Portfolio Diana Plaza Ortiz

Page 1


P R O F I L E

My experience in different architectural fields and different countries defines me as a creative, versatile, responsible, flexible and teamworking professional. My career has focused on the detailing and material quality of interior spaces and the intervention in existing buildings, value the participation in all phases of the project, and I have a personal interest on the transformation and rehabilitation of spaces (both public and private) in pursuit of new needs.

My complementary education provides me with a holistic perspective of the architectural discipline, as a humanistic design proposal and a tool for formalization and intervention in contemporary culture and way of life.

S K I L L S

Creativity

Problem solving

Commitment

Responsibility

dianaplazaortiz@gmail.com

W O R K E X P E R I E N C E 11.2021 – present Firenze Progetti España S.L., Madrid

Senior Architect

Retail projects

[Languages used in projects: Spanish / English]

01.2020 – 09.2020

Thomas Hillig Architekten GmbH, Berlin

Project Architect

Office building projects (new and existing)

[Languages used in projects: German]

02.2012 – 04.2018

Hyphen A GmbH, Berlin

Architect Project Manager

Retail and hotel refurbishment projects (international scope) [Languages used in projects: English / German]

10.2011 – 01.2012 A.H.E. Arquitectos / Ángel Hernández Espada, Madrid

Architect

Architectural competitions for leisure facilities projects

05.2011 – 09.2011

Househam Henderson Architects S.L., Madrid

Architect

Retail projects

03.2011 – 04.2011 Proarq Estudio / José Rubiato Luna, Madrid

Achitect

Retrofit and accessibility projects for residential buildings.

P R E – D E G R E E I N T E R S H I P S

03.2007 – 08.2008 Proarq Estudio / José Rubiato Luna, Madrid

Accessibility projects for residential buildings.

02.2006 – 01.2007 Instituto Juan de Herrera / Universidad Politécnica de Madrid / Architects Julio Pozueta, Patxi Lamíquiz, Ester Higueras Research in urbanism, planning and environment

E D U C A T I O N

HUMANISTIC STUDIES

06.2025 Máster Universitario de Humanidades: Arte, Literatura y Cultura Contemporáneas - UOC (Universitat Oberta de Catalunya)

09.2021 Máster Universitario en Escritura Creativa - UCM (Universidad Complutense de Madrid) ARCHITECTURE

06.2010 Escuela Técnica Superior de Arquitectura (Madrid) – ETSAM (Universidad Politécnica de Madrid)

Architect

09.2004 – 07.2005 École d'Architecture Paris-Belleville, Paris

L A N G U A G E S

DIANAPLAZAORTIZ

©DianaPlazaOrtiz

"Anygrey,oncedescomposedintolightanddarkparticles,shinyandopaqueones,spherical,polyhedral,flat, ceasestolooklikegreyand,onlythen,itbeginstomakeusunderstandthemeaningofgrey."

Collezionedisabbia-Coleccióndearena,ItaloCalvino

façadeelements+internalandexternalviews

firstluxurybrandstoreinSpain(Málaga) 350m2(GF+FF)

situation implementationofthefirststoreinSpainof theluxurybrand tasks toimplementanewdesign,matching3D visualizationsapprovedbyclient'sdesign team;theprojectrequiredstructuralworksin theexistingbuildingduetotheinstallationof anewstairandlift

actions

+coordinationofclientandtechnicalteam (GC,StructuralandMEPengineers,lighting planner,millworker)fromdesignphaseto storehandover

+preparationoftenderdocuments, supportingclientincontractphase,and constructionpackage(generalplansand details)

+on-sitecoordinationmeetings; implementationofthedesigninthelease areaaccordingtobrandstandardsandlocal requirements(frontandbackofhouse)

+overcomingthechallenge,togetherwith theGC,ofcoordinatingthetradesonthe constructionsite,duetothelimitedworking spaceandtimerequiredbyhandcraftfinishes

+finishingontimedespitereduced constructiontimeofalltheworkphases, fromdemolitionoftheexistingpremises, includingstructuralworksforthenew staircaseandreinforcementoftheexisting, liftinstallation

