PROJECT SATERN V PROJECT NAME: PROJECT LOCATION: ISSUE DATE: GROUP NAME: GROUP MEMBER: TUTOR NAME: SUBJECT NAME: SCHOOL NAME: SEMEESTER:

SATURN V 81/89 BOUVERIE ST, CARLTON VIC 2053 08/03/2018 DYNAMIC ARCHITECTS DANNY KWAK & JEAN VILJOEN EDWARD BERRY ARCH 1016 TECHNOLOGY 04 RMIT UNIVERSITY SEMESTER 1,2018

PROJECT SATURN V SHEET LIST WT A000 A001 A002 A100 A101 A102 A103 A104 A105 A106 A107 A108 A109 A110 A111 A112 A113 A114 A115 A116 A200 A201 A300 A301 A302 A304 A305 A400 A401 A402 A403 A404 A500 A510 A511 A600

Sheet Name TITLE SHEET SITE PLAN 01 SITE PLAN 02 BASEMENT FLOOR PLAN GROUND FLOOR PLAN LEVEL 01 PLAN LEVEL 02 PLAN LEVEL 03 PLAN LEVEL 04 PLAN LEVEL 05 PLAN LEVEL 06 PLAN LEVEL 07 PLAN LEVEL 08 PLAN LEVEL 09 PLAN ROOFTOP GARDEN PLAN ROOF PLAN REFLECTED CEILING PLAN 01 REFLECTED CEILING PLAN 02 REFLECTED CEILING PLAN 03 REFLECTED CEILING PLAN 04 ELEVATIONS ‐ NORTH & EAST ELEVATIONS ‐ SOUTH & WEST ZONE SECTIONS SECTION A SECTION B SECTION C SECTION D TYPICAL FACADE 01 TYPICAL FACADE 02 DETAIL 01 GLASS FLOOR DETAILS 02 STAIRS DETAILS 03 HANGING BOX TYPICAL AMENITIES PLAN TYPICAL AMENITIES ELEVATIONS 01 TYPICAL AMENITIES ELEVATION 02 SPECIAL DRAWINGS

Revision

SCALE

4

N/A

4

1:500

4

1:200

4

1:50

4

1:50

4

1:50

4

1:50

4

1:50

4

1:50

4

1:50

4

1:50

4

1:50

4

1:50

4

1:50

4

1:50

4

1:50

4

1:50

4

1:50

4

1:50

4

1:50

4

1:100

4

1:100

4

1:100

4

1:50

4

1:50

4

1:20

4

1:20

4

N/A

4

N/A

4

N/A

4

N/A

4

N/A

4

1:20

4

1:20

4

1:20

4

N/A

WALL SCHEDULE WT03 (INTERIOR) 230 BLOCK VENEER

WT 05 (INTERIOR) 200mm CONCRETE WALL

WT07 (INTERIOR/EXTERIOR) 150mm FULL CURTAIN

90mm MASONRY BLOCK 50mm RIGID INSULATION 80mm TIMBER BLOCK 10mm GYPSUM BOARD

150mm CONCRETE 40mm RIGID INSULATION 10mm GYPSUM BOARD

6mm LOW E COATED GLASS 12mm ARGON GAS 6mm LOW E COATED GLASS

WT02 (EXTERIOR) 270mm BRICK VENEER

WT 04 (INTERIOR) 300mm CONCRETE

WT 06 (INTERIOR) 90mm TIMBER STUD

WT08 (INTERIOR) 200mm FEATURE WALL

110mm MASONRY BRICK 40mm AIR GAP 40mm RIGID INSULATION 50mm TIMBER BLOCK 10mm PLYWOOD SUBSTRATE 20mm GYPSUM BOARD

10mm GYPSUM BOARD 40mm RIGID INSULATION 250mm POURED CONCRETE

10mm TIMBER CLADDING 20mm RIGID INSULATION 5mm AIR GAP 40mm TIMBER STUD 5mm AIR GAP 10mm TIMBER CLADDING

20mm TIMBER CLADDING 5mm AIR GAP 50mm RIGID INSULATION 100mm TIMBER STUD 5mm AIR GAP 20mm TIMBER CLADDING

DT 03 DOUBLE DOOR

DT 05 CURTAIN WALL (DOUBLE)

DT 07 TOILET DOOR

WT 01 (EXTERIOR) GLASS QUASI CURTAIN PANEL

DOOR SCHEDULE DT 01 SLIDING DOOR

GENERAL NOTES DT 02 SINGLE DOOR

DT 04 CURTAIN WALL (SINGLE)

1.

DT 06 FIRE EXIT DOOR

2. 3.

FLOOR SCHEDULE FT 01 150mm 6 CORE HC SLAB

FT 03 150mm GLASS FLOOR

FT 05 CAFE FLOOR 60x120mm PETITOT TILE

4.

