KRC-CGN2-BIM Booklet

Page 1


Structure Consultant
Facade Consultant
Federated Model
Cignus
Coordinated Building View

Setting Out Plan

PGP-CGN2-GFC-B2-100 Basement 2 Floor Plan R0.dwg

PGP-CGN2-GFC-GR-103 D-Ground Floor Slab Edge (Curve Setting out) Part Plan-D V2Aug 9, 2024 1:07 PM

PGP-CGN2-GFC-GR-103 E-Ground Floor Slab Edge (Curve Setting out) Part Plan-E V2Aug 9, 2024 1:07 PM

PGP-CGN2-GFC-GR-104 -Ground Floor Edge of Slab Plan V2Aug 9, 2024 1:07 PM

PGP-CGN2-GFC-GR-104 A-Ground Floor Edge of Slab Part Plan-A V2Aug 9, 2024 1:07 PM

PGP-CGN2-GFC-GR-104 B-Ground Floor Edge of Slab Part Plan-B V2Aug 9, 2024 1:07 PM

PGP-CGN2-GFC-GR-104 C-Ground Floor Edge of Slab Par Plan-C V2Aug 9, 2024 1:07 PM

PGP-CGN2-GFC-GR-104 D-Ground Floor Edge of Slab Part Plan-D V2Aug 9, 2024 1:07 PM

PGP-CGN2-GFC-B2-102 A-Ground Floor Part Plan-A.dwg

PGP-CGN2-GFC-B2-102 A-Ground Floor Part Plan-A

V1Apr 19, 2024 6:09 PMApproved

V1May 10, 2024 6:17 PMApproved

PGP-CGN2-GFC-B2-100 Basement 2 Floor Plan.dwg V1 Aug 16, 2024 3:06 PM PGP-CGN2-GFC-B2-100-A-Basement 2 Floor Plan Part A.dwg V1 Aug 16, 2024 3:06 PM PGP-CGN2-GFC-B2-100-B-Basement 2

V1May 10, 2024 6:17 PMApproved

Basement 2 Floor Plan R0

PGP-CGN2-GFC-B2-100 Basement 2 Floor Plan V3 Dec 18, 2024 5:35 PM

PGP-CGN2-GFC-B2-100-A-Basement

V1 Dec 31, 2024 12:12 PM Approved w/ comments

V1 Dec 31, 2024 12:12 PM Approved w/ comments

PGP-CGN2-GFC-B2-102 B-Ground Floor Part Plan-B.dwg V1 Dec 31, 2024 12:12 PM Approved

PGP-CGN2-GFC-B2-102 B-Ground Floor Part Plan-B V1 Dec 31, 2024 12:12 PM Approved

PGP-CGN2-GFC-B2-102 C-Ground Floor Part Plan-C.dwg V1 Dec 31, 2024 12:12 PM Approved

PGP-CGN2-GFC-B2-102 C-Ground Floor Part Plan-C V1 Dec 31, 2024 12:12 PM Approved

PGP-CGN2-GFC-B2-102 D-Ground Floor Part Plan-D.dwg V1 Dec 31, 2024 12:12 PM Approved w/ comments

PGP-CGN2-GFC-B2-102 D-Ground Floor Part Plan-D

V1 Dec 31, 2024 12:12 PM Approved w/ comments

PGP-CGN2-GFC-GR-102 -Ground Floor Plan.dwg V1 Dec 31, 2024 12:12 PM Approved w/ comments

PGP-CGN2-GFC-GR-102 -Ground Floor Plan V1 Dec 31, 2024 12:12 PM Approved w/ comments

PGP-CGN2-GFC-GR-104 -Ground Floor Edge of Slab Plan V1Jan 16, 2025 3:31 PMApproved w/ comments

PGP-CGN2-GFC-GR-104 A-Ground Floor Edge of Slab Part Plan-A V1Jan 16, 2025 3:32 PM Approved w/ comments

PGP-CGN2-GFC-GR-104 B-Ground Floor Edge of Slab Part Plan-B V1Jan 16, 2025 3:31 PMApproved

PGP-CGN2-GFC-GR-104 C-Ground Floor Edge of Slab Par Plan-C V1Jan 16, 2025 3:31 PMApproved

