ARCHITECTURE Design Portfolio






















Raleigh - 27606, NC
eeshanfadnis@gmail.com
https://www.linkedin.com/in/eeshan-fadnis-651a74161/
North Carolina State University (G.P.A - 3.6 /4)
- Master of Architecture
- 2021 - graduating in May, 2023
- Certification in Energy & Technology
. Aviation studio with Fentress Architects
. High rise studio with Skidmore, Owings & Merrill
Pune University (G.P.A - 3.75) Bachelor of Architecture
2015 - 2020 SKILLS
Revit / Autocad / Rhino / Grasshopper / Ladybug / Processing / Sketchup / Bluebeam
Vray / Lumion / Illustrator / Photoshop / premiere pro / Indesign
Figma / HTML / Research / Flowcharts / Ideation / Wireframing / Mockup
AXP HOURS COMPLETED
. 2376 hrs
. 100% / Programming & analysis
. 100% / Construction & evaluation
. 76% / Project management
. 47% / Project planning & design
. 46% / Project development
. 46% / Practice management
Bachelor’s final year thesis - Hyperloop terminal design -:
https://unbuiltideas.com/hyperloop-ter minal-navi-mumbai-eeshan-fadnis/
https://unbuiltideas.com/hyperloop-ter minal-navi-mumbai-eeshan-fadnis/
https://unbuiltideas.com/hyperloop-ter minal-navi-mumbai-eeshan-fadnis/
. Ranked 1st for the design proposal
. Published in magazine - India : Unbuilt architecture Selected to represent college in a national level competition conducted by Council of Architecture (COA), India
NCSU, Digital representation class, Teaching assistant January - May, 2023 (current)
Helping a group of 7 students with skillsets -:
. Hand drawings / Rhino / Grasshopper / Processing / Illustrator
Jacobs, Aviation Architectural internship May - August, 2022 (3 months)
Denver International airport, Concourse C - east expansion (for Southwest Airlines)
. Site visits, punching & back-punching via Helix Assisting with informational & action submittals
San Antonio Airport design guidelines & recommendations
Studio Elementz, Residential junior Architect Nov, 2019 - Jun, 2021 (18 months)
. Planning / schematic design / coordination / working drawings / visualization / site visits / for -: Fursungi residential building, Hadapsar bungalow, Nashik bungalow & Solapur bungalow
D.S.P Design Associates, Residential Architectural internship May - Nov, 2019 (6 months)
. Planning / presentation / visualization / for -: Omkar 1973 towers
. Planning / working drawings / collaboration / site visits / for -: Aquino landscapes tower & Central park tower
. Schematic options / visualization / client presentations / for -: DN Nagar Hemani complex , JP Infra towers and ICICI Prudential office
. High rise design
. Airport experience
. Energy performance optimization of a building
. Parametric design
. AR-VR technology
. High rise studio, with SOM
. Pune international airport, Airport studio with Fentress Architects
. New Bern Public library, Comprehensive studio
Universal access to education for learning experience.
UNDERGRADUATE WORK
. Hyperloop terminal
A proposal for an intermediate terminal at Navi Mumbai connecting to the new Navi Mumbai international airport.
PRE-GRADUATE PROFESSIONAL WORK
INTERNSHIP AT DSP DESIGN ASSOCIATES
. Omkar 1973
Mixed use complex at Mumbai
. Aquino landscapes
High rise residential building at Mumbai
. Central park
Luxurious high rise residential building at Mumbai
WORK AT STUDIO ELEMENTZ
. Nashik, Hadapsar, Solapur bungalow
Independent residential bungalows DIGITAL
BIOPHILIC DESIGN SOLAR EFFICIENCY CARBON NEGATIVE
Location -: San Francisco
The site is designed to solve the issues of fish breeding and to tackle the sea level rise in the Bay area.
The built-up spaces are designed with in the projected flood lines and to resist the sea level rise, the site is been bordered with minimum 100ft wide land of marshes.
