Enchanted Rock delivers much cleaner resiliency at the same or lower cost. Enchanted Rock utilization of RNG -> carbon neutral or negative resiliency. Power Secure will always have a positive CI score.

Enchanted Rock has 10+ years experience optimizing BTM assets in the market. Power Secure lacks this expertise & outsources the function.

COMPETITOR: PALM ENERGY

Enchanted Rock Positioning Against Competitor

Palm Energy was founded in 2020 -> don’t have the expertise and track record that Enchanted Rock has.

Palm Energy has many different service offerings à lack of focus makes it challenging to deliver high levels of resiliency.

COMPETITOR: RPOWER

Enchanted Rock Positioning Against Competitor

RPower was founded in 2021 -> little operational experience to prove resiliency capabilities. Financial risk associated with market revenue programs falls on the customer with RPower. Conversely, Enchanted Rock maintains this risk for customers.

Rpower uses third-party O&M vendors and Shell’s NOC to monitor the generators. Enchanted Rock maintains best in class performance due to the vertical integration and close coordination between NOC and field maintenance teams.

4

COMPETITOR: BLOOM ENERGY*

Enchanted Rock Positioning Against Competitor

Bloom has to run 24/7 so they are competing with grid prices. Solution only suitable where retail power is expensive and/or there are subsidies.

Bloom’s fuel cell isn’t suited for resiliency applications -> cannot meet transient or start time requirements on its own.

Bloom’s fuel cell requires 2x the space of Enchanted Rock generators.

COMPETITOR: PLUG POWER*

Enchanted Rock Positioning Against Competitor

Plug Power is significantly more expensive at ~$2500/kw.

Enchanted Rock’s generators have a more compact footprint than Plug’s fuel cells.

COMPETITOR: MAINSPRING*

Enchanted Rock Positioning Against Competitor

Mainspring is not ready for resiliency operations -> generators don’t meet transient or start time requirements.

Mainspring generators require 4x the space of Enchanted Rock generators.

Mainspring is significantly more expensive -> low production volumes and in-house cost structure in California.

5

ENCHANTED ROCK COMPETITIVE POSITIONING

Competitionistryingtomovetotherightand up,towardsthemarketthatEnchantedRockhas established

Thecombinationofreputation/trackrecord+ verylargeinstalledbase+GraniteOS™+ InnovationCycle+winningattitudeensuresthat EnchantedRockwillstayaheadofthemarket

6

SERVICE OFFERING OVERVIEW

Enchanted Rock World Class O&M

8

“HUB & SPOKE” O&M MODEL IMPROVES AVAILABILITY AND PROBLEM RESOLUTION

“HUB & SPOKE” O&M MODEL IMPROVES AVAILABILITY AND PROBLEM RESOLUTION

Network Operations Center (NOC) serves as central knowledge Hub and regional O&M team as field work Spokes

24/7 monitoring of all site assets and equipment performance

Data collection/analytics from large fleet allows for proactive issue identification and continuous improvement

24/7 access to “factory” subject matter experts.

STANDARDIZATION OF EQUIPMENT & PROCESSES REDUCED COST AND DOWNTIME

All technicians trained for any site to reduces maintenance and repair time.

Equipment designed so maintenance can performed by a single technician without any specialized equipment or tools.

Simplified spare part inventory management.

ROBUST MAINTENANCE SCHEDULE AND PRACTICES ASSURES HIGH PERFORMANCE

Qualified technicians trained and certified on standard processes

All factory maintenance and periodic loaded testing performed and documented

99.9994% combined reliability across fleet.

