BUILDING TOMMOROWS LEGACY TODAY
OUR DRIVERS
EXELLENCE
We strive for perfection in every detail, delivering results that exceed expectations.
PROFESSIONALISM
Our unwavering dedication ensures the highest level of client trust and satisfaction.
INNOVATION
Embracing advanced technologies, we create forward-thinking solutions tailored to modern challenges.
SUSTAINABILITY
We are committed to environmentally conscious practices, integrating renewable energy into our work.
COLLABORATION
Strong partnerships and open communication drive our success.
ADAPTABILITY
We anticipate and meet evolving client needs with precision and expertise.
MISSION
At Faber International, our mission is to deliver innovative and sustainable construction solutions that exceed client expectations. We are committed to preserving cultur al heritage, advancing eco-friendly practices, and fostering collaboration to create iconic structures that inspire trust and elevate industry stand ards. Through meticulous attention to detail and an unwavering focus on excellence, we strive to shape the future of construction and contribute positively to

OUR VISION

Faber International envisions a future where innovation and craftsmanship redefine the boundaries of construction excellence. By seamlessly integrating advanced technologies, preserving cultural heritage, and championing sustainable practices, we strive to deliver transformative projects that set new benchmarks in the industry. Our mission is to enrich lives, empower communities, and shape a built environment that reflects both progress and enduring quality.
OUR QUALITY POLICY
At Faber International, quality is our cornerstone. We are committed to achieving uncompromising customer satisfaction by ensuring excellence in every stage of production and implementation. To sustain a quality-driven service, we prioritize the use of premium materials, advanced methodologies, and continuous skill development for our team. This dedication guarantees not only exceptional results but also the long-term success of every project.
We uphold the highest ethical and professional standards, while our team actively contributes to the communities we serve, aiming to leave a positive and enduring impact through every project. Guided by a strong sense of corporate and social responsibility, we are committed to:
■ Ensuring compliance with all legal, moral, and environmental regulations.
■ Embracing sustainable practices, including the use of renewable energy solutions.
■ Promoting transparency, personal accountability, and informed decision-making at all levels
■ Cultivating a culture of integrity and respect that strengthens the trust of our clients, partners, and employees.
OUR EXPERTISE
FULL CONSTRUCTION SOLUTIONS
From static and architectural construction to infrastructure development, we deliver end-to-end project management and execution
STEEL CONSTRUCTION
Expertise in advanced steel structures and fabrication
ELECTROMECHANICAL & MEP SERVICES
Integration of mechanical, electrical, and plumbing systems for efficient, future-proof buildings.
AUTOMATION SYSTEMS
Cutting-edge solutions for machine, building, and housing automation to enhance operational efficiency.
MEDIUM AND LOW VOLTAGE PROJECTS
Design, installation, and maintenance of energy systems, transformer centers, and energy transmission lines
HVAC & FIRE PROTECTION SYSTEMS
Custom solutions for air duct installation, fire sprinkler systems, and ventilation.
CONSULTANCY & ENGINEERING SERVICES
Technical expertise for energy optimization, harmonic filtration, and infrastructure

OUR REFERRENCES

INTERKONZALTING BAYTUR
KBR SERKA INSAAT
OBO CDM
CCE SPECIALITIES ARAMCO
FDC GLOBAL USACE
PERINI AECOM

ONGOING PROJECTS

VRANYCZANY-DOBRINOVIĆ PALACE,
EUROPEAN UNION FUNDING PROJECT
SISECAM GLASSPACKAGING
FACTORY HUNGARY KFT

VRANYCZANY- DOBRINOVIĆ PALACE, EUROPEAN UNION FUNDING PROJECT
CLIENT: CROATIAN ACADEMY OF SCIENCES AND ARTS
LOCATION: ZAGREB, CROATIA
CONSULTANT: INTERCONZALTANTING D.O.O
PROJECT VALUE: 10 MILLION EUROS


As outlined in the scope, the project focuses on key renovation components, including the construction of new office spaces and the reinforcement of existing walls using advanced CRM and TORKRET methods. It also involves the removal of existing walls and reconstruction with RCC walls, along with finishing works such as plastering, concrete reinforcement, brickwork, concrete protection with membranes, and the installation of false ceilings, doors, and redesigned corridors.
Additionally, the project includes the installation of nearly 200 tons of steel construction, encompassing structural columns, prefabricated elements, and extensive rebar reinforcement to ensure durability and structural integrity.









As we progress, meticulous planning and comprehensive technical assessments will play a critical role in ensuring the seamless and efficient execution of all project phases. By leveraging our expertise, advanced methodologies, and a proactive approach to problem-solving, we aim to address potential challenges early and maintain the highest standards of quality and precision throughout the project lifecycle. This commitment ensures that every aspect of the project aligns with the client’s vision and adheres to industry-leading best practices.







A significant aspect of this project involves the demolition of approximately 10,000 square meters on the third floor. These new buildings will incorporate a robust steel structure, alongside the installation of modern utilities to meet contemporary standards. This phase highlights our commitment to precision and efficiency, ensuring the seamless integration of new infrastructure with the existing framework.