The mixed use towers are designed to be carbon negative, with an effort to maximize the views and to be solar efficient
Built up spaces within the flood line
Residential spaces
Green spaces
Interactive spaces
Parking Retail - Shops
Restaurants
Indoor amenities
Indoor sports double height
1st podium - 15ft 2nd podium - 15ft 3rd & 4th podium15ftPress & Centrifuge
Algae slurry
Power station
CO2
Seperater
Exhaust emission
Algae
Water Nutrients
Algae panels
CO2
Feeding vessel
Intake & outlet pipes
Frame
Floor beam
1st amenity level - 20ft
2nd amenity level - 20ft
Algae facade
Full height glazing
Balcony
3rd amenity level - 20ft
Amenity levels
Service floor
Analysis
Based on the results, the side receiving more sunlight-:
. would have relatively more floor height glazing
. less balconies
- & the side receiving relatively less sunlight -:
. would have more balconies
. less floor height glazing
The corners of the building have been given the priority for full height glass, to deflect the corner incoming winds.
DESIGN PRINCIPLES APPLIED
India’s national bird
- Peacock
BIOPHILIC
ABOUT
Traveling to Mumbai has always been a challenge to catch international / domestic flights especially if it takes more than 4 hrs of road journey.
To solve this problem, we have proposed an international airport south of Pune city to cater the nearby cities, and to take off the air travel loads from Mumbai.
TAKEAWAYS
- Considering aspects, creating positive environment
- Parametric design methods
TIME TAKEN FROM OTHER CITIES TO MUMBAI
- 140 million people annually
Replicating the pattern for column & ceiling
+
An extra 10 min spent in baggage check-in & security checking...
Visual connectivity to the next step
Linear placement of programs Security
Having the concentric patterns being used as lights
Sense of direction
check-in area
Happy relaxed travelers spend 7% more money on average on retail...
The things that make a traveller relaxed is -:
and 10% more on duty free items
More incoming sunlight, more glazing
Biophilic interiors, Relaxation
The concessions are placed parallel to the movement of the passengers for maximum touch base areas between both of them
Amenity zone
Around the concourse
Pune city being an IT hub for India, we decided to provide conference & office rooms in the bridge, mixed with the concessions for a relaxed environment.
The bridge is deliberately elevated to allow the planes to pass below it for faster flight schedules, while also giving views for the spaces on it
Concourse
Concourse Runway Runway
1.7x efficient Under the concourse
Connecting bridge
Walking distances < max 900 ft
+ +
1hr more at concessions is... around $7 more spent per passenger
Visual connectivity with their planes & runways
By reducing travel distances and having visual connectivity with their flights, they become more relaxed and tend to spend more time at concessions
The bridge is vertically connected with the air taxis on the concourse’s roof.
The challenge was propose a public library at New Bern while addressing the issues of projected flooding from Neuse river.
- To have minimum programs possible on ground floor
- To segregate entries of different use of spaces.
- New wall sections than that of the East
- Familiarize with NC bylaws
- Designing with new structural techniques
Due to flood projections, I decided to give minimum number of programs on the ground floor.
A sleek structure within the constraints, running along the length of 2 setbacks.
One my glazing were facing south side, I chamfered the facade such that it was tilting downwards
the periphery
2+ Fillet the edges of the 2 blocks
1) from bottom to prevent flooding of ground floor spaces
2) from top to allow visual connectivity for the rear surrounding neighbours with the river
Golden ratio implemented for the glass facades for visual size - proportion comfort.
Horizontal slit for reading lounge having the view of Neuse river
Slanting slit for river view from double height entrance lobby
4’ x 6’ Glass fiber reinforced concrete panels
1/2” thick boarding
4” rigid insulation
1/2” thick double boarding
6” rigid insulation
1/2” thick boarding
Space frame 2’6” deep
1” Floor tile
2” screed
8” metal decking with concrete pour
W 6 x 25 steel beam
2’ false ceiling
40” deep steel beam
Space frame 3’6” deep
6” concrete slab
6” insulation
6” hard soling
Location -: Navi Mumbai, India
Existing conventional modes of transportation for people - rail, road, water, and air, tend to be slow for daily transport between Pune to Mumbai. Hyperloop is a new mode of transport that seeks to change this perspective by being fastest mode of transportation for people and goods.
Hyperloop
25 min travel time
154 km road travel
5-7 hrs of travel 1 way Pune
2019 - 75 million people annually
2026 - 140 million people annually
The shape of the band (around the structure) is derived from the infinity sign of the hyperloop
The band then on adding curves attains a fluid shape, and cuts the structure into 4 parts
The shape of the structure is determined by the infinity loop consisting of inner glass tube supported by outer golden wrought iron framework surrounding the entire structure.
