions. Channel to incorporate solid acoustically insulated backing panel to enable partition wall to be provided as required. Panel to incorporate cut-out around primary column bracket to enable movement. Face of panel to be set-out 200mm from face of column for movement. Office block 'Jaali screens' closing panels Perforated hinged panel to be provided at top and bottom of screen to close off the void; colour to match screen. Contractor to design top panel to take weight of person for acces and maintenance. Access to top panel to be enable via lanyard system back integrated to perimeter balustrade. Integrated lighting to be provided behind the screen located above and below the perforated panel respectively as set-out in the drawings and specified in the Studio Fractal drawings and report. Media screens and displays Media screen to be comprised of LED or LCD screens with 16:9 aspect ratio to fit within the formed pening. Media screen to fit within the framed opening.Supplier to provide aluminium perimeter frame;20mm thick colour to match jaali screen. Supplier to provide infill panels as required. Media screens shall have bezels of no greater than 5mm to ensure seamless appearance and interface joints shall be a maximum of 20 mm to allow screen removal. Contractor to provide fixings of media screen to backing substrate and account for deflection and tolerances with jaali screen to ensure consistent shadow gaps and level setting out MEP perforated screen Perforated screen to be provided around the MEP ductowork. Screen to comprise PPC aluminium perforated panels, colour anthracite; fixed back to vertical PPC steel wind posts connected to office block lid and restrained top at primary roof truss. Vertical recess joints to be minimum 15mm with secret fixings. Panels to be hinged to enable access to MEP ductwork behind. Vertical recess joints to be minimum 15mm with secret fixings. Panels to be hinged to enable access to MEP ductwork behind. Radiused corners shall be complete radiused panels to provide smooth, seamless radius. Vertical joints to be on orthogonal faces only. Balustrade and planter Balustrades and handrails are to be fabricated from perimeter flat frame and welded steel flats at 50mm dimensions. Balustrade to be at 1.5m centres to match awning and cladding panels. Handrail bases to be at regular centres bolted to rimary structure below floor finish and covered. Balustrades to be welded internally to stringers. All welds shall be ground down to achieve flush seamless finish. Balustrade to be integrated with base planter; 450mm high; to be formed out of PPC metal trough; face to be aligned with front face of balustrades to maintain a flush finish; wit 15mm shadow gaps either side of balustrade. 1 2 3 4 5 6 7 8 NOTES DEVELOPMENT OF NOIDA INTERNATIONAL AIRPORT (NIA) MASTER KEY PLAN Terminal -1 KEY PLAN 01 02 All dimensions are millimeter’s levels re in meter’s, unless stated otherwise. Written dimensions shall be read and drawings sha not be measured. Level 0.0m Lvl shall correspond to 199.15m RL Site All site levels shall be coordinated with EPC Package Contractor This drawing be read conjunction with other relevant Discipline drawings, Design Reports and Specifications For Scope demarcation between EPC-1 Package (Terminal Building) and EPC-2 Package (Airside and Landside Infrastructure), refer Document no Appendix-1 [Battery Limits] Volume [Employer’s Requirement] 11 21 31 41 51 61 12 22 32 42 52 62 13 23 33 43 53 63 03 04 05 14 24 34 44 54 64 15 25 35 46 56 66 26 36 45 55 65 06 STATUS PROJECT SUB CONSULTANT: CONSULTANT: CLIENT: DRAWING TITLE JOB No: SCALE DSGN DRWN CHKN APPD NAME SIGN DATE SIZE: DRAWING NO. REVISION RELEASED FOR INFORMATION TENDER APPROVAL CONSTRUCTION AS BUILT YAMUNA INTERNATIONAL AIRPORT PVT. LTD. SHEET: WIPMODELFREEZE As indicated 29/09/202111:42:18 TERMINAL -1 Office block South Elevation details SCHEMATIC DESIGN Designer Checker Author Approver Approver Checker Author 09/20/21 Designer YIAPL -MA -AR -ZZ -00914 Office screening and glazing (South) -Column Detail 4 Office Screen and Glazing (South) detail Section 1 6 20 Office Screen and Glazing (South) detail Section 