TURBOswiss

Page 1

THE FLOOD CONTROL SYSTEM WITH THE SHORTEST ASSEMBLY TIME EVER


Flood Control Systems

TURBOswiss Flood Control Systems fight floods by means of

Smart and Stable Construction

water-filled barriers that can be set up at just any place in a

plus Intuitive Handling

minimum of time and with a minimum of efforts. One barrier

TURBOswiss System’s centerpiece is the BIG BOX lock element. Intuitive

consists of two parallel tubes made from special, heavy-duty

handling and reliability are basic conditions for a system’s quick and suc-

tarpaulin, featuring a barrage height of 94 cm. As standard,

cessful deployment in disaster situations.

the tubes are 25 meters long. A unique, patented coupling

Tried and tested prefab components ensure a high level of functional reli-

system / lock element allows for setting up barriers of any

ability. For rescue forces, this means well-known interfaces, familiar and

given length and facilitates changing directions into all 3 di-

frequently rehearsed procedures, and fast assembly – in short: safe and

mensions at any given point, without the need of deploying

intuitive handling! The main element consists of high-quality, anodized bent

any specific components. TURBOswiss barriers can be set

aluminum sheet components, riveted to a high-tensile construction by means

up in any kind of terrain and on any kind of surface without

of various cross-beams. The smart combination of prefab components and

any fastening or support. TURBOswiss Flood Control Sys-

specifically designed elements facilitates most efficient design and produc-

tems stand out by extremely short assembly times, most easy

tion efforts and expenses.

handling, smart details, and premium quality. They were de-

—––––––––––––——————

signed by a team, which contributed its longstanding experience, profound product know-how, and unique expertise in order to achieve various improvements:

The BIG BOX lock element is the core of TURBOswiss System: intuitive handling and reliable function

• quick and simple assembly (no time-consuming blow-up operations – extremely short assembly times) • most simple handling (assembly/disassembly without any efforts

thanks to TURBOswiss Caddy)

• improved watertightness of joints • in- and outlets freely accessible at any time • minor staff requirements – only 2 people needed for assembly • easily storable even in confined spaces • field use without any fastening • requires no elbow elements and doesn’t comprise any loose parts • allows for leaving passages that are closed shortly before the flood • ATTRACTIVE HIRE-PURCHASE OPTIONS AVAILABLE TURBOswiss means the consequent advancement and improvement of existing systems – faster to assemble and easier to handle!

—–––––––––––—————— Tried and tested prefab elements ensure the system’s major functions

—–––––––––––—————— Well-known components facilitate rehearsed procedures, quick assembly, plus safe and intuitive handling


In the Field

—–––––––––––——————

—–––––––––––——————

TURBO Caddy serves

… into BIG BOX lock

to transport the large

element.

barrage tubes to the terrain endangered.

—–––––––––––——————

—–––––––––––——————

The tubes are laid out

Positioning the hand

in parallel…

gears serves to fill the tubes as required. This allows for leaving passages open as long as possible.

—–––––––––––——————

—–––––––––––——————

… and connected to

A spraying fountain

each other by the

indicates that the

lock.

operating pressure has been achieved and filling is thus completed.

—–––––––––––——————

—–––––––––––——————

Standard components

After only 50 minu-

facilitate easy and

tes, the 75 meter long

intuitive handling.

and nearly 1 meter high barrier of 100 tons is ready to face the flood.

—–––––––––––——————

—–––––––––––——————

Carbines serve

The flooding has

to connect both

been reached – and

tubes to each other

the barrier stands up

lengthwise; the ends

against it.

are equipped with outlets.

—–––––––––––——————

—–––––––––––——————

The commander

The commander is

orders the water

checking the system.

pumps.

—–––––––––––——————

—–––––––––––——————

From waters nearby,

When the flood has

water is pumped

passed, the water

through the fire hoses

is drained from the

tubes. Within 30 minutes only, the entire system is being disassembled.


The system in Comparison

TURBOswiss Flood Control Systems are an internation-

Assembly time:

ally patented flood fighting advancement by tubes.

water-filled tube systems

6 men, equipped with 2 pumps, will need about 50

laying out

blowing up

filling with water

minutes to set up barriers of 75 meters length and a

—————————————————————————————————

protective height of 94 cm. A similar bank made from

TURBO®swiss

sand bags requires approx. 80 tons of sand to be trans-

laying out blowing up

ported, filled to 4500 – 5000 sand bags, and then piled up. Without having any recreational breaks, 60 men will need about 8 hours to realize this.

Possible BIG BOX Application

TURBOSWISS c/o Proventus AG Bärematt 19 6017 Ruswil Switzerland www.turboswiss.ch bfw@turboswiss.ch

time saved


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.