Denver Concourse C east expansion
ASSISTING WITH SAN ANTONIO INTERNATIONAL AIRPORT DESIGN GUIDELINES RESEARCH & PRESENTATIONS
About the project
- Location : Denver, US
- Client : DEN
Duties performed INDIVIDUALLY
- Site visits, Punching & back punching
- Assisting with Informational and action submittals
- Keeping a record of posted set of RFI’s
Duration
- 3 months
Softwares used
- Revit
- Blue beam
- BIM 360
Concourse & Holdrooms
Concessions
Public restrooms
Interior signages
Research for-:
- Lighting & Sun control
- Holdroom arrangements
- Material finishes
- Furnitures
Research for-:
- Security
- Lighting
- Material finishes
- Furnitures
Research for-:
- Layouts for brighter interiors
- Accessibility & inclusion
- Reducing noise in toilets
- Material finishes
Research for-:
- Sizes for optimal viewing distance
- Types of signages
- BIDS, GIDS, FIDS
- New and upcoming innovations
ASSISTING WITH INFORMATIONAL AND ACTION SUBMITTALS
About the project
- Location : Mumbai, India
- Client : Omkar developers
- FSI : 5.00
- Built up area : 5 million sqft
Duties performed INDIVIDUALLY
- Planning
- Visualization
- Client presentations
Duration - 1 month
Softwares used
- Autocad
- Photoshop
Omkar 1973 is a residential tower that offers 480 apartments with balconies having views of the city and sea. There are 3 Towers- A, B & C scaling 76-storey, 77-storey and 65-storey respectively with views of the Arabian Sea.
These residential towers stand tall over -:
- 3 Basements
- 14 Parking Level Podiums with typical floor plate of around 100,000 sq. ft. accommodating 1550 cars
- 2 levels of mechanical floors
- 3 levels of penthouses on the top
The challenge for our team was adhering to a design, keeping in mind the wind pressure & solar performance.
About the project
- Location : Mumbai, India
- Client : Rohan lifescapes
- Plot area : 550sqm
Duties performed INDIVIDUALLY
- Planning & visualization
- Working drawings
- Collaboration
- Site visits
Duration - 2 months
Softwares used
- Revit
- Autocad
- Sketchup
- Lumion
- Photoshop
TYPICAL FLOOR PLAN
35TH LVL, REFUGE FLOOR PLAN
CENTRAL PARK TOWERS
- Location : Mumbai, India
- Client : Rohan lifescapes
- Plot area : 850sqm
Duties performed INDIVIDUALLY
- Planning & visualization
- Working drawings
- Collaboration
- Site visits
Duration - 2 months
Softwares used
- Revit
- Autocad
- Sketchup
- Lumion
- Photoshop
GROUND FLOOR PLAN
HADAPSAR BUNGALOW
- Location : Pune, India
- Builtup area : 210 sqm
NASHIK BUNGALOW
- Location : Nashik, India
- Builtup area : 170 sqm
Duties performed as Junior Architect
INDIVIDUALLY
- Planning
- Design drawings
- Coordination
- Working drawing
- 3D & visualization
Duration - 18 months
SOLAPUR BUNGALOW
- Location : Nashik, India
- Builtup area : 235 sqm
Softwares used
- Revit
- Autocad
- Lumion
- Photoshop
GRASSHOPPER -: SURFACE - SUNLIGHT DURATION ANALYSIS
LADYBUG -: SITE ANALYSIS - RADIATION, WIND-ROSE &
ELK -: SITE & SURROUNDING CREATION
- SYSTEM Packed rooftop VAV with reheat
GRASSHOPPER -: SKIN DESIGN
Winter
Heat gains monthly breakdown in (kwh)
Energy consumption in (kwh)
KINETIC FACADE - ACTIVATED BY SOLAR PANELS
Total heating & cooling energy consumption
Total energy consumption
COLUMN CLADDING PATTERNS
Total heating & cooling energy consumption
Total energy consumption
Problem
. 2000+ page pdf
. Mannual search
. room for errors
Process, user testing & iteration
View full project - https://www.eeshanfadnis.com/portfolio-2/project-one-xtzla-35xfd-5lhrb
TRANSLOC
User testing & iteration
View full project - https://www.eeshanfadnis.com/portfolio-2/project-one-xtzla-35xfd
User testing & iteration
Solution - Application design
. Automatic results
. Streamlined process
Problem
. Passenger stress points in an airport
Process, user testing & iteration
Solution - Application design