Ornl tm 2098

Page 1

HOME

HELP O A K RIDGE NATIONAL LABORATORY operated by

UNION CARBIDE CORPORATION NUCLEAR DIVISION 4

for the

I

.k

U.S. ATOMIC ENERGY COMMISSION ORNL- TM- 2098

n L

COPY NO. DATE

-

- January 3, 1968

TEE3 VIBRATION I N MSRE PRIMARY HEAT EXCHANGER R. J. Ked1 C

. K.

McGlothlan

ABSTRACT The primary heat exchanger f o r the Molten-Salt Reactor Experiment was completed i n 1963. Preoperational t e s t s with water revealed excessive tube vibrations and high f l u i d pressure drop on t h e s h e l l s i d e of t h e exchanger. Modifications were made t o c o r r e c t these deficiencies. From January 1965 through November 1967 t h e heat exchanger has operated f o r about 14,000 hours i n molten s a l t without indications of leakage o r change i n performance.

NOTlCf

This document contains information of a preliminary nature and was prepared primarily for internal use at the Oak Ridge Nationol Laboratory. It i s subject to revision or correction and therefore does not represent a final report.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.