

Erica Frank
PO RTF O LI O
R EGI S TERED ARCHITEC T
CARNEGIE MELL O N UNIVER S ITY, 2018
elfrank@alumni.cmu.edu | 773-850-9847
ericalynnfrank.squarespace.com | @ericarves
HIGHLIGHTED PROJECTS
| DLR GROUP | 2023
| DLR GROUP | 2022
| DLR GROUP | 2022
SUPPLEMENTAL
| DLR GROUP | 2019
| DLR GROUP | 2021
| DLR GROUP| 2020
| 2015 - present
| 2019 - 2024
Athletic Center Expansion





A. WARMING HUT & BAR SIT BY THE REAR TERRACE
EXISTING TENNIS BARN



RECEPTION
SINGLES SQUASH COURT 2
SINGLES SQUASH COURT 4 STAIR 1



RACQUETBALL COURT 1
DOUBLES SQUASH COURT 1

CORRIDOR / VIEWING SEATING
GOLF PRACTICE ROOM

SINGLES SQUASH COURT 1
*See following page for E, F, & G

SINGLES SQUASH COURT 3
SINGLES SQUASH COURT 5
BIORETENTION





























Clubhouse Renovations
Tap Room & Terrace

















TAP ROOM
TAP ROOM KITCHEN
LOCKER ROOM
BRADLEY HOUSE

CANTEEN
DRAWING ROOM
FRONT LOBBY
SUN PORCH
TERRACE ROOM
MARYLAND ROOM
BANDSTAND
MAIN KITCHEN
POOL CANTEEN
TERRACE
EXISTING TERRACE
LOUNGE SPACE



Renders by I. Nafpliotis


GUARDRAIL PLAN DETAILS
CABLES AT STONE PIER
CABLES AT POST


School Campus Master Plan


NEEDS ASSESSMENT

campus is performed as part of Phase I of the Master Plan, as shown in the by interviews, surveys, and site analysis, projects. Samples shown below.


current/future needs


DORM QUAD

Phase 2: Design/Synthesis
Identify Potential Sites Identify Opportunities & Constraints
Establish Scope Distribute/ Analyze Questionnaire Interview Key People/ Groups Develop Programmatic Diagrams
Illustrated below





DEMO EXISTING DORMS (3) DEMO EXISTING DORMS


ARTS SITE 1




ARTS ALT. 2


PERFORMING
PERFORMING
NEW DORM SITE 1
NEW DORM ALT. 2
Prepare Draft Text Prepare Draft Graphics
Validate Program Adherence “Living Document” Update Draft RFP Final Master Plan Document Phase 3: Final DocumentationPhase 4: Implementation


CAMPUS NORTHERN ENTRANCE



Public Road
Pedestrian Gateway Legend
Campus Vehicular Road
Pedestrian Pathway
Car-Free Zone
Campus Entry
CAMPUS THIRD ENTRANCE

CAMPUS SECONDARY ENTRANCE























1A. Renovate/create gathering space
1B. New facility
1C.
1D. Renovate
1E.
1F.


2A. 2B.
3A. Renovate
3B. Renovate toilets
3C.
3D. New facility
3E.
3F.
3G.
4A.

PROPOSED

5A. New facility
5B. 5C.

3D
Supplemental Projects
Elementary School Addition
a new entrance creates a environment.
FRONT ENTRY ELEVATION
FRONT ENTRY PLAN
EXTENTS OF STUDENT TILES (CWT-3)
STUDENT TILE WALL ELEVATION



3/4" TOP AND BOTTOM RAILS WELDED TO STEEL POSTS
2"X3/4" "FLAT-TOP WEAVE" WOVEN WIRE MESH PANEL -.135GA (NO CRIMPS) BOD MCNICHOLSON CO. 3/4" W X 2" H PTD STEEL PLATE
1/32" THICK WELDED BENT PLATES @ PANEL EDGES
O.C. MAX






Upper School Renovation



























Dormitory Renovation & Expansion
















E -NORTH/SOUTH -EXISTING WALL ROOF














































































































































Craft & Fabrication
useful way.
1. Camille & Alex
Volunteer





NEW SINGLE ROLLER SHADE (ADD ALT)









NEW WALL PAINT (ALL)
CHAIR RAIL, V.I.F. RETURN C.RAIL TO WALL



NEW 60"x18" TABLES (FLIP-TOP, CASTER-BASE)







NEW FLOORING (RESILIENT)

NEW CHAIRS (SLED-BASE)