PGP-CGN2-GFC-B2-100-D-Basement 2 Floor Plan Part D

PGP-CGN2-GFC-B1-101 Basement 1 Floor Plan R0.dwg

PGP-CGN2-GFC-B1-101 Basement 1 Floor Plan.dwg

V3Dec 18, 2024 5:35 PM

18, 2024 5:35 PM PGP-CGN2-GFC-B2-100-C-Basement 2 Floor Plan Part C

V3Dec 18, 2024 5:35 PM

V2May 21, 2024 2:03 PMApproved

V1 Aug 16, 2024 3:05 PM

PGP-CGN2-GFC-B1-101-A-Basement 1 Floor Plan Part A.dwg V1 Aug 16, 2024 3:05 PM

PGP-CGN2-GFC-B1-101-B-Basement 1 Floor Plan Part B.dwg V1 Aug 16, 2024 3:05 PM

PGP-CGN2-GFC-B1-101-C-Basement 1 Floor Plan Part C.dwg V1 Aug 16, 2024 3:05 PM

PGP-CGN2-GFC-B1-101-D-Basement 1 Floor Plan Part D.dwg V1 Aug 16, 2024 3:05 PM

PGP-CGN2-GFC-B1-101 Basement 1 Floor Plan.dwg V1 Dec 31, 2024 12:33 PM Approved w/ comments

PGP-CGN2-GFC-B1-101-A-Basement 1 Floor Plan Part A.dwg V1 Dec 31, 2024 12:33 PM Approved w/ comments

PGP-CGN2-GFC-B1-101-B-Basement 1 Floor Plan Part B.dwg V1 Dec 31, 2024 12:33 PM Approved w/ comments

PGP-CGN2-GFC-B1-101-C-Basement 1 Floor Plan Part C.dwg V1 Dec 31, 2024 12:33 PM Approved w/ comments

PGP-CGN2-GFC-B1-101-D-Basement 1 Floor Plan Part D.dwg V1 Dec 31, 2024 12:33 PM Approved w/ comments

PGP-CGN2-GFC-B1-101 Basement 1 Floor Plan R0 V2May 21, 2024 2:03 PMApproved

PGP-CGN2-GFC-B1-101 Basement 1 Floor Plan V2 Aug 9, 2024 1:10 PM

PGP-CGN2-GFC-B1-101-A-Basement 1 Floor Plan Part A V2Aug 9, 2024 1:10 PM

PGP-CGN2-GFC-B1-101-B-Basement 1 Floor Plan Part B V2Aug 9, 2024 1:10 PM

PGP-CGN2-GFC-B1-101-C-Basement 1 Floor Plan Part C V2Aug 9, 2024 1:10 PM

PGP-CGN2-GFC-B1-101-D-Basement 1 Floor Plan Part D V2Aug 9, 2024 1:10 PM

PGP-CGN2-GFC-B1-101 Basement 1 Floor Plan V2Jan 7, 2025 11:48 AM

PGP-CGN2-GFC-B1-101-A-Basement 1 Floor Plan Part A

PGP-CGN2-GFC-B1-101-B-Basement 1 Floor Plan Part B

V2Jan 7, 2025 11:48 AM

V2Jan 7, 2025 11:49 AM

PGP-CGN2-GFC-B1-101-C-Basement 1 Floor Plan Part C V2Jan 7, 2025 11:48 AM

PGP-CGN2-GFC-B1-101-D-Basement 1 Floor Plan Part D V2Jan 7, 2025 11:48 AM

PGP-CGN2-GFC-GR-102 -Ground Floor Plan.dwg

PGP-CGN2-GFC-GR-102 A-Ground Floor Part Plan-A.dwg

PGP-CGN2-GFC-GR-104 D-Ground Floor Edge of Slab Part Plan-D V1Jan 16, 2025 3:31 PMApproved

PGP-CGN2-GFC-1P-105 1ST PODIUM PLAN –FLOOR PLAN.dwg V3Jun 18, 2025 12:21 PMApproved

PGP-CGN2-GFC-1P-105A 1ST PODIUM PLAN –FLOOR PLAN (PART A).dwg V3Jun 18, 2025 12:21 PMApproved

PGP-CGN2-GFC-1P-105B 1ST PODIUM PLAN –FLOOR PLAN (PART B).dwg V3Jun 18, 2025 12:21 PMApproved

