LOCATED WITHIN THE TRADE DISTRICT OF DOWNTOWN BLOOMINGTON, INDIANA, IS A MID-RISE PRO-JECT I TITLED “SHOWERS-TECH HUB”. THE PROJECT ALLUDES TO THE RICH HISTORICAL CONTEXT OF THE SITE, AROUND THE PROPOSED SITE, EXISTING BUILDINGS ARE BEING REPURPOSED FOR CREATIVE USE SUCH AS OFFICES, CRAFT STATIONS; MAKING THE NEW PROPOSAL A HUB BETWEEN THE NORTH AND SOUTH AXIS OF THE TRADE DISTRICT.
THE PROJECT INCORPORATES TECHNOLOGY IN THE TYPE OF ACCESS CONTROL, THE USE OF SEN-SORS TO REDUCE REDUNDANCY IN BUILDING OPERATIONS AS WELL AS LIGHT POLLUTION, ADOPTS PASSIVE HEAT EXCHANGE STRATEGIES- PAYING ATTENTION TO MATERIAL, THE HEALTH OF THE PROPOSED BUILDING OCCUPANTS, AS WELL AS PROFFERING AESTHETICS FACADE WITH SHADING DEVICES CRAFTED FROM THE SUN PATH AND RADIATION ANALYSIS OF THE AREA.
A
01. Showers-Tech Hub
year 3 Fall semeaster)
MULTI-USE MID-RISE BUILDING PROPOSED FOR BLOOMINGTON’S TRADE DISTRICT (ToolsRhino, Grasshoper,Ensacpe and Climate studio)
(M.Arch
MODEL ITERATION 1
MODEL ITERATION 3
2
EXPORT INPUT TABLE EQUIPMENT (KBTU/FT2) 0 OPERATIONAL ENERGY CO2 (IBCO2/YR) 2952.4 OPERATIONAL ENERGY CO2 (IBCO2/YR/FT2) 3.81 OPERATIONAL ENERGY COST ($/YR) 017.44 OPERATIONAL ENERGY COST ($/YR/FT2) 0.3 ENERGY GAIN (KBTU) 2801.58 32% SAVINGS SHGC 0.21 EXT. SHADDING 49983 13898 CONCEPT STRATEGY FACADE SCRIPTED TO TEST VARIOUS OPENING OPTIONS FASADE OPENING MODELED BASED ON THE SUN ANGLE THROUGH OUT THE YEAR. BUILDING FORM IDEA INSPIRED BY SPORTS CHOSEN FENESTRATION DUE TO FLEXIBLE CONTOL AND GLARE CONTROL FENESTRATION MODIFICATIONS FOR DIFFERENT ACTIVITIES WITHIN THE TOWER CLIMATE STUDIO OUTPUT ANALYSIS OF FENESTRATION AND FASADE DESIGN CHOICE. FACADE SCRIPT MODEL SHOWING BEST EXTRUSION CONDITIONS AND TEMPERATURE MODULATIONS FACADE DOUBLING UP AS SEATING AT GRADE SOUTH VIEW 3
10TH ST. MADISON ST. 157'-10" 136'-4" ANTIQUE STORE D 786 787 788 788 789 789 791 792 793 796 797 798 794 SCALE: 1/16" = 1'-0" DISTRICT SITE PLAN 40’ 20’ 10’ 0’ CIRCULATION AMENITIES SPACES RESIDENTIAL UNITS RAIN WATER HARVESTING BIFACIAL SOLAR PANEL AIR EXCHANGE SOLAR SENSORED FASADE- SWNT (SINGLE WALLED CARBON NANOTUBES) ENCAPSULATED WITH PDMS (POLYDIMETHYLSILOXAME) MECHANICAL ROOM WITH COOLING CELING BELOW AND ABOVE SLAB GREENRY FOR IMPORVED MICROCLIMATE CONTROLLED SHUTTERS NATIRAL VENTILATION SECTION B SUMMER SUN WINTER SUN SECTION A ROOF CREST- 333’-0” ISABEL PIEDMONT-SMITH COUNCIL REP. BASKET BALL COURT- 319’-0” 2BEDS + STUDIO APT. 247’-0” KATE ROSENBARGER (DISTRICT 1) 2 BEDS APT. 175’-0” MATT FLAHERTY (AT LARGE) 1 BED APT. 103’-0”) SUSAN SANDBERG (AT LARGE 2) AMENITIES 67’-0” JIM SIMS RON SMITH (DISTRICT 3) PARKING LOT 0’-0” PARKING LOT 31’-0” STEPHEN VOLAN (DISTRICT 4) OFFICE SPACES AMENITIES PARKING RESIDENTIAL CIRCULATION 40' 80' 160' 0 160' 80' 40' 4