2 7 Office screening and glazing (South) -Axo 1 Office screening and glazing (South) -Screen detail 5 20 Office Screen and Glazing (south) Bay Elevation 1.20 2 Bay Triangular Detail 3 ZZ-00938 4 ZZ-00938 REV. NO. DESCRIPTION DESIGNEDDRAWNCHECKEDAPPROVED MEP Cladding AXO 8 3 2 Down Light NIA_Office Block Key Value Keynote Text CL-01METAL LINEAR BAFFEL CEILING CL-04MINERAL FIBRE TILE CEILING 600 X 600 CL-13PERFORATED ALUMINIUM PANEL FX-06MEDIA PANELS RL-14TROLLEY BANK RAILING SYSTEM WF-01BACK PAINTED GLASS WF-16JALI SCREEN SYSTEM WT-15INTERNAL LAMINATED GLASS PARTITION FRAMELSS STRUCTURAL SILICON JOINT WT-15 WF-16 H CL-04 5 3 120225430100110 120755110 1300 900 450440 2200 890 1200 8 WF-16 CL-13 RL-14 H CL-01 WF-16 195430100110 725110 1150 400250 1800 WF-16 FX-06 WF-01 3 ZZ 00914 3 6 535 535 535 535 535 2680 955 955 955 WF-16 FX-06 345 330 WF-16 General For coordination principles and illustrations of Design Intent for Interior Design elements refer to Scheme Design Report YI-MAT1-DS-AR-DES-0004 -Interior Design. Cladding system Office block cladding to be 1.5m wide PPC aluminium panels to be supported from steelwork substrate. Vertical recess joints to be minimum 15mm with secret fixings. All joints shall be consistent and no joints shall exceed 50mm and any exposed fixings shall be PPC to match panels. Radiused corners shall be complete radiused panels to provide smooth, seamless radius. Vertical joints to be on orthogonal faces only. Fascia panel to return top and bottom to form parapet and interface with ceiling with integrated stainless steel shadow gap. On North facade around primary column, cladding to be curved to enable a uniform offset around the column to connect to Lshaped retail volume. Curtain walling Curtain walling to comprise 10mm HS + 1.52mm SGP + 10mm HS laminated glazing panels; connected top and bottom via stainless steel channels. Bottom channel to be fixe to substrate and have integrated150mm stainless teel skirting. Top channel to be recessed in ceiling and incorporate deflection head. Glazing panes to abut seamlessly with structural silicon joints. Glazing to be set-back 150mm from the face of the cladding. Aluminium PPC profile to be provided to connect glazing to partition wall where required. Office block 'Jaali screens' Feature 'jaali' screen comprised of equilateral triangular components fabricated from 100x20mm hollow aluminium rectangular sections with mechanical fixings hidden with front caps. Screens to be formed of 3m typical and 2.1m edge panels with 20mm perimeter frame; factory formed for assembly on site. Panels to stack on top of each other and be supported by brackets back to cladding. Screen panels to align with 1.5m cladding system joints behind. Jaali brackets and fixing details shall be coloured to match the panel. 15mm steel plate brackets to upport screen either side and be coordinated with shadow gap of backing cladding panel to prevent visible fixings through the panel. Secret fixings shall be used in the construction of the aluminium profiled 'jaali' to achieve a seamless appearance. No secondary systems (ICT, signage etc) shall be fixed to any part of the 'jaali system. Refer to Section XXX in Scheme Design Report YI-MA-T1-DS-AR-DES-0004 -Interior Design report for further details. Office block column panel PPC pressed metal panel channels shall be used at nterfaces with columns; set out as defined on the rawings. Joints within PPC channels shall be seamless and set out to align with 'jaali' pattern junctions. Channel to incorporate solid acoustically insulated backing panel to enable partition wall to be provided as required. Panel to incorporate cut-out around primary column bracket to enable movement. Face of panel to be set-out 200mm from face of column for movement. Office block 'Jaali screens' closing panels Perforated hinged panel to be provided at top and bottom of screen to close off the void; colour to match screen. Contractor to design top panel to take weight of person for acces and maintenance. Access to top panel to be enable via lanyard system back integrated to perimeter balustrade. Integrated lighting to be provided behind the screen