PGP-CGN2-GFC-1P-105C 1ST PODIUM PLAN –FLOOR PLAN (LIFT CORE).dwg V4Jun 19, 2025 6:10 PM

PGP-CGN2-GFC-1P-106 1ST PODIUM PLAN –SLAB EDGE(CURVE SETTING OUT).dwg V1 Sep 26, 2024 2:44 PM

PGP-CGN2-GFC-1P-105 1ST PODIUM PLAN –FLOOR PLAN V5Jun 18, 2025 12:19 PMApproved

PGP-CGN2-GFC-1P-105A 1ST PODIUM PLAN –FLOOR PLAN (PART A) V5Jun 18, 2025 12:19 PMApproved

PGP-CGN2-GFC-1P-105B 1ST PODIUM PLAN –FLOOR PLAN (PART B) V5Jun 18, 2025 12:19 PMApproved

PGP-CGN2-GFC-1P-105C 1ST PODIUM PLAN –FLOOR PLAN (LIFT CORE) V6Jun 19, 2025 6:08 PM

PGP-CGN2-GFC-1P-106A 1ST PODIUM PLAN –SLAB EDGE(CURVE SETTING OUT) V2 Sep 26, 2024 12:38 PM

PGP-CGN2-GFC-1P-106B 1ST PODIUM PLAN –SLAB EDGE(CURVE SETTING OUT) V2Sep 26, 2024 12:38 PM

PGP-CGN2-GFC-1P-106C 1ST PODIUM PLAN –SLAB EDGE(CURVE SETTING OUT) V2Sep 26, 2024 12:38 PM

PGP-CGN2-GFC-2P-107 2ND PODIUM PLAN –FLOOR PLAN.dwg

V3Jun 18, 2025 1:41 PMApproved

PGP-CGN2-GFC-2P-107A 2ND PODIUM PLAN –FLOOR PLAN (PART A).dwg V3Jun 18, 2025 1:41 PMApproved

PGP-CGN2-GFC-2P-107B 2ND PODIUM PLAN –FLOOR PLAN (PART B).dwg V3Jun 18, 2025 1:41 PMApproved

PGP-CGN2-GFC-2P-107C 2ND PODIUM PLAN –FLOOR PLAN (LIFT CORE).dwg

V3Jun 18, 2025 1:41 PMApproved

PGP-CGN2-GFC-2P-108 2ND PODIUM PLAN –SLAB EDGE(CURVE SETTING OUT).dwg V1 Sep 26, 2024 2:49 PM

PGP-CGN2-GFC-2P-107 2ND PODIUM PLAN –FLOOR PLAN V4Jun 18, 2025 1:40 PMApproved

PGP-CGN2-GFC-2P-107A 2ND PODIUM PLAN –FLOOR PLAN (PART A) V4Jun 18, 2025 1:40 PMApproved

PGP-CGN2-GFC-2P-107B 2ND PODIUM PLAN –FLOOR PLAN (PART B) V4Jun 18, 2025 1:40 PMApproved

PGP-CGN2-GFC-2P-107C 2ND PODIUM PLAN –FLOOR PLAN (LIFT CORE)

V5Jun 18, 2025 1:40 PMApproved

PGP-CGN2-GFC-2P-108A 2ND PODIUM PLAN –SLAB EDGE(CURVE SETTING OUT) V2 Sep 26, 2024 12:41 PM

PGP-CGN2-GFC-2P-108B 2ND PODIUM PLAN –SLAB EDGE(CURVE SETTING OUT) V2Sep 26, 2024 12:41 PM

V1 Aug 16, 2024 3:06 PM

V1 Aug 16, 2024 3:06 PM

PGP-CGN2-GFC-GR-102 B-Ground Floor Part Plan-B.dwg V1 Aug 16, 2024 3:06 PM

PGP-CGN2-GFC-GR-102 C-Ground Floor Part Plan-C.dwg V1 Aug 16, 2024 3:06 PM

PGP-CGN2-GFC-GR-102 D-Ground Floor Part Plan-D.dwg V1 Aug 16, 2024 3:06 PM

PGP-CGN2-GFC-GR-103-Cignus 2 -Ground floor Slab Edge Curve Setting out.dwg V1 Aug 16, 2024 3:06 PM

PGP-CGN2-GFC-GR-104 -Ground Floor Edge of Slab Plan.dwg V1 Aug 16, 2024 3:06 PM

PGP-CGN2-GFC-GR-104 A-Ground Floor Edge of Slab Part Plan-A.dwg V1 Aug 16, 2024 3:06 PM

PGP-CGN2-GFC-GR-104 B-Ground Floor Edge of Slab Par Plan-B.dwg

V1 Aug 16, 2024 3:06 PM

PGP-CGN2-GFC-GR-104 C-Ground Floor Edge of Slab Par Plan-C.dwg V1 Aug 16, 2024 3:06 PM

PGP-CGN2-GFC-GR-104 D-Ground Floor Edge of Slab Part Plan-D.dwg V1 Aug 16, 2024 3:06 PM