9

RESILIENCY TECHNOLOGY COMPARISON

5 ` DIESEL – EPA TIER 2 PRIMARY USE CASE CARBON NEUTRAL OPTIONS CAPEX ($/KW) LOCAL EMISSIONS OUTAGE DURATION START TIME CAPEX ($) RESILIENCY ONLY NO ~24 HOURS, DEPENDS ON TANK SIZE HIGH <10 SECONDS 500 – 600 $ SOLAR + STORAGE LOCAL GENERATION AND TIME SHIFTING YES 2 – 4 HOURS ZERO <1 SECOND 1,500 – 2,500 $$$ PEM FUEL CELLS W/ ONSITE STORAGE BRIDGE POWER YES, WITH GREEN H2 ~24 HOURS, DEPENDS ON TANK SIZE ZERO MINUTES 1,750 – 2,000 $$$ LEAN BURN NATURAL GAS PRIME POWER + PEAK SHAVING RNG INFINITE MODERATE W/ SRC <1 MINUTE 900 – 1,200 $ DIESEL – EPA TIER 4 RESILIENCY W/ LIMITED PEAK SHAVING NO ~24 HOURS, DEPENDS ON TANK SIZE MODERATE W/ SRC <10 SECONDS 700 – 800 $ LINEAR GENERATOR RENEWABLE FIRMING + PEAK SHAVING RNG, H2 INFINITE LOW <10 SECOND 1,100 – 1,400 $$ SOLID OXIDE FUEL CELLS PRIME POWER RNG INFINITE ULTRALOW MEETINGCARB DGLIMITS HOURS 2,200 – 2,500 $$$ RICH BURN NATURAL GAS RESILIENCY+ PEAKSHAVING +GRID SERVICES RNG, H2 BLENDING INFINITE ULTRALOW MEETINGCARB DGLIMITS <10 SECOND 900 -1,200 $ Why Enchanted
? MoreReliable Fullyintegrated turnkeyservice Standardized, modulardesign Quiet&compact footprint Proventrack record
Rock
12

23 MICROGRID PROJECTS TO WATCH IN 2023

MICROUTILITIES*

MicrogridProvider:

ProjectDescription:

PrimaryUseCase:

Technology:

SunnovaEnergy

Toavoidtheconflictofmicogridinstallationswithconventionalutilitymodel,Sunnovaisimplementingmicroutilitiesthat willoperatemicrogridsinnewlybuiltCalifornianeighborhoodsoffewerthan2,000customers.

Prime+BackupPower

Generation,batterystorage,solar

MicrogridProvider:

ProjectDescription:

PrimaryUseCase:

Technology:

Size: Size:

MicrogridProvider:

ProjectDescription:

PrimaryUseCase:

Size:

CompassEnergy

CuyahogaCounty,Ohioiscreatingitsownmicrogrid-friendlyutility.TheyhaveselectedCompassEnergyastheirpartner toprocureandhelpfinancemicrogridsforvariouscitiestoencourageeconomicactivityandimproveenergyresilience.

Prime+BackupPower

TBD

MicrogridProvider:

ProjectDescription:

PrimaryUseCase:

Technology:

Size:

OhmGrid

Inresponsetochallenginginterconnectionprocessesandregulatoryframework,OhmGridinstallsresidentialmulti-assetmicrogridsto helphomeownersbecomeenergyindependent.

PrimePower

Technology: Various

Solar,storage,backupgeneration

Entergyisconsideringinstalling10utilitymicrogridsaspartofits10-yearresilienceplanwhich addressesrisksposedbyextremeweatherevents.

BackupPower

NGmicrogrid

Various Various Various

14
Entergy
MICROGRID-FRIENDLY UTILITY* 10 UTILITY MICROGRIDS* OFF-GRID MICROGRIDS

6 MICROGRIDS AT BIMBO BAKERIES

MicrogridProvider:

ProjectDescription:

Greenstruxure

Toachieveamorereliableelectricsupplyandmeetsustainabilitygoals, Bimbobakeries is installingmicrogridsat6oftheirmanufacturing facilities.Whilethebakeriesarelocatedinanareapronetopower outages(CA),theirmotivationforimplementingmicrogridsistomeet carbonreductiongoals.

PrimaryUseCase:

Technology:

Size:

Localgeneration,peakshaving

Solar,batterystorage

PRIME POWER MICROGRID AT TAYLOR FARMS FACILITY

MicrogridProvider:

ProjectDescription:

PrimaryUseCase:

Technology:

Size:

BloomEnergy,Ameresco,ConceptCleanEnergy

A10MWmicrogridwillbeinstalledataTaylorFarmsfoodproduction facilityinresponsetogridreliabilityissuesandhighgridpowercosts. Themicrogridwilleventuallyrunindependentfromthegrid.