AMMENITIES (SPORTS)
RESIDENTIAL UNITS
COMMERCIAL (OFFICES)
PUBLIC AMENITIES
CAR RAMP
PARKING
NORTH VIEW BUILDING STRUCTURE 5
THE SITE IS NEXT TO NOBLIT PARK, I THOUGHT OF WAYS TO MAKE MY PROPOSAL A HABITAT OF NATURE IN A WAY THAT CONTRIBUTES TO QUALITY OF LIFE OF THE USERS, PRESERVE THE MICRO CLIMATE AND BE ULTIMATELY ATTRACTIVE AND COMPLEMENTARY TO ITS ENVIRONMENT.
TO ARCHIVE THIS, KENGO KUMA ECOFRIENDLY HOTEL DESIGN AT PARIS WAS A PRECEDENT STUDY AMONGST OTHERS. PLEASANT EXPERIENCE FOR THE USER AND OPEN INVITATION TO THE PUBLIC WAS A KEY FACTOR. DUE TO THE FLOOD CONSTRAINS THE SITE WAS ELEVATED TO 628’ WHILE ROADS ARE AT 622’.
THIS OPPORTUNITY GAVE ROOM FOR VIEWS TO BE ACHIEVED ON ALL SIDES AS THE PROJECT MIMICS THE SEMBLANCE OF TREES TO THE WEST WHICH THEN TRANSITIONS GRADUALLY INTO LIMESTONE WALLS AS YOU GO EASTWARDS. EASEMENTS HAVE NO PERMANENT CONSTRUCTION LABEL PER ORDIANCE, BUT THESE BECAME A PLATFORM FOR RECREATION, AND EXISTING STORAGE BUIDINGS INTO GARDEN AND OXYGEN SUPPLY TANKS.
A MULTI-USE FACILITY FOR ARTIST, SCOPE- METAL, WOOD, FABRIC WORKSHOPS AND A GALLERY SPACE. (Tool- Rhino, comCheck, Athena, Enscape, Safaira, PVwatt) 02. ARTIST Hub (M.Arch year 2 Fall semeaster) TEST OF A SCULTURAL GARDEN AS MEANS OF C ONNECTING THE PROJECT TO NOBLIT PARK SUNPATH ANALYSIS OF THE SITE CONCEPT
6
STUDIO SPACES IMAGINED / DESIGNED TO BE SUSPENDED FROM DEAD TREE TRUNKS
ROOF DETAIL
ROOF DETAIL F
STAIR WAY/ ELEVATOR SHORT STAY UNIT LONG STAY UNIT 7
A MULTI-USE FACILITY FOR ARTIST, SCOPE- METAL, WOOD, FABRIC WORKSHOPS AND A GALLERY SPACE. (Tool- Rhino, comCheck, Athena, Enscape, Safaira, PVwatt) 02. ARTIST Hub (M.Arch year 2 Fall semeaster) SITE STRUCTURE DOWN UP Bedroom wardrobe STAFF STORAGE KITCHEN LAUNDRY GYM AREA SERVERY AREA COMMONS TERRACE TERRACE Café Gallery Chasing casting ceramicshelling SculptureAssembly Storage Patination FOUNDRY WORKSHOP TERRACE Foyer Open to sky Open to sky Open to sky RECEPTION Open to second Opentosecond floor 624'RAMPup 10' RAMP UP 624' 627'RAMPUP 625'RAMPup 624' 625' step down RAMP up 628'6" DOWN 624' RAMP DOWN 628'6" 628'6" 626' 626' 624' 626' RAMP up 624' Open to sky waxmoulding Café DINING 3049.06 1524.00 23 22 21 11 19 17 16 13 12 10 6 Open to sky Open to sky Kitchen Bath wc. wardrobe closet wardrobe Bedroom bath Bedroom 2 Bedroom 1 wardrobe wc. wardrobe Kitchen