PGP-CGN2-GFC-GR-102 A-Ground Floor Part Plan-A

V1Aug 9, 2024 1:07 PM

PGP-CGN2-GFC-GR-102 B-Ground Floor Part Plan-B V1Aug 9, 2024 1:07 PM

PGP-CGN2-GFC-GR-102 C-Ground Floor Part Plan-C V1Aug 9, 2024 1:07 PM

PGP-CGN2-GFC-GR-102 D-Ground Floor Part Plan-D

PGP-CGN2-GFC-GR-102

V1Aug 9, 2024 1:07 PM

V1Jun 7, 2024 5:28 PMApproved

PGP-CGN2-GFC-GR-103 A V1Jun 7, 2024 5:28 PMApproved

PGP-CGN2-GFC-GR-103 B

V1Jun 7, 2024 5:28 PM Approved

PGP-CGN2-GFC-GR-103 C V1Jun 7, 2024 5:28 PMApproved

PGP-CGN2-GFC-GR-103 D V1Jun 7, 2024 5:28 PMApproved

PGP-CGN2-GFC-GR-103 E V1Jun 7, 2024 5:28 PMApproved

PGP-CGN2-GFC-GR-104 V1Jun 7, 2024 5:28 PM Approved

PGP-CGN2-GFC-B2-102 A-Ground Floor Part Plan-A V2 Jan 7, 2025 12:05 PM

PGP-CGN2-GFC-B2-102 B-Ground Floor Part Plan-B

V2Jan 7, 2025 12:05 PM

PGP-CGN2-GFC-B2-102 C-Ground Floor Part Plan-C V2Jan 7, 2025 12:05 PM

PGP-CGN2-GFC-B2-102 D-Ground

1:07

PGP-CGN2-GFC-2P-108C 2ND PODIUM PLAN –SLAB EDGE(CURVE SETTING OUT) V2Sep 26, 2024 12:41 PM

PGP-CGN2-GFC-3P-109 3RD PODIUM PLAN –FLOOR PLAN.dwg V1Dec 5, 2024 12:01 PM

PGP-CGN2-GFC-3P-109A 3RD PODIUM PLAN –FLOOR PLAN (PART A).dwg V1Dec 5, 2024 12:01 PM

PGP-CGN2-GFC-3P-109A 3RD PODIUM PLAN –FLOOR PLAN (PART B).dwg V1Dec 5, 2024 12:01 PM

PGP-CGN2-GFC-3P-109C 3RD PODIUM PLAN –FLOOR PLAN (LIFT CORE).dwg V1Dec 5, 2024 12:01 PM

PGP-CGN2-GFC-3P-109 3RD PODIUM PLAN –FLOOR PLAN V2Dec 4, 2024 3:09 PM

PGP-CGN2-GFC-3P-109A 3RD PODIUM PLAN –FLOOR PLAN (PART A) V2Dec 4, 2024 3:09 PM

PGP-CGN2-GFC-3P-109B 3RD PODIUM PLAN –FLOOR PLAN (PART B) V2Dec 4, 2024 3:09 PM

PGP-CGN2-GFC-3P-109C 3RD PODIUM PLAN –FLOOR PLAN (LIFT CORE) V2Dec 4, 2024 3:09 PM

PGP-CGN2-GFC-3P-110A 3RD,5TH & 6TH PODIUM PLAN –SLAB EDGE(CURVE SETTING OUT) V1 Oct 8, 2024 5:28 PM Approved

PGP-CGN2-GFC-3P-110B 3RD,5TH & 6TH PODIUM PLAN –SLAB EDGE(CURVE SETTING OUT) V1 Oct 8, 2024 5:28 PM Approved

PGP-CGN2-GFC-3P-110C 3RD,5TH & 6TH PODIUM PLAN –SLAB EDGE(CURVE SETTING OUT) V1Oct 8, 2024 5:28 PMApproved

PGP-CGN2-GFC-3P-110D 3RD,5TH & 6TH PODIUM PLAN –SLAB EDGE(CURVE SETTING OUT) V1Oct 8, 2024 5:28 PMApproved