Our diverse team, comprising of professionals from various nationalities, strengthens our project execution capabilities. For this project, we have a dedicated workforce of eight professional engineers and 75 skilled laborers, covering all aspects of civil, electrical, and mechanical works. Additionally, our specialized technical department ensures precise engineering calculations and the delivery of all necessary drawings.
With a proven track record of executing multimillion-dollar projects across the Middle East and Europe, we possess the expertise and logistical capabilities to efficiently manage complex engineering projects throughout European countries.

SISECAM GLASSPACKAGING FACTORY HUNGARY KFT
CLIENT: DOGUS CONSTRUCTION AND TRAD INC
LOCATION: HUNGARY
CONSULTANT: ERYA ENGINEERING AND
PROJECT MANAGEMENT AND GLEEDS
PROJECT VALUE: 1 MILLION EUROS

The construction activities we undertook as part of this project include the developments surrounding the pumping station, auxiliary building, and batching plant.

Our team successfully completed the construction of the pumping station foundations, which involved the installation of rebar formwork and the pouring of concrete. The total quantity of concrete utilized for this portion of the project was 390 cubic meters (M3).
In addition, we completed the foundation for the auxiliary building, for which we poured a substantial total of 900 cubic meters (M3) of concrete. This foundation serves as a significant component of our overall project, ensuring stability and support for the structure above.
Moreover, we also constructed a batching plant that reaches up to a height of 10 meters. For this particular phase, we poured an additional 450 cubic meters (M3) of concrete, which was essential for achieving the required height and functionality of the plant.
Throughout the project, we maintained a workforce of 45 personnel on site, supervised by one project engineer. Their dedication and hard work were key to our success in delivering this project 100% within the stipulated deadlines.


COMPLETED PROJECTS
Founded in 2016, Faber is a European construction and engineering firm specializing in large-scale projects across construction, seismic-resistant design, and renovation. With headquarters in Zagreb and operational reach across Europe and beyond, we deliver high-quality, structurally sound solutions tailored to modern safety standards. Our expertise includes executing EU-funded projects, as well as high-profile contracts with the U.S. Army Corps of Engineers (USACE) and the U.S. Department of State’s Overseas Buildings Operations (OBO). Backed by an executive team and a highly skilled workforce—all within our own resources—we ensure full control over project execution, from mobilization to completion. Over the years, we’ve built a proven track record of delivering excellence, adapting to complex challenges, and exceeding industry standards.
CLIENT: SCOPE: NAME: LOCATION:
Chancery Select Improvements ProjectProject Copenhagen, DENMARK
Department Of State, OBO/FDC
Renovation works of existing chancery















The scope of the project encompassed comprehensive MEP works for buildings, warehouses, and workshops, including full-scale testing and commissioning. The scope also includes infrastructure ducting for essential MEP services such as potable water, stormwater management, sewerage, fire protection, and low-voltage telecom networks. Additionally, the project features the installation of 11kV substations, oil-water separators, and a potable SCADA system to enhance operational efficiency. Further developments include the installation of street lighting poles, a 50-meter high mast, helipad lighting, and advanced traffic signalization, ensuring a fully integrated and functional infrastructure.”



CLIENT: SCOPE: NAME: LOCATION:
Aramco Dammam Housing Project
Dammam, SAUDI ARABIA
Saudi Aramco / Baytur
210 Villas, Performing electrical and mechanical works



SERVICES WE PROVIDED
■ Conduit installation
■ Cable tray installation
■ Cable pulling
■ Installation of wiring devices
■ Panelboard installattion
■ Grounding
■ Hvac
■ Duct installation
■ Plumbing
■ Water sprinkler
■ Fire alarm
■ Mechanical automation system
■ Water treatment installation








CLIENT: SCOPE: NAME: LOCATION:
03374 North Project Side - 2 Projects
Sharma - Tabuk, SAUDI ARABIA
Saudia Diyar / Azmeel - SAB
Electrical works of a 4* hotel, 5* hotel, administration, laundry, utility center, power room, 11kv transformer and RMU installation, testing and commissioning

CLIENT: NAME:
LOCATION:
JSS Shield, USA Embassy Compounds Baghdad, IRAQ Department Of State, OBO
The project encompassed site preparation, infrastructure development, and construction of key facilities, including a warehouse, SCAC building, utility building, Demarc building, and a link between the new warehouse and Building Eob-C. Additionally, it involved extending Building Eob-A, renovating Buildings Eob-C and Eob-A, enhancing the consular garden, and completing landscaping and entrance ramps. Infrastructure upgrades included the installation of Technical Security Systems, fire alarm systems, low-voltage systems, and voice/data networks, as well as electrical components such as a pad-mounted transformer, G3 backup generator, load bank, AVR, main distribution panel, and automatic transfer switches. The project was successfully completed and approved by the OBO inspection team.