+sitesupervision,qualitycontrol +handoveranddocumentation

result theworkwascompletedontime,forthe plannedopeningdate,meetingtheclient's expectations

internalopeningwithsgrafittodesign(extract)+picturesfinalstageandprogressoftheworks+façadeelevation(extract)

firstluxurybrandstoreinBarcelona(Spain) 226m2(GF+BS)

situation implementationofthethirdstoreinSpain, andfirstinBarcelona,ofaninternational luxurybrandaspartofitscommercial expansioninEurope|thisprojectispartofa collaborationthatbeganwithafirststorein MálagaandasecondoneinMadrid

tasks

coordinationandimplementationofthe storefit-out,meetinglocalrequirementsand thehigh-qualitystandardsofthebrand, interestedinlocalcrafttechniquesforthis project actions

+coordinationoftechnicalteam(local architect,GCs,MEPengineers,lighting planner,millworker,localcraftsmanfor sgraffito)fromdesignphasetostore handover,andwithclientfollow-up

+tenderdocumentsandconstructionplans, coordinatingasmallteam(2people), includingconstructiondetailsanddesign modificationstomeetthebudget

+specialqualitycontrolwhenworkingwith samplesonsite,tomeettherequirementsof thebrand

+on-sitecoordinationmeetingsandreports; handoveranddocumentation

result theworkwascompletedontime,forthe plannedopeningdate,meetingtheclient's expectations

firstluxurybrandstoreinSpain(Málaga) 130m2(GF+FF)

situation anewinternationalbrandstartsitsexpansion inSpainbybuildingtwostoresatthesame time:oneinMadridandoneinMálaga tasks

+tounderstandneedsandexpectationsofa newclientaswellasthedesignstandards andworkorganisation

+tomeetnewclientexpectationsand introducetheclienttotheSpanish constructionsystem,frompermitphase, throughtenderingandconstruction,tothe finalhandoveroftheproject

+tocoordinatetheexecutionoftheMadrid andMálagastoressimultaneously,following differentdesigns

actions

+roleofthelocalarchitect

+coordinationofthetechnicalteam(GC, MEPandstructuralengineers,lighting planner,millworker)andwithclient follow-up +implementationofthedesigninthelease areaaccordingtothebrandstandards. +on-siteconstructionsolutions:coordination ofMEPsystemswithdesign,irregularscreed, structuralsolutionsforspecialdesign elements,workwithsamplestomeetclient's designintentions +sitesupervision,qualitycontrol +handoveranddocumentation

result theworkwascompletedontime,forthe plannedopeningdate,meetingtheclient's expectations

refurbishmentofpublicareasofahotelin Berlin(Germany) 835m2+350m2(GF+FF) situation implementationoftheclient'snewdesignin anexistingbuilding,underfixedbudget conditions;designgivenbyanexternalteam; strictlocalregulations(mainlyregardingfire safety),astheprojectislocatedonthe groundandfirstfloorsofaskyscraper tasks

toimplementanewdesignrespectingthe existingconditionsofuseandfireprotection, followingasmuchaspossiblethedesign approvedbytheclient

thisprojectwascarriedoutinparallelwith therefurbishmentofanotherhotelforthe sameclientinFrankfurt|sincethesewere theoffice’sfirsthotelprojects,Ihadto developanewsystemtoorganizethework accordingtotheneedsandcharacteristicsof bothprojects actions +constructionsolutions,adaptingthedesign tocomplywithexistingregulationsand conditions +constructionplans,coordinatingasmall teamforbothprojects(2-3people),including constructiondetailsanddesignmodifications tomeetthebudget +sitesupervisionandinternational coordinationofconstructionteams:Spanish GC,Germantechnicalcompanies(electricity, sprinklers),Spanishmillworker +handoveranddocumentation result theworkwascompletedontime,forthe plannedopeningdate,andtheclient reportedsatisfactionwiththework

reflectedceilingplanforconstruction(extract)+imagesfinalstage

luxurystoreinJohannesburg(SouthAfrica) 630m2(FOH+BOH)

situation

+constructionofanewluxurystoreinthe transitionzonebetweentheexistingbuilding andthenewluxurymall

tasks

+coordinationoftheconstructionand implementationofthestorefit-out,meeting localrequirementsandthehigh-quality standardsoftheluxurybrand

actions

+coordinationoftechnicalteam(local architect,GCs,MEPengineers,lighting planner,millworker)fromdesignphaseto storehandover