PGP-CGN2-GFC-4P-111 4TH PODIUM PLAN –FLOOR PLAN.dwg V1Dec 5, 2024 12:02 PM

PGP-CGN2-GFC-4P-111A 4TH PODIUM PLAN –FLOOR PLAN (PART A).dwg V1Dec 5, 2024 12:02 PM

PGP-CGN2-GFC-4P-111B 4TH PODIUM PLAN –FLOOR PLAN (PART B).dwg V1Dec 5, 2024 12:02 PM

PGP-CGN2-GFC-4P-111C 4TH PODIUM PLAN –FLOOR PLAN (LIFT CORE).dwg V1Dec 5, 2024 12:02 PM

PGP-CGN2-GFC-4P-111 4TH PODIUM PLAN –FLOOR PLAN V2Dec 4, 2024 3:10 PM

PGP-CGN2-GFC-4P-111A 4TH PODIUM PLAN –FLOOR PLAN (PART A) V2Dec 4, 2024 3:10 PM

PGP-CGN2-GFC-4P-111B 4TH PODIUM PLAN –FLOOR PLAN (PART B) V2Dec 4, 2024 3:10 PM

PGP-CGN2-GFC-4P-111C 4TH PODIUM PLAN –FLOOR PLAN (LIFT CORE) V3Dec 4, 2024 3:12 PM

PGP-CGN2-GFC-4P-112A 4TH PODIUM PLAN –SLAB EDGE(CURVE SETTING OUT) V1 Oct 8, 2024 5:48 PM Approved

PGP-CGN2-GFC-4P-112B 4TH PODIUM PLAN –SLAB EDGE(CURVE SETTING OUT) V1 Oct 8, 2024 5:48 PM Approved

PGP-CGN2-GFC-4P-112C 4TH PODIUM PLAN –SLAB EDGE(CURVE SETTING OUT) V1Oct 8, 2024 5:48 PMApproved

PGP-CGN2-GFC-5P-113 5TH PODIUM PLAN –FLOOR PLAN.dwg V1Nov 29, 2024 2:34 PMApproved w/ comments

PGP-CGN2-GFC-5P-113A 5TH PODIUM PLAN –FLOOR PLAN (PART A).dwg V1Nov 29, 2024 2:34 PMApproved

PGP-CGN2-GFC-5P-113B 5TH PODIUM PLAN –FLOOR PLAN (PART B).dwg V1Nov 29, 2024 2:34 PMApproved

Information Note: The drawings listed here are taken from the ACC Published Drawings Folder Log.

Drawings

PGP-CGN2-GFC-5P-113C 5TH PODIUM PLAN –FLOOR PLAN (CORE).dwg V1 11/29/2024 14:34 Approved

PGP-CGN2-GFC-5P-113 5TH PODIUM PLAN –FLOOR PLAN V3 Apr 11, 2025 8:04 PM

PGP-CGN2-GFC-5P-113A 5TH PODIUM PLAN –FLOOR PLAN (PART A) V3Apr 11, 2025 8:04 PM

PGP-CGN2-GFC-5P-113B 5TH PODIUM PLAN –FLOOR PLAN (PART B) V3Apr 11, 2025 8:04 PM

PGP-CGN2-GFC-5P-113C 5TH PODIUM PLAN –FLOOR PLAN (CORE) V3Apr 11, 2025 8:04 PM

PGP-CGN2-GFC-6P-114 6TH PODIUM PLAN –FLOOR PLAN.dwg V1 Dec 13, 2024 1:08 PM Approved w/ comments

PGP-CGN2-GFC-6P-114A 6TH PODIUM PLAN –FLOOR PLAN (PART A).dwg V1Dec 13, 2024 1:08 PM Approved w/ comments

PGP-CGN2-GFC-6P-114B 6TH PODIUM PLAN –FLOOR PLAN (PART B).dwg V1Dec 13, 2024 1:08 PMApproved w/ comments

PGP-CGN2-GFC-6P-114C 6TH PODIUM PLAN –FLOOR PLAN (LIFT CORE).dwg V1Dec 13, 2024 1:08 PM Approved