located above and below the perforated panel respectively as set-out in the drawings and specified in the Studio Fractal drawings and report. Media screens and displays Media screen to be comprised of LED or LCD screens with 16:9 aspect ratio to fit within the formed pening. Media screen to fit within the framed opening.Supplier to provide aluminium perimeter frame;20mm thick colour to match jaali screen. Supplier to provide infill panels as required. Media screens shall have bezels of no greater than 5mm to ensure seamless appearance and interface joints shall be maximum of 20 mm to allow screen removal. Contractor to provide fixings of media screen to backing substrate and account for deflection and tolerances with jaali screen to ensure consistent shadow gaps and level setting out MEP perforated screen Perforated screen to be provided around the MEP ductowork. Screen to comprise PPC aluminium perforated panels, colour anthracite; fixed back to vertical PPC steel wind osts connected to office block lid and restrained a top at primary roof truss. Vertical recess joints to be minimum 15mm with secret fixings. Panels to be hinged to enable access to MEP ductwork behind. Vertical recess joints to be minimum 15mm with secret fixings. Panels to be hinged to enable access to MEP ductwork behind. Radiused corners shall be complete radiused panels to provide smooth, seamless radius. Vertical joints to be on orthogonal faces only. Balustrade and planter Balustrades and handrails are to be fabricated from perimeter flat frame and welded steel flats at 50mm dimensions. Balustrade to be at 1.5m centres to match awning and cladding panels. Handrail bases to be at regular centres bolted to primary structure below floor finish and covered. Balustrades to be welded internally to stringers. All welds shall be ground down to achieve flush seamless finish. Balustrade to be integrated with base planter; 450mm high; to be formed out of PPC metal trough; face to be aligned with front face of balustrades to maintain a flush finish; wit 15mm shadow gaps either side of balustrade. 1 2 3 4 5 6 7 8 NOTES DEVELOPMENT OF NOIDA INTERNATIONAL AIRPORT (NIA) MASTER KEY PLAN Terminal -1 KEY PLAN N 02 All dimensions are in millimeter’s all levels meter’s, unless stated otherwise. Written dimensions shall be read and drawings sha not be measured. Level 0.0m Lvl shall correspond 199.15m RL at Site All site levels shall be coordinated with EPC -2 Package Contractor This drawing be read in conjunction with al other relevant Discipline drawings, Design Reports and Specifications For Scope demarcation between EPC-1 Package (Terminal Building) and EPC-2 Package (Airside and Landside Infrastructure), refer to Document no Appendix-1 [Battery Limits] of Volume [Employer’s Requirement] 41 22 32 42 52 62 13 23 33 43 53 63 03 04 05 14 24 34 44 54 64 15 25 35 46 56 66 16 26 36 45 55 65 06 STATUS PROJECT SUB CONSULTANT: CONSULTANT: CLIENT: DRAWING TITLE JOB No: SCALE DSGN DRWN CHKN APPD NAME SIGN DATE SIZE: DRAWING NO. REVISION RELEASED FOR INFORMATION TENDER APPROVAL CONSTRUCTION AS BUILT YAMUNA INTERNATIONAL AIRPORT PVT. LTD. SHEET: WIPMODELFREEZE As indicated 29/09/202111:4218 TERMINAL -1 Office block South Elevation details SCHEMATIC DESIGN Designer Checker Author Approver Approver Checker Author 09/20/21 Designer YIAPL -MA -AR -ZZ -00914 Office screening and glazing (South) -Column Detail 4 20 Office Screen and Glazing (South) detail Section 1 6 20 Office Screen and Glazing (South) detail Section 2 7 Office screening and glazing (South) -Axo 1 Office screening and glazing (South) -Screen detail 5 20 Office Screen and Glazing (south) Bay Elevation 1.20 2 Bay Triangular Detail 3 ZZ-00938 ZZ-00938 REV. NO. DESCRIPTION DESIGNEDDRAWNCHECKEDAPPROVED MEP Cladding AXO 8 3 2 Down Light NIA_Office Block Key Value Keynote Text CL-01METAL LINEAR BAFFEL CEILING CL-04MINERAL FIBRE TILE CEILING 600 600 CL-13PERFORATED ALUMINIUM PANEL FX-06MEDIA PANELS RL-14TROLLEY BANK RAILING SYSTEM WF-01BACK PAINTED GLASS WF-16JALI SCREEN SYSTEM WT-15INTERNAL LAMINATED GLASS PARTITION FRAMELSS STRUCTURAL SILICON JOINT Delhi Noida International Airport [2020 - 2022]