Living room bath Bedroom wardrobe Bedroom bath Living room TERRACE Open to third floor (glazed) 14 18 9 24 wardrobe Living room Bath closet Bedroom 1 wardrobe Living room 628.5’ FIRST FLOOR PLAN FLOOD WAY FLOOD WAY X-500YR AE-100YR AE-FLOOD WAY EXISITING BUILDINGS BUILDINGS ARE AT 644.5’ ABOVE FLOOD WAY EASEMENTS BUILDING HEIGHT LIMIT125’ KEY EGRESS STAIRS/ LIFTS EGRESS DOORS EGRESS PATH/ROUTE EASEMENTS BUILDING HEIGHT LIMIT: WITHIN ½ RESIDENTIAL FIRST FLOOR PLANS GALLERY RESIDENTIAL UNITS STUDIO SPACES 8 X-500yr AE-100yr AE- ood way existing buildings buildable area-H-125’ buildable area- H-35’ easements Base ood elevation-624’ Zero setbacks Zero setbacks Zero setbacks Buildable area H-35’ Buildable area H-125’ Storm Sewer: no structures permitted in storm sewer easement; landscape and site features are permitted. Gas easement: no structures permitted from grade to 25’. landscape, site features permitted; structures permitted above 25’. Flood: Show and call out the ood zones. Zero setbacks Zero setbacks
Assembly/showroom(945sf) wc. Ent.foyer Maintenance office Accessible wc. Warehouse Warehouse Storage, raw materials Sheepsheering Forge Assembly/showroom work area CNC area weavestoragearea cloak room generalwc. Retractable roof over outdoor work area WOOD WORKSHOP STONE WORKSHOP Bleachinganddryingarea Weavingandspinningarea Assembly/workarea(1612sf) FIBER WORKSHOP Assembly/showroom 40' 60' 622' RAMP UP 622' RAMP UP 623' RAMP UP RAMP UP 628'6" 628' 622' 625' Warehouse RAMP UP 622' METAL WORKSHOP Foyer Indoor work area welding Storage,finished product Garage RAMPDOWN 622' 708.57 8024.0 Bedroom 2 TERRACE Living room Bedroom 1 closet wardrobe LIMITBUILDING HEIGHT LIMIT35’ H LIMIT -35’ STORM SEWER NO CONSTRUCTION PERMITED GAS EASEMENT: NO STRUCTURES PERMITTED FROM GRADE TO 25’. HEIGHT LI • LIMIT: 125’; 55’ BLOCK OF RESIDENTIAL ZONE MIT Assembly/showroom(945sf) Café Gallery wc. Ent.foyer Maintenanceoffice Accessible wc. Warehouse Warehouse Storage, rawmaterials Sheepsheering Forge Assembly/showroom workarea CNCarea weavestoragearea cloakroom generalwc. Retractableroofoveroutdoorworkarea Chasing Storage WOOD WORKSHOP STONE WORKSHOP WORKSHOP Bleachinganddryingarea Weavingandspinningarea Assembly/workarea(1612sf) FIBER WORKSHOP Assembly/showroom Foyer Opentosecond floor RAMPup 10' 40' 60' 622' 622' RAMP UP 623' RAMP 627'RAMPUP RAMPup 625' RAMP UP 628'6" 628'6" 628' 622' 625' Warehouse 624' RAMP UP 622' METAL WORKSHOP Foyer Indoorworkarea welding Storage,finished product Garage RAMPDOWN 622' 1524.00 8024.08 19586.40 