V2Dec 18, 2024 5:38 PM

PGP-CGN2-GFC-6P-114 6TH PODIUM PLAN –FLOOR PLAN

PGP-CGN2-GFC-6P-114A 6TH PODIUM PLAN –FLOOR PLAN (PART A) V2Dec 18, 2024 5:38 PM

PGP-CGN2-GFC-6P-114B

PGP-CGN2-GFC-14FP-117 14TH OFFICE FLOOR PLAN PART A.dwg V1Jan 29, 2025 7:19 PM

PGP-CGN2-GFC-14FP-117 14TH OFFICE FLOOR PLAN.dwg

FLOOR PLAN.dwg V1Apr 15, 2025 4:16 PM

PGP-CGN2-GFC-14FP-118 14TH OFFICE FLOOR PLAN V2Apr 15, 2025 4:17 PM

PGP-CGN2-GFC-14FP-118A

PGP-CGN2-GFC-14FP-118B 14TH OFFICE FLOOR PLAN PART B.dwg V1Apr 15, 2025 4:16 PM

PGP-CGN2-GFC-14FP-118B 14TH OFFICE FLOOR PLAN PART B V2Apr 15, 2025 4:17 PM

PGP-CGN2-GFC-14FP-118C 14TH OFFICE FLOOR PLAN CORE.dwg V1Apr 15, 2025 4:16 PM

PGP-CGN2-GFC-14FP-118C 14TH OFFICE FLOOR PLAN CORE V2Apr 15, 2025 4:17 PM

PGP-CGN2-GFC-SEC-300-SECTION A-A SUBSTRUCTURE.dwg V1 Aug 16, 2024 3:07 PM

PGP-CGN2-GFC-SEC-301-SECTION B-B SUBSTRUCTURE.dwg V1 Aug 16, 2024 3:07 PM

PGP-CGN2-GFC-SEC-302.dwg V1 Oct 8, 2024 5:51 PM Approved

PGP-CGN2-GFC-SEC-300-SECTION A-A SUBSTRUCTURE V1 Aug 9, 2024 1:02 PM

PGP-CGN2-GFC-SEC-301-SECTION B-B SUBSTRUCTURE V1Aug 9, 2024 1:02 PM

PGP-CGN2-GFC-SEC-302 -SECTION A-A' V2Dec 18, 2024 5:41 PM

PGP-CGN2-GFC-RMD-804 -RAMP DETAIL -PODIUM 2 LVL TO PODIUM 6 LVL..dwg V1 Oct 8, 2024 5:53 PMApproved w/ comments

PGP-CGN2-GFC-RMD1,2-800,801,802-RAMP DETAIL GROUND TO B2.dwg V2 Aug 21, 2024 12:24 PM

PGP-CGN2-GFC-RMD1,2-802-RAMP DETAIL PART SECTION GROUND TO B2 V2Aug 9, 2024 1:03 PM

PGP-CGN2-GFC-RMD1-800-RAMP DETAIL PART PLAN B1 TO B2 V2Aug 9, 2024 1:03 PM

PGP-CGN2-GFC-RMD1-800 V1Jun 7, 2024 5:28 PMApproved

PGP-CGN2-GFC-RMD1-801-RAMP DETAIL PART PLAN GROUND TO B1 V2Aug 9, 2024 1:03 PM

PGP-CGN2-GFC-RMD1-801 V1Jun 7, 2024 5:28 PMApproved

PGP-CGN2-GFC-RMD1-802 V1Jun 7, 2024 5:28 PM Approved

PGP-CGN2-GFC-RMD-803A RAMP DETAIL-PART PLAN -GF. TO P2 V2 Sep 26, 2024 12:42 PM

PGP-CGN2-GFC-RMD-803B RAMP DETAIL SECTION V2Sep 26, 2024 12:42 PM

PGP-CGN2-GFC-RMD-803C RAMP DETAIL PART SECTION-GF. TO P2 V2Sep 26, 2024 12:42 PM

PGP-CGN2-GFC-RMD-804 -RAMP DETAIL -PODIUM 2 LVL TO PODIUM 6 LVL. V1Dec 23, 2024 5:24 PM

PGP-CGN2-GFC-RMD-804 -RAMP DETAIL -PODIUM 2 LVL TO PODIUM 6 LVL. V1 Oct 8, 2024 5:53 PMApproved w/ comments

PGP-CGN2-GFC-ST1-600B -Staircase -1 Details.dwg V1Dec 18, 2024 6:50 PM

PGP-CGN2-GFC-ST2-601B -Staircase -2 Details.dwg V1Dec 18, 2024 6:50 PM

PGP-CGN2-GFC-ST3-602B -Staircase -3 Details.dwg V1Dec 18, 2024 6:50 PM

PGP-CGN2-GFC-ST1-600A-Staircase -1 Details.dwg

PGP-CGN2-GFC-ST2-601A-Staircase -2 Details.dwg

PGP-CGN2-GFC-ST3-602A-Staircase -3 Details.dwg

PGP-CGN2-GFC-ST4-603 -Staircase -4 Details.dwg

PGP-CGN2-GFC-ST1-600B -Staircase -1 Details

PGP-CGN2-GFC-ST2-601B -Staircase -2 Details

PGP-CGN2-GFC-ST3-602B -Staircase -3 Details

PGP-CGN2-GFC-ST1-600A-Staircase -1 Details

PGP-CGN2-GFC-ST2-601A-Staircase -2 Details

PGP-CGN2-GFC-ST3-602A-Staircase -3 Details

V1Dec 18, 2024 6:50 PM

V1Dec 18, 2024 6:50 PM

V1Dec 18, 2024 6:50 PM

V1Dec 18, 2024 6:50 PM

V1Dec 18, 2024 6:48 PM

V1Dec 18, 2024 6:48 PM

V1Dec 18, 2024 6:48 PM

V4Dec 18, 2024 6:44 PM

V2Dec 18, 2024 6:44 PM

V4Dec 18, 2024 6:44 PM

PGP-CGN2-GFC-ST4-603 -Staircase -4 Details V4Dec 18, 2024 6:44 PM

V1Dec 13, 2024 1:31 PMApproved w/ comments

PGP-CGN2-GFC-ST1-600A-Staircase -1 Details

PGP-CGN2-GFC-ST1-600B -Staircase -1 Details.dwg V1Dec 13, 2024 2:02 PMApproved w/ comments