PrimePower

Fuelcell,solar,battery

OFF-GRID MICROGRID AT COLD STORAGE FACILITY

MicrogridProvider:

ProjectDescription:

PrimaryUseCase:

Technology:

Size:

ScaleMicrogrid

Duetoenergyshortfallsandextremeweatherthataffectthereliability ofthelocal grid,AlmondWorldispursuingcheaper,cleanerandmore reliablepowertosupporttheirfacility’stwo250,000squarefoot coldstoragebuildings.

Prime+backuppower

Solar,battery,generation

3.6MW

LARGEST RNG MICROGRID FOR MICROSOFT*

MicrogridProvider:

ProjectDescription:

PrimaryUseCase:

Technology:

Size:

EnchantedRock

MicrosoftisinstallingamicrogridattheirSanJosefacilitythatdelivershighlevelsof reliabilitywhilealsosupportingtheirESGinitiativesand broader gridstability.

Backuppower

NGmicrogrid

Various 10MW 60MW

15

GOOGLE MICROGRID

MicrogridProvider:

ProjectDescription:

SunnovaEnergy

TheCityofSanJosevotedtotakenextstepinreviewingamicrogridplannedby Google, aspartofalargerplantodecarbonizethecity andcreatemorelocalenergy.Themicrogridwillsupportan81-acre mix-usedevelopment.

PrimaryUseCase:

Technology:

Localgeneration

Solar,batterystorage,dieselgenerators

JACKSONVILLE, NC MILITARY MICROGRID

MicrogridProvider:

ProjectDescription:

PrimaryUseCase:

Technology:

Size: Size:

DukeEnergy

CampLejeuneisthelargestMarineinstallationintheworldandaccountsfor nearly 20%ofMarineenergyconsumption.A10+MWmicrogrid willbeinstalledtofurtherthereliability,resilienceandefficiency ofCampLejeune’selectricalinfrastructureandon-sitegeneration capabilities

Backuppower

Batterystorage,NGgeneration

Unknown 10+MW

NJ MILITARY BASE MICROGRID

MicrogridProvider:

ProjectDescription:

PrimaryUseCase:

Technology:

Size:

Ameresco

Amerescoisinstallingamicrogridatthismilitarybasetoensureuninterrupted powerforcriticaloperationsandtosupportfederalclimate initiativeeffortstoreduceemissionsandacceleratetheenergytransition.

Backuppower

Solar,batterystorage,backupgeneration

US NAVY BASE MICROGRID

MicrogridProvider:

ProjectDescription:

PrimaryUseCase:

Technology:

Size:

FuelCellEnergy

TheNavalbaseinstalledafuelcellaspartofitslargeronsiteco-generationcapacity andmicrogridsystemtosupportmissioncriticalpower requirements.

Primepower

Fuelcell

16
6MW
34+MW

NESTED COMMUNITY MICROGRID

MicrogridProvider:

ProjectDescription:

PrimaryUseCase:

Technology:

SchneiderElectric,KBHome,SunPower

Eachhomeinthiscommunitywillhaveitsownnanogridthatisconnectedtoacentralmicrogrid.Thecentral microgridconnectstwoneighborhoodsforenergysharing.

Primepowerpower

Batterystorage,solar

Various

BIDIRECTIONAL, INTERCONNECTED MICROGRIDS

MicrogridProvider:

ProjectDescription:

PrimaryUseCase:

Size: Size:

SandiaNationalLaboratories+EmeraTechnologies

TheDOEisfundingthisprojecttotesthowdirectcurrent(DC)microgridscanbeintegratedintothecurrentAC electricalsystemtoprovideresilientpowertohomesandmilitaryinstallations.

