Red Maple
Black Tupelo
Tree Filbert
London Plane Tree
Trident Maple
American Hornbeam
Module Profile
PHASE 1
Initial Planting
WALKWAY / ACCESS
Secondary
+3yr PHASE Tertiary
~7yr Turn Over
PHASE 3 : Final Product
PHASE 2 : Mid Cycle
Ty p i c a l d e p t h o f 2 0 ’ a t nearest primary walway/ t r a n s p o r t a t i o n p a t h w a y.
Ty p i c a l d e p t h o f 2 0 ’ Ty p i c a l d e p t h o f a t l e a s t 3 5 ’ i n o r d e r t o o f f s e t located at mid point of plot juvenile specimens. Cultivation phase occurs area. around the fringes of the site to enable v i s u a l p e r m i a b i l i t y, a n d d i s s o v l e n u r s e r y e d g e b o u n d a r y.
Site Section [D] Scale: 1/8” = 1’
0
5
10
PHASE 2 : Cultivation
25 Feet
WALKWAY / ACCESS
+2yr PHASE 2
Site Section [E] 0
5
10
Ty p i c a l W e t l a n d Tr a y P l a n t i n g P r o g r e s s i o n
Scale: 3/16” = 1’
Ty p i c a l P o t I n P o t P l a n t i n g P r o g r e s s i o n
T u r n o v e r O p e r a t i o n s S c h e m a t i c - W i t h i n T r a y Ty p o l o g i e s
Plot 2
Plot 7 Plot 6
Planting Dimensions `Conventional “pot in pot planting zone which draws upon organizational staregy of the design
Plot 3 Plot 5
Plot 4
Tray “X”
F
Tray C Tray A Tray A
Plot 8
Tray B
Plot #
Parametric planting system designed to stabilize soils structure and improve rootgrowth Mixture of conventional pot in pot system with a sequence of modular trays extending into the landscape Constructed wetlands
Plot 10
Plot 11 Plot 13
urban arboricultures
25
Tray A = 8829 SQ FT Tray B = 3372 SQ FT Tray C = 9697 SQ FT Total Area = 21898 SQ FT Estimated Yield* = 5400 Riparian Plants Plot 10. = 4086 Plot 11. = 3367 Plot 12. = 3474 Plot 13. = 4670
Permanent Site Trees
Estimated Total* = 9900 Plantings
Site Section [F] 0
5
10
Pot in Pot Planting + Modular System
Intensive Site Constructed Wetland Model
Scale: 3/16” = 1’
Scale: 1” = 60’
Intensive Site Section
Schematic Site Section [C] Scale: 1/16” = 1’
Total Area = 120056 SQ FT Estimated Yield* = 4000 Trees
Total Area = 15687 SQ FT Estimated Yield* = 500 Trees
Plot 12
Intensive Site Topography Studies Planting Convention Schematic
Circulation Network
Plot 1. = 2817 SQ FT Plot 2. = 5912 SQ FT Plot 3. = 7582 SQ FT Plot 4. = 5696 SQ FT Plot 5. = 76276 SQ FT Plot 6. = 4441 SQ FT Plot 7. = 817 SQ FT Plot 8. = 10208 SQ FT Plot 9. = 6307 SQ FT
WALKWAY / ACCESS
Plot #
REMOVAL ACCESS
Plot 9
WALKWAY / ACCESS
Plan Key Plot 1
0 5 10
20
50 Feet
LOCATION 2600 South 76th Street Philadelphia PA 273,300 Square Feet
Urban Arboriculture Philadelphia, PA
Spring 2010
Timothy Baird Associate Professor
SPRING 2010 LArch_414
Dylan Salmons Tim Baird, Matt Langan
04