13 14 12 Open to sky Living room wc. RECEPTION BELOW Bedroom 1 closet wardrobe wardrobe Bath Kitchen wardrobe 628.5’ BUILDING HEIGHT LIMIT125’ BUILDING HEIGHT LIMIT35’ H LIMIT -35’ STORM SEWER NO CONSTRUCTION PERMITED GAS EASEMENT: NO STRUCTURES PERMITTED FROM GRADE TO 25’. BUILDING HEIGHT LI • HEIGHT LIMIT: 125’; 55’ WITHIN ½ BLOCK OF RESIDENTIAL ZONE MIT ENERGY ANALYSIS FILE STRUC. & MECH. FILE 24 23 21 19 17 16 15 13 12 11 10 5 4 1 23 22 21 11 20 19 17 16 15 13 12 10 8 7 5 24 22 20 18 17 14 13 11 10 9 8 6 1 3 4 5 GYM AREA BELOW Bedroom Bedroom 2 Bedroom 1 wardrobe wc. wardrobe Kitchen Living room Bedroom 2 Bedroom 1 closet wardrobe wc. Bath Kitchen Living room Bedroom bath Living room Open to third floor (glazed) 14 18 2 18 22 14 wardrobe wardrobe Bath closet 15 23 19 UP Living room STAFF STORAGE LAUNDRY GYM AREA SERVERY AREA TERRACE TERRACE TERRACE Café Gallery wc. Chasing casting ceramicshelling Patination FOUNDRY WORKSHOP TERRACE Open sky Open to sky Open to sky Open to second Opentosecond floor 624'RAMPup 10' 40' RAMP UP 624' 627'RAMPUP 625'RAMPup 624' 625' step down RAMP up 628'6" 624' RAMP DOWN 628'6" 628'6" 614' 626' 626' 626' 624' 626' RAMP up 624' Open to sky Foyer Café 3049.06 23 22 21 11 20 19 17 16 15 13 12 10 8 6 5 Open to sky Open to sky Open to sky Living room Kitchen Bath wc. wardrobe closet wardrobe Bedroom Bedroom 2 Bedroom 1 closet wardrobe wc. Living room Bedroom 2 Bedroom 1 wardrobe wc. wardrobe Kitchen Living room Bedroom 2 Bedroom 1 closet wardrobe wc. Kitchen Living room bath Bedroom wardrobe Bedroom bath Living room TERRACE Open to third floor (glazed) 14 18 9 24 wardrobe Living room Bath Kitchen closet Bedroom 1 wardrobe Living room 628.5’ FIRST FLOOR PLAN FLOOD WAY X-500YR AE-100YR AE-FLOOD WAY EXISITING BUILDINGS EASEMENTS BUILDING HEIGHT LIMIT125’ SHORT STAY RESIDENCE LONG STAY RESIDENCE STRUC. Assembly/showroom(945sf) DOWN UP COMMONS TERRACE TERRACE TERRACE Café Gallery wc. Ent.foyer Maintenance office Accessible wc. Warehouse Warehouse Storage, raw materials Sheepsheering Forge Assembly/showroom work area CNC area weavestoragearea cloak room generalwc. Retractable roof over outdoor work area Chasing casting ceramicshelling SculptureAssembly Storage Patination WOOD WORKSHOP STONE WORKSHOP FOUNDRY WORKSHOP Bleachinganddryingarea Weavingandspinningarea Assembly/workarea(1612sf) FIBER WORKSHOP Assembly/showroom Foyer Open to sky RECEPTION Open to second Opentosecond floor FOUNTAIN 624'RAMPup 10' 40' 60' RAMP UP 624' 622' RAMP UP 622' RAMP UP RAMP UP 627'RAMPUP 625'RAMPup 624' 625' step down RAMP up 628'6" 625' RAMP DOWN 628'6" 628'6" 628'6" 628' 622' 625' Warehouse 626' 624' 626' RAMP up 624' RAMP UP 622' METAL WORKSHOP Foyer waxmoulding Indoor work area welding Storage,finished product Garage Café DINING RAMPDOWN 622' 3049.06 1524.00 4708.57 8024. 