PGP-CGN2-GFC-ST1-600B -Staircase -1 Details V1Dec 13, 2024 2:02 PM Approved w/ comments

PGP-CGN2-GFC-ST1-600C-Staircase -1 Details (P6 TO 20TH).dwg

PGP-CGN2-GFC-ST1-600C-Staircase -1 Details (P6 TO 20TH)

V1Apr 9, 2025 5:46 PM Approved w/ comments

V1Apr 9, 2025 5:46 PMApproved w/ comments

PGP-CGN2-GFC-ST1-601C-Staircase -2 Details (P6 TO 20TH).dwg V1Apr 9, 2025 5:46 PMApproved w/ comments

PGP-CGN2-GFC-ST1-601C-Staircase -2 Details (P6 TO 20TH) V1Apr 9, 2025 5:46 PM Approved w/ comments

PGP-CGN2-GFC-ST1-602C-Staircase -3 Details (P6 TO 20TH).dwg V1Apr 9, 2025 5:46 PM Approved w/ comments

PGP-CGN2-GFC-ST1-602C-Staircase -3 Details (P6 TO 20TH) V1Apr 9, 2025 5:46 PMApproved w/ comments

PGP-CGN2-GFC-ST2-601A-Staircase -2 Details

PGP-CGN2-GFC-ST2-601B -Staircase -2 Details.dwg

PGP-CGN2-GFC-ST2-601B -Staircase -2 Details

PGP-CGN2-GFC-ST3-602A-Staircase -3 Details

V1Dec 13, 2024 1:31 PMApproved w/ comments

V1Dec 13, 2024 2:02 PM Approved w/ comments

V1Dec 13, 2024 2:02 PM Approved w/ comments

V1Dec 13, 2024 1:31 PMApproved w/ comments

PGP-CGN2-GFC-ST3-602B -Staircase -3 Details.dwg V1Dec 13, 2024 2:02 PMApproved w/ comments

PGP-CGN2-GFC-ST3-602B -Staircase -3 Details V1Dec 13, 2024 2:02 PM Approved w/ comments

PGP-CGN2-GFC-ST4-603 -Staircase -4 Details V1Dec 13, 2024 1:31 PMApproved

PGP-CGN2-GFC-DD-836, 837 DOORS & ROLLING SHUTTER.dwg

PGP-CGN2-GFC-DD-836-DOORS SCHEDULE

PGP-CGN2-GFC-DD-836A-DOOR DETAIL-D1, D2, D3, D4

PGP-CGN2-GFC-DD-836B-DOOR DETAIL-FD1, FD2, FD3

PGP-CGN2-GFC-DD-836B-DOOR DETAIL-FD4, FD4A, FD6

PGP-CGN2-GFC-RSD-837A-ROLLING SHUTTER DETAIL-RS1, RS3

PGP-CGN2-GFC-RSD-837B-ROLLING SHUTTER DETAIL-RS2

PGP-CGN2-GFC-RSD-837C-ROLLING SHUTTER DETAIL-RS4

PGP-CGN2-GFC-SLV-812A-Retaining Wall Sleeve Details

PGP-CGN2-GFC-SLV-812B-Retaining Wall Sleeve Details

PGP-CGN2-GFC-SLV-812C-Retaining Wall Sleeve Details

PGP-CGN2-GFC-UGT1-810 -UGT Details -Ac Makeup, Flushing & Rainwater

PGP-CGN2-GFC-UGT1-811A -UGT Details -Fire & Domestic

PGP-CGN2-GFC-UGT1-811B -UGT Details -Fire & Domestic

PGP-CGN2-GFC-ABB-001-Abbreviation, Symbol, Mounting Ht.