NAME: LOCATION:
CLIENT: SCOPE:
Rabigh 2 Refining and Petrochemical Project Non Process Buildings
Rabigh, SAUDI ARABIA
Department Of State, OBO
Electrical / Mechanical works of non process buildings including IV directorate office complex, camp, administrative, laboratary and warehouse building



CLIENT: NAME: LOCATION:
Sather Airbase,USA Embassy Compound Baghdad, IRAQ Department Of State, OBO

This project involved comprehensive site preparation, infrastructure development, and building construction. Key components included earthworks, utilities, roads, parking, hardscaping, and landscaping. We constructed a warehouse, SCAC building, utility building, Demarc building, and a connecting link between the new warehouse and Building Eob-C, along with a small extension to Building Eob-A. Renovations were completed for Buildings Eob-C and Eob-A, including enhancements to the consular garden and entrance ramps. The infrastructure scope featured the installation of Technical Security Systems, fire alarm systems, low-voltage systems, voice/data systems, a pad-mounted transformer, a G3 backup generator, load bank, AVR, main distribution panel, two automatic transfer switches, and a power monitoring system. The project was completed successfully and inspected by the OBO team.
SERVICES WE PROVIDED
■ Site Preparation & Earthwork
■ Utilities, roads, parking, and hardscaping
■ Final site finishes and landscaping
■ Building Construction & Renovation
■ Warehouse, SCAC building, utility building, and Demarc building.
■ Link building between new warehouse and Building Eob-C.
■ Small extension to Building Eob-A.
■ Renovation of Buildings Eob-C and Eob-A.
■ Enhancement of the consular garden and installation of entrance ramps.
■ Infrastructure Development
■ Technical Security Systems and fire alarm systems.
■ Low-voltage systems and voice/data systems with cable tray and conduit installation.
■ Electrical installations, including:
■ Pad-mounted transformer
■ G3 backup generator
■ Load bank and AVR
■ Main distribution panel
■ Two automatic transfer switches
■ Power monitoring system

The project included the construction of North and South warm-up pads, an Arm-Disarm pad, and connections for Taxiways A, F, and G. The scope also involved the installation of 11 inset runway lights, 76 elevated runway edge lights, 488 elevated taxiway lights, and 16 taxiway end lights. Additionally, 607 basecans (L867 and L868 types), 14,000 meters of 50 mm PVC conduits, and 26,000 meters of 1x16 mm² airfield lighting cable were installed to ensure comprehensive airfield lighting and functionality.
NAME: Design And Construction Of Parallel Taxiway And Ramps
LOCATION:: Bagram US Air Base, AFGHANISTAN
CLIENT:: USACE
The project involves the construction of three 25,000-barrel TS-1 storage tanks with integrated pump facilities. Each tank includes a cut-and-cover design with a concrete pump house, along with associated materials and equipment. Additional features include filter and control buildings, explosion-proof electrical materials, control cabling, and panelboard installations. With extensive expertise in civil, electrical, and mechanical engineering, the company demonstrates full logistical capability to execute complex projects across European countries.

NAME: Bagram Bulk Fuel Supply and Storage
LOCATION:: Bagram US Air Base, AFGHANISTAN
CLIENT:: USACE

The project focused on the installation and retrofitting of government-furnished (GF) CHU pods, categorized into dry and wet types. Each pod is equipped with laundry facilities and a network of utilities, including low-voltage systems, fire alarm systems, technical security systems, telecommunication systems, and CATV. Climate control is provided by split air conditioning units, ensuring optimal living conditions.
The infrastructure scope included the construction of Technical Security Systems (TSS), a wastewater treatment plant with associated equipment, control panels, and cabling, as well as cable tray and rigid conduit installations for CHU connections. Additionally, the project involved installing 11kV transmission materials, 6 km of 11kV overhead lines with stepdown transformers, and 6 km of site lighting integrated with an automation system.
NAME: Sather Airbase, USA Embassy Compound
LOCATION:: Baghdad, IRAQ
CLIENT:: Department Of State, OBO

The project involved the design and construction of upgraded electrical infrastructure, including high-voltage (11 kV) and low-voltage (240/115V) power distribution systems. Key components included underground HV and LV feeders, switchgear stations, and RMU-equipped outdoor transformer substations, ensuring a robust and efficient electrical network.
NAME: Design And Construction Of Electrical Infrastructure
LOCATION:: Al Asad Air Base, IRAQ
CLIENT:: USACE
RESOURCES
Faber International is fully equipped to mobilize for any project with precision and speed. Backed by a team of experienced managers, engineers, administrators, technicians, and skilled personnel, we have the resources and expertise to deliver exceptional results. Our extensive self-performance capabilities ensure maximum efficiency and productivity across all operations.
Financially secure, Faber International develops successful financing models through trusted banking partnerships, enabling us to provide project-specific “bank bonds” and “letters of credit” to our clients. Additionally, our access to advanced materials and equipment allows us to quickly mobilize to any project site.
At Faber International, we believe that people are our greatest asset. Our dedicated workforce operates from headquarters, branch offices, and active project sites, with all management and engineering staff proficient in English and Turkish, and some fluent in additional languages. This global proficiency strengthens our ability to adapt and excel in diverse environments. Whether largescale or highly specialized, we ensure seamless execution by scaling resources and manpower to meet project demands.

mikdat.akman@faberinternational.net
linkedin.com/in/faber-international
@faberinternationalyt