+on-sitecoordinationmeetings; implementationofthedesigninthelease areaaccordingtobrandstandardsandlocal requirements(frontandbackofhouse); tenderdocumentsanddrawings; constructionpackage(generalanddetail drawings)

+constructionsolutions:overcomingspecial difficultiesinfloorandceilingconstruction duetoexpansionjointsbetweenthetwo buildings,unevenfloorslabandlimitedspace betweenslabandceilingforMEP installations,respectingdesignrequirements

+sitesupervision,qualitycontrol

+handoveranddocumentation

result

theworkwascompletedontime,meeting theclient’sexpectations

floorfinishesplan(extract)+sections+imagesfinalstage

luxurystoreinnewextensionofexisting mallinMunich(Germany)

250m2(FOH+BOH)

situation

implementationofanewluxurystoreinahistoric building(1906)rehabilitatedin2016

tasks

coordinationofconstructionandimplementation ofthestorefit-out,accordingtothequality standardsofaluxurybrand,inanoldbuildingwith structuralconstraintsandstrictregulations(in termsofdesign,securityandfiresafety)

actions

+roleofthelocalarchitect

+coordinationoftheclient'stechnicalteam(GC, MEPandstructuralengineers,lightingplanner, millworker)andcommunicationswithlandlord's technicalteam

+implementationofthedesignintheleasearea accordingtothebrandstandards:preliminary design,tenderdocuments,constructionpackage (generalanddetaildrawings)

+on-siteconstructionsolutions:coordinationof MEPsystemswithdesign,existingstructuraljoints, irregularscreed,structuralsolutionsforfaçade installationtomeetlandlord'srequirementsand client'sdesignintentions

+sitesupervision,qualitycontrol

+handoveranddocumentation

result

theworkwascompletedontime,fortheplanned openingdate,andtheclientreportedsatisfaction withthework

siteplan+generalelevation+references+mainnorthandwestelevations+siteplan+first,secondandthirdfloor(extract)+materialsamples

competition:newofficebuilding inBerlin(Germany) grossarea1,909m2 situation closedcompetitionforanewofficebuilding locatedinaformerindustrialareanexttothe river,aspartofasetofnewfacilitiesfora commercialandofficesector requirements +reducedperformancearea,duetothe limiteddistancesbetweenthesurrounding buildings +maximumheightfixedbytheridgeofthe adjoiningexistingbuilding tasks +attractivefaçadedesign +achievementofthelargestpossible leasablearea +proposaltomeetallrequirements actions theproposalisasteppedformtowardsthe river,withterraces.Itproposesadialogue withthenewbuildingnexttotheriver,in termsofshapeandmaterials,providingthe complexwithanewunitthatbothhasa uniquedesignbutisintegratedintothe surroundings result theproposalwonsecondplace

siteplan+generalelevation+references+mainelevationoptions+modeldetails+groundfloor+firstfloor

A:contemporaryversionofbrickconstruction

B:similartonewbuildingnearbyasanonlyfronttotheriver

newofficebuilding+oldexistingbuilding forcommercialuseinBerlin(Germany)

grossareanewbuilding1,942m2 (GF+1F+2F+3F)

situation

newbuildinglocatedinanoldbrickindustrial complex,aspartofasetofnewinterventions plannedinemptyspaceswithinthecomplex, combiningnewandold,withcommercialand officeuses

tasks

+façadedesign

+layoutdesign(generalplans,sectionsand elevations)tobringtheconceptapprovedby theclientfrom1:250to1:50

actions

façade

optionA:façadeproposal,plansandmodels (requiredbytheclient),usingthesamebrick materialofexistingbuildingsaround,butina contemporaryway,withinclinedplanes playingwiththemovementoftheriver’sflow proposalwassatisfactoryfortheclient,but Berlinlocalauthorities(Berziksamt)wanted toemulatetheapprovedfaçadedesignofa newplannedunitnearby,carriedoutbythe samearchitecturaloffice

optionB:newfaçadedesignintextured aluminiumthatvisuallyconnectedboth buildings,providingunitydespitetheir differentshapes

designlayout

+glazedcourtyardtoconnectbothbuildings, opengroundfloortoallowfreecirculation andvisualconnections