Architectural Assistant Part II Haptic Architects ltd 2020-2021

Programmes Used:

Model/ Drawings - Sketch-up

Rendering - Enscape

Editing - Photoshop

Bergen’s Laksevåg waterfront masterplanning competition

Sector: Master Planning

RIBA Stages 1

Bergen Municipality brief to restore and redevelop the former shipbuilding site overlooking the Puddefjorden. The aim is transforming the shipyard into a creative and manufacturing centre of marine industry for the 21st century.

My role was developement of sections and solar study as well as post editing of renders.

D. FOKUSOMRÅDE: «TRANSFORMASJON OG PROGRAMMERING AV SKJØNDAL SLIPP»

Skjøndal Slipp ligger sentrum av utviklingsområdet. Vi har fokusert på mer permanent utvikling på hver side av slippen, men fortsatt sterkt preget av fritidsfunksjoner og butikker. Som et minne om stedets marine historie, vil Skjøndal Slipp forbli som en sentral funksjon, med nye aktiviteter som kan sirkulere rundt slippen. Det er viktig at området revitaliseres med tilpasset og ny bruk. For det første foreslår vi en heisebro som en videreføring av kaikanten. Overflatene og overbygningen oppgraderes slik at slippen kan fungere som opprinnelig ment, til å bringe mindre fartøy på land for service og opplag, men også for å gjøre bruk av skrågulvet som et utendørs amfiteater for gateforestillinger og små konserter. En ny overbygning vil romme løfteutstyr og en belysningsrigg, samt festepunkter for en midlertidig takkonstruksjon, som gjør slippen til et mingleområde for den foreslåtte musikkarenaen.

Når den ikke er bruk kan slippen også dekkes over med et midlertidig gulv for å gi en flat plass. På den andre siden av slippen foreslår vi at dagens kontorer bygges om til restauranter og et pubområde. På denne måten blir slippen en del av et sentralt urbant torg.

05

06 Bergen’s Lakseveg Waterfront [2020 - 2021]

MArch Year 5

University of Greenwich

2020

Programmes Used:

Model - Revit

Rendering - V-ray

Editing - Photoshop

THE BLIND SPOT

The anti-surveillance monastery located in the mountains of China in the eerie Fengdu ghost city is a retreat/sanctuary where you can escape the pressures of a surveillant society. It is temporary living off the grid and houses sleeping chambers, meditation rooms, learning centres, etc. It’s design is influenced by Buddhist monasteries and made entirely of Mesh the sanctuary shows the paradox of complete transparency whilst shielding from the outside world.

Programmes Used:

Model - Revit + Rhino

Rendering - V-ray

Editing - Photoshop

Right: Entrance to the Site

Top left: View from top of site to opposite city

Bottom left: concealed archway with offering bowls

The Blind Spot [2019 - 2020]

Programmes Used:

Model - Revit Rendering - V-ray Editing - Photoshop

Left: Meditation room

Top Right: Room of enlightenment

Bottom right: Sleeping quarters

MArch Year 4 University of Greenwich 2019

Programmes Used:

Model - Revit

Rendering - Revit

Editing - Photoshop

THE VENDING MACHINE MUSEUM

Vending machines are one of today’s most ‘uncollected collectables’. Although there are vintage vending machines in the UK up for public view, such as in the London Transport Museum and the Science Museum, there are no spaces designed or dedicated to their preservation.

The National vending machine- The Museum of the future in Holland, although impressive, is dedicated to selling historical objects within a transportable vending machine type building. It is not a museum that showcases all the amazing vintage vending machines.

Old vending machines have a story and character that need to be beautifully displayed. Additionally the odd and rare vending machines that pop up, even to this day, in particular in Japan are not able to be appreciated by the masses.

The Vending Machine museum in London will be spaces specifically designed for these intricate machines.

Right: Night render front elevation

Top left: Rendered ground floor plan

Bottom left: 3D printed 1:100 model

Detail Section and Front Elevation

FLOOR VENTILATION PLATE

3MM HOT - DIP GALVANIZED STEEL PANEL CLADDING

100MM CONCRETE SLAB WITH METAL DECK, SOUND INSULATION PLACED ON TOP

TWO C-SECTION BEAMS

BOLTED TOGETHER

SECONDARY STRUCTURE

STEEL CELL BEAM EXPOSED INTERNALLY TO HOUSE SERVICES

INTERNAL BLIND SYSTEM

TRIPLE GLAZED GLASS

MEZZANINE LEVEL WITH CSECTION BEAM BOLTED TO EITHER SIDE OF CONCRETE CORE WALLS

STEEL BEAM TO BE INSULATED AND CLAD IN GALVANIZED STEEL CLADDING

LARGE STEEL FRAMED CIRCULAR WINDOW

INTERNAL HOT- DIP GALVANIZED STEEL CLADDING TO WRAP AROUND WINDOW SILL.

AIR GAP WITH SECONDARY STEEL STRUCTURE

INSULATION BEHIND EXTERNAL STEEL CLADDING

CLADDING TO WRAP UNDERSIDE OF THE OVERHANG