30mm GLASS 50mm GLASS 50mm GLASS 20mm AIR GAP

5.

6. FT 02 300mm 4 CORE HC SLAB

FT 04 TOILET FLOOR 60x60mm OZ TILE

FT 06 CLASSROOM FLOOR 5mm SPHERA VINYL FLOOR

7. 8.

ALL DIMENSIONS ARE IN MILLIMETERS.DO NOT SCALE DRAWINGS FOR CRITICAL DIMENSIONS.CHECK DRAWING IS TO SCALE BY MEASURING SCALE BAR BELOW. VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK, SHOP DRAWINGS OR ORDERING MATERIALS.

0

10

20

30

Notes:

40

4

Final Package

12/05/18

3

Mid Sem Presentation

17/04/18

2

Preliminary Design

22/03/18

1

Project Set Up

03/03/18

REV

STATUS:

50

60

70

80

90

100

DESCRIPTION

PRELIMINARY

DATE

THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO PROVIDE FOR A WATERTIGHT & WEATHER TIGHT BUILDING. THE CONTRACTOR SHALL REVIEW ALL DETAILS RELATING TO THIS INTENT AND BY BIDDING OR ENTERING INTO THIS CONSTRUCTION CONTRACT WARRANTS FOR ONE FULL YEAR THE ADEQUACY OF THESE DETAILS. SHOULD THE CONTRACTOR TAKE EXCEPTION TO THESE DETAILS, SHALL NOTIFY THE ARCHITECT PRIOR TO BIDDING. ANY DEVIATION FROM THIS GENERAL INTENT SHOULD BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION. THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO PROVIDE FOR A PLUMB, LEVEL, AND SQUARE STRUCTURE UNLESS OTHERWISE NOTED. ANY DEVIATION FROM THIS GENERAL INTENT SHOULD BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION. THE BUILDING SHALL BE CONSTRUCTED IN FULL COMPLIANCE WITH ALL APPLICABLE CODES, ORDINANCES AND REGULATIONS AS WELL AS THE DRAWINGS AND SPECIFICATIONS. ANY CODE DEFICIENCIES IN THE DRAWINGS RECOGNIZED BY THE CONTRACTOR SHOULD BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCURATE PLACEMENT OF THE BUILDING ON THE SITE AND VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS. DISCREPANCIES BETWEEN DRAWINGS AND ACTUAL SITE CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT BEFORE BIDDING THE PROJECT OR THE COMMENCEMENT OF WORK. THE OWNER SHALL NOT BE RESPONSIBLE FOR CHANGES TO THE WORK DUE TO THE FAILURE OF THE CONTRACTOR TO FAMILIARIZE HIMSELF WITH EXISTING CONDITIONS DO NOT SCALE DRAWINGS: ALL DIMENSIONS SHALL HAVE PREFERENCE OVER SCALE AND BE FIELD VERIFIED AND COORDINATED WITH WORK OF ALL TRADES. IF NO DIMENSIONS ARE GIVEN OR DISCREPANCIES FOUND, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT FOR CLARIFICATION BEFORE BIDDING OR COMMENCING THE WORK. DETAILS ARE INTENDED TO SHOW METHOD AND MANNER OF ACCOMPLISHING WORK. MINOR MODIFICATIONS MAY BE REQUIRED TO SUIT JOB DIMENSIONS OR CONDITIONS, ALL INCLUDED AS PART OF THE WORK. THE CONTRACTOR SHALL PROVIDE ALL PERMITS AND INSPECTION NECESSARY FOR THE PROPER EXECUTION OF THE WORK IN ACCORDANCE WITH APPLICABLE CODES AND GOVERNING REGULATIONS. THE CONTRACTOR SHALL VERIFY THE SIZES AND LOCATIONS OF ALL MECHANICAL AND ELECTRICAL EQUIPMENT PADS AND BASES, AS WELL AS POWER, WATER AND DRAIN REQUIREMENTS FOR SUCH EQUIPMENT WITH EQUIPMENT MFG. DEVIATION OF THE AFOREMENTIONED REQUIREMENTS SHOULD BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION.

DYNAMIC ARCHITECTS Building 100 Victoria St, Carlton VIC 3000 +61 03 9999 8888 +61 03 9999 8887 dynamicarchitects@gmail.com www.dynamicarchitects.com.au

CLIENT:

SITE:

RMIT SCHOOL OF AEROSPACE ENGINEERING AND AVIATION ARCHITECT:

DYNAMIC ARCHITECTS

TITLE:

81/89 BOUVERIE ST, CARLTON VIC 3053

TITLE SHEET

SCALE AT A1:

DATE:

DRAWN:

As indicated 01.03.18 D.K & J.V PROJECT NO:

001

DRAWING NO:

A000

CHECKED:

E.B REVISION:

4


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.