19586.40 24 23 13 21 20 18 17 16 14 12 11 10 9 8 7 2 1 Open to sky Bedroom 2 Living room Kitchen Bath wc. wardrobe closet wardrobe Bedroom bath bath Bedroom wardrobe TERRACE 3 19 22 15 Living room Bedroom 1 wardrobe Living room 628.5’ FIRST FLOOR PLAN EXISITING BUILDINGS EASEMENTS BUILDING HEIGHT LIMIT125’ BUILDING HEIGHT LIMIT35’ EASEMENTS H LIMIT -35’ STORM SEWER NO CONSTRUCTION PERMITED GAS EASEMENT: NO STRUCTURES PERMITTED FROM GRADE TO 25’. BUILDING HEIGHT LI • HEIGHT LIMIT: 125’; 55’ WITHIN ½ BLOCK OF RESIDENTIAL ZONE MIT 23 22 21 11 20 19 17 16 15 13 12 10 7 6 24 22 21 18 17 16 14 12 11 10 9 6 4 5 Open floor Open to sky Open to sky Open to TERRACE wardrobe Bedroom bath Living room Living room bath Bedroom wardrobe Kitchen Bath wc. wardrobe closet GYM AREA BELOW wardrobe Bedroom bath Bedroom 2 Bedroom 1 closet wardrobe wc. wardrobe Bath Living room Bedroom 2 Bedroom 1 wardrobe wc. wardrobe Kitchen Living room Bedroom 2 Bedroom 1 closet wardrobe wc. Bath Kitchen Living room bath Bedroom wardrobe Bedroom bath Living room TERRACE Open to third floor (glazed) 14 18 9 24 wardrobe wardrobe Living room Bath Kitchen closet Bedroom 1 wardrobe TERRACE Living room 7 2 15 23 19 FIRST FLOOR PLAN FLOOD WAY X-500YR AE-100YR AE-FLOOD WAY EXISITING BUILDINGS EASEMENTS BUILDING HEIGHT LIMIT125’ KEY EGRESS STAIRS/ LIFTS EGRESS DOORS EGRESS PATH/ROUTE SHORT STAY RESIDENCE LONG STAY RESIDENCE WORKSHOP SPACES 1 & 2-BEDROOM LAYOUT REGULATION STANDARDS THAT SHAPED THE PROJECT PLANING SOLAR PV- TOOL USED- PVWATTS * CLEAR PVS. ON THE SKIN OF THE BUILDING FACING SOUTH * ROOFSCAPE SOLAR PANEL * SOLAR PANELS OVER PACKING LOTS * SOLAR TRACKING. 9
THE TEMPLE IS TO BE SEEN AS AN EXTENSION TO I.M PEI’S SCHEME OF CREATING A COHESIVE CIVIC SPACE WITHIN COLUMBUS ALONG FRANKLIN, 4TH & 5TH STREET , WHICH WE ARE NOW REFERRING TO AS A CAMPUS. THE PROJECT RESPONDED TO THE ETHOS THAT WAS ESTABLISHED BY OUR PREDECESSORS BY FOLLOWING THE COMMON LANGUAGE OF SUNKEN COURTYARDS, ASYMMETRY, AND DUALITY—A VOCABULARY PREVALENT IN HINDU CULTURE. THE BUILDING IS TO CONTRIBUTE TO THE OVERALL SENSE OF PLACE OF THIS AREA, WHILE STILL PROVIDING A SPACE FOR THE USERS OF THE TEMPLE TO ESCAPE THE TERRESTRIAL REALM INTO THE DOMAIN OF THE CELESTIAL—FINDING IDENTITY WITHIN CONFORMITY.