Localgeneration,backuppower

Solar,batterystorage,NGgeneration,EVcharger

TBD

WORLD’S LARGEST

RENEWABLE

MICROGRID

MicrogridProvider:

ProjectDescription:

PrimaryUseCase:

Technology:

Size:

TBD

Inanefforttoreach100%renewablepowerattheremotemine,OzMineralsisprocuringa150+MWmicrogrid consistingofsolar,wind,andbatterystorage.

Primepower

Solar,wind,batterystorage.

150MW

COASTAL AND ISLAND MICROGRIDS

MicrogridProvider:

ProjectDescription:

PrimaryUseCase:

Technology: Technology:

Size:

BMT

Inanefforttocleanupdiesel,BMTisdevelopingcoastalmicrogridsthatutilizetidalenergyandother renewableresources.

Primepower

Tidalenergy,solar,loadbanks,dieselgeneration

TBD

17

EV MICROGIRD

MicrogridProvider:

ProjectDescription:

PrimaryUseCase:

SchneiderElectric,ACTransit

TheCaliforniaEnergyCommissionisfundingthisprojecttodemonstratethevalueofbidirectionalelectricvehiclechargingtomakeavehicle-to-building(V2B) resiliencehubatthelibrary.Electricbuseswillstoreanddischargeelectricitytopowerfilteredairconditioningandcriticalservicesatalocallibraryduring outages.

Size:

COMMUNITY SOLAR MICROGRID

MicrogridProvider:

ProjectDescription:

PrimaryUseCase:

Size:

MICROGRIDS FOR UKRAINE

MicrogridProvider:

ProjectDescription:

PrimaryUseCase:

Technology:

Size:

Inanefforttoreach100%renewablepowerattheremotemine,OzMineralsisprocuringa150+MWmicrogridconsistingofsolar,wind,andbatterystorage.

SOLAR MICROGRIDS FOR ETHIOPIA

MicrogridProvider:

ProjectDescription:

PrimaryUseCase:

Technology: Technology: Technology:

Size:

ApilotprojectbytheDREAMinitiativehaslaunchedninesolarminigridpoweredlargescaleirrigationsystemsinEthiopiainanefforttoreplacedieselgenerators andpumpwaterwithreliable,cleanandaffordableelectricity.

18
NewUserEnergyisseekingtodelivermicrogridspoweredbyportablesolarandbatterystoragetoprovidepowertoUkraineastheirelectricsystemisunderattack.
NewUseEnergy DREAMinitiative TBD Backuppower Primepower Backuppower Primepower Batteryelectricbuses,solar Solar,batterystorage, Solar Solar,wind,batterystorage. Unknown TBD TBD 150MW

OREGON COMMUNITY MICROGRIDS

MicrogridProvider:

ProjectDescription:

PrimaryUseCase:

Technology:

PGE

Oregonisimplementingtwocommunitymicrogridstostrengthenresiliencyandcombattheeffectsofclimatechange.PGEownsand operatesbatteriesBTMatcustomersites,andthecustomersprovidesolarandotheron-siteresourcestocreatemicrogrids

Backuppower

Batterystorage,solar

Various Size:

PORT OF LONG BEACH MICROGRID

MicrogridProvider:

ProjectDescription:

SchneiderElectric

Schneiderisdevelopingamicrogridthatwillprovidereliable,zero-emissionselectricityforthePortofLongBeach’sJointCommandand ControlCenter.Thismicrogridwillsupporteffortstomoveawayfromdieselandreduceelectricitycosts.

PrimaryUseCase:

Technology:

Size:

Backuppower

Solar,batterystorage

750kW

DOMINICAN REPUBLIC SOLAR MICROGRID

MicrogridProvider:

ProjectDescription:

GermanAgencyforInternationalCooperation

Residentsarehopingthatelectrificationthroughasolarmicrogridwill helpthetownaddresspopulationflight,economicchallengesand worriesaboutbeinghitbyintensestormsandhurricanes.

PrimaryUseCase:

Technology:

Size:

Primepower

Solar,wind,batterystorage.

~200kW

19
713-429-4091 info@enchantedrock.com www.enchantedrock.com CONNECT WITH US

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.