+newunitlayoutdesignaccordingto accessibilityandfireprotectionrequirements

+refurbishmentofexistingbuildingto integratenewuses(restaurant,gymand shops)

result informalapprovaloflocalauthorities (Berziksamt)priortopreparationofpermit documents;clientsatisfiedwiththe developmentoftheproject office commercial existing new demolition

sportshall,urbanpark&publicspaceinaborderareaofCuenca(Spain)

finalprojectforbachelor’sdegree context

TheUrbanPlanningDepartmentinCuenca (Spain)proposedacompetitionofideasfor theslogan‘CityofSport’.Thismeantaclear intentiontoprovidethemunicipalitywitha completebuildingandenvironmentforthe practiceofsportinthecity.

Theprojectproposesafullperformance wherethereisanexistingsportsbuildingin poorconditionandanathleticstrack,both currentlyinuse.Duetotheconditionsofthe programmeandthesite’sriversidelocation, theprojectalsoenclosesanurbanparkas partofthenetworkofgreenspacesalongthe river,whichprovidesfreespaceforthe complexanddifferentactivitieslinkedtothe project'sprogram.

Thelocationrepresentsanedge–anurban limitbetweentheexistingcityandanew housingdevelopmentareaplannedbythe council.Theprojectaimstobethenode wherethatconnectionmighthappen.

architecturescale–sportshall

Programdevelopedwithinthreeforms(area forteamsports;areaforindividualsports; andswimmingpoolwithsolariumfor summersports)

Thebuildingisconceivedasafilterbetween the‘existing’(thecity)andthe‘new’(the publicpark),whilespeakingtothe‘Cityof Sport’brief.Thisalsoincludestheathletics fieldwithbleachers,inaccordancewiththe slopeoftheterrain.

Allsportingfacilitieshaveindependent access(sportsmen/sportswomen/public); however,theprojectprovidesthevisuals betweenallpracticeareasthroughglass enclosedareasandacourtyard.Accessibility, escaperoutesandaccesscontrol requirementsarerespectedthroughoutthe program.

Thebuildinghasdifferentaccesslevels;both thepublicsquareandtheathleticsfieldare opentotheriverarea.Thelargesizeofthe objectallowstheuseofroofsforskating.

Tothinkarchitecturefrommultipleplaces, enlargingthescaleofitsmeanings.Lookingat theworld,therichnessofitsimagesindifferent contexts,capturingtheirproposalandtaking themtothecreation ofarchitecturalforms.

Tothinkarchitectureasadialoguewithother artisticdisciplinesandculturalreferences.

publishedtexts

+Tambiénesinvierno,SalónBerlinés(2022)

+Puente,StadtsprachenMagazine(2020)

+Puntos,PolisPoesíamagazine(2020)

+FracturaTransversal[online](2018-2019)

+CasualidadMaderamagazine(2017)

+Cruce,Maderamagazine(2017)

+Todoesficción[online](2007-2010)

teaching

+workshopcoordinationforVHSBerlin (2editionsin2020)

Coordinationoffour-weekwritingworkshopsfor twelvestudents,accordingtotheprojectselected bytheGermaneducationalinstitution.

festivals

+FieberFestival(2017)

Biannualfestivalofwomenartistsfrom Ibero-AmericainBerlin

+SalónBerlinés(2022)

Cycleofbilingualreadingssponsoredbythe SenateoftheGermancapital.

training

+MásterUniversitarioenHumanidades:Arte, LiteraturayCulturaContemporáneas(2025) +MásterEscrituraCreativa(2021) +workshopwithAlanPauls(2020) +workshopwithJacintoMuñozRengel(2019) +workshopwithSamantaSchweblin(2016)

"Howcantheprisonerreachoutsideexceptbythrustingthroughthewall?"

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.