Erica Frank Architecture Portfolio 2024

Page 1


Erica Frank

PO RTF O LI O
R EGI S TERED ARCHITEC T
CARNEGIE MELL O N UNIVER S ITY, 2018

elfrank@alumni.cmu.edu | 773-850-9847

ericalynnfrank.squarespace.com | @ericarves

HIGHLIGHTED PROJECTS

| DLR GROUP | 2023

| DLR GROUP | 2022

| DLR GROUP | 2022

SUPPLEMENTAL

| DLR GROUP | 2019

| DLR GROUP | 2021

| DLR GROUP| 2020

| 2015 - present

| 2019 - 2024

Athletic Center Expansion

A. WARMING HUT & BAR SIT BY THE REAR TERRACE

EXISTING TENNIS BARN

RECEPTION

SINGLES SQUASH COURT 2

SINGLES SQUASH COURT 4 STAIR 1

RACQUETBALL COURT 1

DOUBLES SQUASH COURT 1

CORRIDOR / VIEWING SEATING

GOLF PRACTICE ROOM

SINGLES SQUASH COURT 1

*See following page for E, F, & G

SINGLES SQUASH COURT 3

SINGLES SQUASH COURT 5

BIORETENTION

Clubhouse Renovations

Tap Room & Terrace

TAP ROOM
TAP ROOM KITCHEN
LOCKER ROOM
BRADLEY HOUSE
CANTEEN
DRAWING ROOM
FRONT LOBBY
SUN PORCH
TERRACE ROOM
MARYLAND ROOM
BANDSTAND
MAIN KITCHEN
POOL CANTEEN

TERRACE

EXISTING TERRACE

LOUNGE SPACE

Renders by I. Nafpliotis

GUARDRAIL PLAN DETAILS

CABLES AT STONE PIER
CABLES AT POST

School Campus Master Plan

NEEDS ASSESSMENT

campus is performed as part of Phase I of the Master Plan, as shown in the by interviews, surveys, and site analysis, projects. Samples shown below.

current/future needs

DORM QUAD

Phase 2: Design/Synthesis

Identify Potential Sites Identify Opportunities & Constraints

Establish Scope Distribute/ Analyze Questionnaire Interview Key People/ Groups Develop Programmatic Diagrams

Illustrated below

DEMO EXISTING DORMS (3) DEMO EXISTING DORMS

ARTS SITE 1

ARTS ALT. 2

PERFORMING
PERFORMING
NEW DORM SITE 1
NEW DORM ALT. 2

Prepare Draft Text Prepare Draft Graphics

Validate Program Adherence “Living Document” Update Draft RFP Final Master Plan Document Phase 3: Final DocumentationPhase 4: Implementation

CAMPUS NORTHERN ENTRANCE

Public Road

Pedestrian Gateway Legend

Campus Vehicular Road

Pedestrian Pathway

Car-Free Zone

Campus Entry

CAMPUS THIRD ENTRANCE

CAMPUS SECONDARY ENTRANCE

1A. Renovate/create gathering space

1B. New facility

1C.

1D. Renovate

1E.

1F.

2A. 2B.

3A. Renovate

3B. Renovate toilets

3C.

3D. New facility

3E.

3F.

3G.

4A.

PROPOSED

5A. New facility

5B. 5C.

3D

Supplemental Projects

Elementary School Addition

a new entrance creates a environment.

FRONT ENTRY ELEVATION

FRONT ENTRY PLAN

EXTENTS OF STUDENT TILES (CWT-3)

STUDENT TILE WALL ELEVATION

3/4" TOP AND BOTTOM RAILS WELDED TO STEEL POSTS

2"X3/4" "FLAT-TOP WEAVE" WOVEN WIRE MESH PANEL -.135GA (NO CRIMPS) BOD MCNICHOLSON CO. 3/4" W X 2" H PTD STEEL PLATE

1/32" THICK WELDED BENT PLATES @ PANEL EDGES

O.C. MAX

Upper School Renovation

Dormitory Renovation & Expansion

E -NORTH/SOUTH -EXISTING WALL ROOF

Craft & Fabrication

useful way.

1. Camille & Alex

Volunteer

NEW SINGLE ROLLER SHADE (ADD ALT)

NEW WALL PAINT (ALL)

CHAIR RAIL, V.I.F. RETURN C.RAIL TO WALL

NEW 60"x18" TABLES (FLIP-TOP, CASTER-BASE)

NEW FLOORING (RESILIENT)

NEW CHAIRS (SLED-BASE)

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.