THE SUCCESS OF THIS PROJECT WAS A 4TH SEMESTER LONG DESIGN COLLABORATION BETWEEN I AND ALLAMEL, GUILLAUME, OF WHICH ALL THE IMAGES PRESENTED IN THIS PORTFOLIO HAS MY 90% INPUTES. IT WAS AN EQUAL COLLABORATION WITH MORE INFORMATION (9 SCHEMES IN TOTAL) WHICH CAN BE SHARED IF NEDED. (SOFTWARE-RHINO, ENSCAPE)
A TEMPLE FOR THE HINDU COMMUNITY WITHIN COLUMBUS IN. (Tool- Rhino, Enscape,) 03. RIG-VIDA TEMPLE (M.Arch year 2 spring semeaster) E S W N IDEA ITERATION 5
10
FINAL BUILDING IDEA SKETCH
RESIDENTIAL BUILDING
INSTITUTIONAL BUILDINGS
SUNKUN COURTYARDS
BUILDING ROOFS
PROPOSED SITE
ENRTY TO WORSHIP HALL, DESIGNED TO REDUCE THE LUMINOUSITY THAT GETS TO THE WORSHIP HALL
BUILDING MODEL MADE OUT OF TILES AND WOOD
SURROUNDING CONTEXT SKETCH DESIGN
COLLABORATION BETWEEN I AND ALLAMEL, GUILLAUME,
EQUAL COLLABORATION WITH MORE INFORMATION (9 SCHEMES IN TOTAL)
IT WAS AN
11
SITE
4THSTREET SITE OLDRAIL KEY ALLEY
5THSTREET
SITE PLAN UP UP UP S3 DN S2 DN UP FIRST CHRISTIAN CHURCH COMMERCIAL & RESIDENTIAL BUILDING 4TH STREET FRANKLIN STREET 12
SECOND FLOOR (WORSHIP) EAST SECTION AXONOMETRIC VIEW
FIRST FLOOR (EXHIBITION)
BASEMENT LEVEL 1 (CLASSROOMS)
BASEMENT LEVEL 2 (STORAGE)
OSB STRUCTURAL INSULATED PANELS SKYLIGHT 4" EXTRUDED POLYSTYRENE 6" EXTRUDED POLYSTYRENE LIMESTONE VENEER GUARDRAIL PRESTRESSED CONCRETE FLOORS VERTICAL L-PROFILE ALPHA VCI.45A SYSTEM PANEL SUBFRAMING SYSTEMF TERRACOTTA RAINSCREEN STRUCTURAL CLAY TILE TRIPLE PANE WINDOW CERAMIC MOSAIC TILE 5-PLY CLT FLOOR REINFORCED LIMESTONE COLUMNS CORRUGATED METAL PANEL ROOF W/ MOISTURE BARRIER UNDERLAYMENT OSB STRUCTURAL INSULATED PANELS 5/8" GYPSUM BOARD 5-1/8" WIDTH & 24" DEPTH GLULAM BEAM CANTILEVER CONCRETE RETENTION WALL
WALL SECTION
INTERIOR VIEW
AXONOMETRIC VIEW
HUMAN WANT IS GENERALLY IN-SATIABLE WHICH THEN BRINGS US TO THE CONCEPT OF NEED. THE FARMERS’ MARKET HERE IN COLUMBUS NEEDS A SEASONAL DESIGN THAT WILL SOLVE THE PROBLEM OF SHELTER FROM WEATHER AND EQUALLY PROVIDE THE FOLLOWING SOLUTIONS;
1. COMMERCE
2. FAMILY FUN AND ENTERTAINMENT
3. ADA COMPLIANT RESTROOMS
4. PRESERVATION OF TREES
IN LIGHT OF THIS, THE DESIGN TACKLES THE NEED TO BE A SEASONAL STRUCTURE AND ALSO INCORPORATE WEATHER ELEMENTS BY PROPOSING A CANOPY STRUCTURE WITH CURVES MIMICKING THE FLOW OF THE TRESS. THE CHOICE OF MATERIAL HERE IS INFLATABLES- POLYESTER FABRIC PRINTED WITH PHOTO-VOLTAIC CELLS. THIS HELPS THE STRUCTURE POWER THEMSELVES THUS ELIMINATING THE ELECTRIC POLES ON SITE. THIS CANOPY PROVIDES AN EPISODIC EXPERIENCE THROUGH THE UNDULATION OF THE RIBS, THE SIDEWAYS SHIFTS OF THE BAYS, AND THE VERTICAL/HORIZONTAL MOVEMENT OF THE CANOPY CURVES.
