Page 1

Domenique Arcobasso G r a d u a t e

Architecture

S t r u d e n t

Portfolio


2


Domenique Arcobasso domarcobasso@gmail.com 573.694.7077

Co n tac t I n f o r m at i o n

3


Education Masters of Architecture 2015-2020 | Undergraduate GPS 3.44 Program Accredidation NAAB

School involvement APDPro Member Women in Design Member National Society of Leadership and Success Sigma Alpha Lambda Society Member KSU Cheerleader

experience Architects Alliance | Architecture Intern June 2017- July 2017

Skill set Rhino 5 Revit 2018 | 3ds Max Illustrator | Indesign | Photoshop | Premiere Sketchup Pro 2018 Drafting | Basic Fabrication Modeling

references Cary Gampher | AIA Principle Architect Owner | Architects Alliance cgampher@thearchitectsalliance.com Michael Grogan | Assistant Professor Professor from August 2017- December 2017 mgrogan@ksu.edu Dean Tim de Noble | AIA tdenoble@ksu.edu

4

Experience & Refernce


Table of Contents Education & Experience Education at a glance 01 Craft Brewery 02 NPR Station 03 Irwin-Union Bank

Ta b l e o f Co n t e n t s

5


1 2 3

ST year

6

ND year

rd year


Education at a Glance

7


CWE Brew Pub Project: Craft Brewery Location: S. Boyle Avenue, St. Louis, MO

14


Tasting Level 1/8”=1.0’

0’ - ground level

Brew

6’

circulation

Brew

12’

service

Bar

15’

tasting

Taste

Tasting Level 1/8”=1.0’

Loading Level 1/8”=1.0’

Loading Level 1/8”=1.0’

Concept

The concept of this design is to bring the community in the Central West End together to enjoy a craft brew and interact with one another strengthening that community bond.

Entry Level 1/8”=1.0’

Craft Brewery

15


Santa Monica, California Concept The KCRW NPR Station located on 6th st reet next to the Santa Monica Public Library, is intended to create a connection with the community of Santa Monica and the music and radio Station that inhabits it, bringing the very diverse population together to enjoy something cohesively.

16


National Public Radio Station 17


Entries onto Site

Section 1 18

Form

Node between Buildings

Primary Facades


Layers

Public to private

Circulation

Parti

Section 2 NPR Station

19


A

B

C

D

E

F

Irwin - Union Bank

G

Kansas City, Missouri

Concept

H

This bank is designed to help diminish the nickname, "The Dividing Line," Troost upholds by creating space for the community to use together. I

J


irwon - Union Bank

12


i

j

f

g

h

d

e

A

b

c

T.O.P. Tennant: 30’-0”

24'-0"

24'-0"

17'-7"

24'-0"

32'-0"

24'-0"

24'-0"

24'-0"

24'-0"

T.O.P. Bank: 20’-0” 16’-0” T.O.P. Expansion &

Top of Ceiling Tenant Level 1:

Entry: 0’-0” Longitudinal Section 1

Building Organization Business BOH Community

Site Organization & Ciculation Bank Community

Plazas Exterior Interior


3

2

1 "0-'06

1 9

10

2 11

3

4 13

12

5

6

4

7

8

5

"0-'42

"0-'42

9

6

"0-'42

10

"0-'22

11

1

12

2

3

13

4

14

5

14

A

A

B

B

IrwinIrwin-Union Bank

3200 Troo

3200 Troost Avenue & Linwood Boulevard

C

C Structureal Columns Material: Concrete

Service Walls Joists and Beams Materials: Glue- Laminated

Joists and Beams Materials: Service WallsGlue- Laminated

Arc

Structur Material

Arcobasso Desings

D

D

Key B08 40 SF

Lobby

B08 40 SF

C

Lobby

Means of Egress Construction Type A 303.1 (sprinkled)

C

Construction Type IIB (sprinkled)

B

BearingSupport

E

Level 2

Level 2

Level 2

Level 2

Mechanical B11 100SF

Tennant Assembly: Group A 303.1 Bank Assembly: business Group B 304.1 Construction Type: IIB (Sprinkled) Building Construction Allowed Proposed Bank

Janitor B12 40 SF

F Level 1 Level 1

Building Height

75’

# of Stories

3

Floor Area

34,000 sf

Mechanical B11 100SF

5,454 sf

Janitor B12 40 SF

Irwin - Union Bank

20’ 1

Lev

Oc

Level 2

E

Occupancy Classification

Level 1

14 F

Level 1

Tennant A Bank Asse Construc Buildin Bank Building Height

# of Storie Level 1

Floor Are


1

2

3

4

5

6

7

8

9

10

11

12

13

14

j

T.O.P. Bank: 20’-0”

1

2

3

4

5

6

Coping

7

8

9

10

11

12

13

14

Irwin-Union Bank 3200 Troost Avenue & Linwood Boulevard Coping Coping

T.O.R. Bank: 16’-0”

Rigid Insulatoin Flashing Tounge & Groove wood Decking Wood Paneling Plaster Metal bracket Batt Insulation Plywood

Arcobasso Desings

Control Layers Glazing

Rigid Insulation Rigid Insulation

Muillion Flashing flashing/ roof membrane

South View into staff lounge space

Rigid Insulation Brick Rigid Insulation Rigid Insulation Glue- Laminated Joist Joist

Air Ventilation Return Through Brick Openings

Entry: 0’-0”

Tounge Wodd Decking Toungeand and Groove Groove Wood Decking

Metal Bracket

Metal bracket

Control Layers

Control Layers

Plywood

Plywood

Batt Insulation

Aluminum mullions Mullion Batt InsulationAluminum

HVAC Duct HVAC Air Duct

Facade Infill Section: 1/4”=1.0’

Fresh Air Return

1.5”hx2”w

Wall Axon structural detail

Plaster

Wood Paneling Metal bracket

Plaster

Infill Wall Detail

A502

Control Layers Wood RainScreen Paneling

Plywood

Wood Paneling

Scale: 1/4”=1.0’

Batt Insulation Plaster Glazing Glazing

Rain Screen Detail: 1”=1.0’

Domenique Arcobasso Fein Fall 2018 | Studio Five

Facade Infill Plan: 1/4”=1.0’

Glue-Laminated joist

brick masonry

Glue-Laminated Beam

Air Vents

Linear Lighting

Water Drainage

Structure Detail Diagram & brick Detail Diagram Roof Drains Drainage Pipes

@

Kansas State University


20


“A Design is not finished until someone is using it...� -Frank Lloyd Wright

21

Domenique Arcobasso's Architecture Portfolio  

This is a glimpse at my design, drawing and computer skills that I have developed in my time at Kansas State Univertsity

Domenique Arcobasso's Architecture Portfolio  

This is a glimpse at my design, drawing and computer skills that I have developed in my time at Kansas State Univertsity

Advertisement