THE TRANSITION POINTS ALONG THE CURVES WERE TRANSPARENT, GIVING LIGHT RAYS INTO THE BAYS, THE TREE TRUNKS ARE EQUALLY ACCOMMODATED BY THE FABRIC MATERIAL AT POINTS OF INTERSECTIONS, MAKING THE FARMERS AND BUYERS HAVE A SENSE OF AN ACTUAL FARM. THIS REALLY IS A POETIC EXPERIENCE IN ITSELF.
CONCEPTUAL SKETCHES
2ND STREET PARKING LOT IS A SEASONAL MARKET IN COLUMBUS IN, AN INFLATABLE CANOPY WAS PROPOSED. (Tool- AUTOCAD,Rhino, Revit, Lumion)
04. FAMERS MARKET
year 1 Fall semeaster)
(M.Arch
14
GENTS & STORAGE PLAN NORTH/SOUTH ELEVATION EAST ELEVATION FURNITURE LAYOUT PLAN LAYOUT STORAGE LADIES/GENTS CIRCULATION 15
NORTH-WEST ELEVATION RENDERING DONE BY CSO
PROJECT TITLE: DEPARTMENT OF PUBLIC WORKS (DPW), SANITATION GARAGE & ADMINISTRATIVE BUILDING.
DATE: MAY- JULY 2023
BRIEF SUMMARY: THE PROJECT REQUIRED THE CONSTRUCTION OF A NEW GARAGE PARKING FOR BIGGER TRUCKS, ALONG SIDE IS THE PROVISON OF AN ADMINISTRATIVE BUILDING AS WELL AS A TRUCK WASH AREA.
ROLE IN THE PROJECT-
1. REDUCE THE SQUARE FOOTAGE OF THE OFFICE BUILDING TO THE ADJUSTMENTS MADE BY THE CLIENT
2. GENERATE WORKING DRAWINGS AND DETAILS BASED ON CODE
3. MEET WITH OTHER STAKE HOLDERS ON THE PROJECT, MAKE ADJUSTMENTS AND CONSOLIDATE DRAWIINGS FROM OTHER CONSULTANTS ON THE PROJECT.
THIS IS A PROJECT UNDERTAKEN AT CSO ARCHITECTS INC.- ROLE- I WORKED ON THE CD & DD WITH LUKE FLEA, DEAN TRAUNER & JOE RAPER. MAY-JULY 2023-(Tool- Revit) (MAY-JULY2023)
05. DPW. GARAGE & OFFICE BUILDING ELEVATION
(OFFICE BUILDING)
16
OFFICE & GARAGE BUILDING PLAN LOCKER ROOM (GARAGE BUILDING)
OFFICE BUILDING GARAGE LOCKER ROOM / RESTROOM GARAGE BUILDING 17
SECTION (GARAGE BUILDING) CARWASH PLAN & SECTION (GARAGE BUILDING)
PARK RENDERING
CLIENT- WHITE AVENUE REAL ESTATE LTD.
LOCATION- OPP. MILITARY PENSION BOARD, FO1 KUBWA ABUJA
TITLE- HOUSING ESTATE
HOUSE TYPES-
2- BEDROOM TERRACE DUPLEX
3- BEDROOM TERRACE DUPLEX
4- BEDROOM TERRACE DUPLEX
4- BEDROOM SEMI-DETACHED DUPLEX
5- BEDROOM FULLY DETACHED DUPLEX (THERE ARE 111 RESIDENCES ON 6.03 HECTARES OUT OF 20 HECTARES FOR PHASE 1 OF THE PROJECT.
ALL UNITS ARE SUPERVISED BY ME FROM FOUNDATION TO FINISHES.
TIMELINE- JUNE 2018-JANUARY 2021
ROLE IN THE PROJECT-
A- SERVED AS THE SUPERVISING ARCHITECT FOR THE SITE FROM FOUNDATION TO FINISHES IN COMPANY OF ENGR. SOLA T. THE SITE ENGINEER (STRUCTURAL ENGINEER) AND OTHER PROFESSIONALS, ARCHITECTS INCLUSIVE.
B- WORKED ON ALL THE TWO DIMENTIONAL DRAWINGS AS REVISED ON SITE AND MODIFICATION REVIEWS PER UNIT BASED ON CLIENTS NEEDS.
C- PRODUCED THE WORKING DRAWINGS
D- WORKED ON SOME OF THE THREE DIMENTIONAL DRAWINGS
TIMELINE- JUNE 2018-JANUARY 2021
06. CEDARWOOD CITY (JUNE 2018-AUGUST 2021)
THIS IS A
PROJECT UNDERTAKEN AT WHITE AVENUE GROUP. ROLE- I WORKED ON THE PCD, DD, CD, RENDERS &CONST. SUPERVISION WITH ADULHAFEEZE TIMILEHIN-(TOOL REVIT, LUMION)
4-BEDROOM TERRACE DUPLEX AT FIRST FLOOR
4-BEDROOM TERRACE DUPLEX AT SECOND FLOOR
4-BEDROOM TERRACE DUPLEX BEDROOM INTERIOR MODEL
4-BEDROOM TERRACE DUPLEX BEDROOM AT COMPLETION
18
LOUNGE ENTRANCE DINING WC WAITING GUEST WC/SHO LOUNGE ENTRANCE DINING WC WAITING GUEST WC/SHO WC WAITING GUEST BEDROOM 1 WC/SHO LOUNGE ENTRANCE DINING WC WAITING GUEST WC/SHO GROUND FLOOR PLAN 3 BEDROOM TERRACE DUPLEX + BQ 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 4130 1950 4580 1500 1500 4580 1950 4130 4130 1950 4580 1500 1500 4580 1950 4130 980 2400 670 2180 1200 150 1200 680 1200 1270 3900 150 3150 150 3080 1310 1580 600 900 230 3300 230 6970 230 12695 14195 750 4350 150 1270 A B D C F G E 2260 2400 230 3740 1200 4940 200 900 2030 3150 1500 4800 1500 3530 4940 1735 830 1430 230 4710 3380 900 980 2400 670 300 300 2030 300 750 380 835 900 900 130 900 780 1200 600 900 1650 3300 3590 1430 1150 2250 1870 1350 LOUNGE ENTRANCE DINING WC WAITING GUEST WC/SHO LOUNGE ENTRANCE DINING WC WAITING GUEST WC/SHO 18 19 20 21 22 23 24 25 4130 1950 4580 1500 1500 4580 1950 4130 MASTER BEDROOM 2 25 STORE STORE STORE STORE STORE STORE A A PARK AT CONSTRUCTION STAGE SITE LAYOUT AT CONSTRUCTION 4-BEDROOM TERRACE DUPLEX AT PLASTERING STAGE 4-BEDROOM TERRACE DUPLEX AT PLASTERING STAGE GROUND FLOOR PLAN, 4-BEDROOM TERRACE DUPLEX A 6.03 HA OF LAND OUT OF 25HA DEVELOPED BY ME. THE PARK WAS THE MOST CHALLENGING ASPECT OF THE SITE DUE TO THE SOIL TYPE AND AQUIFA LEVEL 19
OLUYOMI AFOLAYAN]
[ESTHER
Architecture Portfolio estheroluyomiafolayan@gmail.com