PGP-CGN2-GFC-ABB-001

20240221 -Phase 4 -Sub-structure DD (G,B1,B2).dwg

Cignus 2 -Basement 1 Floor Plan -21.02.2024

V1 Aug 16, 2024 3:08 PM

V1 Jul 30, 2024 3:01 PM Approved

V1Jul 30, 2024 3:01 PM Approved w/ comments

V1Jul 30, 2024 3:01 PMApproved

V1Jul 30, 2024 3:01 PMApproved

V1Jul 30, 2024 3:01 PMApproved w/ comments

V1Jul 30, 2024 3:01 PM Approved w/ comments

V1Jul 30, 2024 3:01 PMApproved w/ comments

V1 Aug 19, 2024 5:03 PM Approved

V1 Aug 19, 2024 5:03 PM Approved

V1 Aug 19, 2024 5:03 PM Approved

V1 Aug 19, 2024 5:03 PM Approved

V1 Aug 19, 2024 5:03 PM Approved

V1 Aug 19, 2024 5:03 PM Approved

V1Jul 31, 2024 4:18 PMApproved

V1Jun 7, 2024 5:28 PMApproved

V1Nov 19, 2024 11:58 AMApproved

V1Nov 19, 2024 11:58 AM Approved

PGP-CGN2-GFC-7FP-115 7TH OFFICE FLOOR PLAN PART A V1Jan 16, 2025 3:15 PM

PGP-CGN2-GFC-7FP-115 7TH OFFICE FLOOR PLAN PART B V1Jan 16, 2025 3:15 PM

PGP-CGN2-GFC-7FP-115 7TH OFFICE FLOOR PLAN PART C V1Jan 16, 2025 3:15 PM

PGP-CGN2-GFC-7FP-115 7TH OFFICE FLOOR PLAN V1Jan 16, 2025 3:15 PM

PGP-CGN2-GFC-TYFP-116 8TH-13TH, 15TH TYPICALOFFICE FLOOR PLAN V1Jan 16, 2025 5:11 PM

PGP-CGN2-GFC-TYFP-116A 8TH-13TH, 15TH TYPICALOFFICE FLOOR PLAN-PART A V1Jan 16, 2025 5:11 PM

PGP-CGN2-GFC-TYFP-116B 8TH-13TH, 15TH TYPICALOFFICE FLOOR PLAN-PART B V1Jan 16, 2025 5:11 PM

PGP-CGN2-GFC-TYFP-116C 8TH-13TH, 15TH TYPICALOFFICE FLOOR PLAN-CORE V1Jan 16, 2025 5:11 PM

PGP-CGN2-GFC-5P-113 5TH PODIUM PLAN –FLOOR PLAN V1Mar 27, 2025 3:51 PMApproved

PGP-CGN2-GFC-5P-113A 5TH PODIUM PLAN –FLOOR PLAN (PART A) V1Mar 27, 2025 3:51 PMApproved

PGP-CGN2-GFC-5P-113B 5TH PODIUM PLAN –FLOOR PLAN (PART B) V1Mar 27, 2025 3:51 PMApproved

PGP-CGN2-GFC-5P-113C 5TH PODIUM PLAN –FLOOR PLAN (CORE) V1Mar 27, 2025 3:51 PM Approved

PGP-CGN2-GFC-TYP-116 D–7TH-20TH FLOOR SLAB EDGE (CURVE SETTING OUT) .dwg V1 May 8, 2025 4:06 PMApproved

PGP-CGN2-GFC-TYP-116 D–7TH-20TH FLOOR SLAB EDGE (CURVE SETTING OUT) V1May 8, 2025 4:07 PMApproved

PGP-CGN2-GFC-TYP-116 E–7TH-20TH FLOOR SLAB EDGE (CURVE SETTING OUT) V1May 8, 2025 4:07 PMApproved

PGP-CGN2-GFC-TYP-116 F–7TH-20TH FLOOR SLAB EDGE (CURVE SETTING OUT) V1May 8, 2025 4:06 PM Approved

PGP-CGN2-GFC-TYP-116 G–7TH-20TH FLOOR SLAB EDGE (CURVE SETTING OUT) V1May 8, 2025 4:06 PMApproved

THE DRAWINGS LISTED HERE ARE TAKEN FROM THE

8632(B)-COMM-7TH-11TH-RF-S-52

8632(B)-COMM-7TH-11TH-RF-S-52

8632(B)-COMM-8TH-S-24

8632(B)-COMM-8TH-S-24

8632(B)-COMM-11TH-S-25

8632(B)-COMM-11TH-S-25

8632(B)-COMM-12TH-S-26

8632(B)-COMM-12TH-S-26

8632(B)-COMM-12TH-15TH-RF-S-53

8632(B)-COMM-12TH-15TH-RF-S-53

8632(B)-COMM-7TH-S-23

8632(B)-COMM-7TH-S-23

8632(B)-COMM-14TH-S-27

8632(B)-COMM-14TH-S-27

8632(B)-COMM-15TH-S-28

8632(B)-COMM-15TH-S-28

8632(B)-COMM-16TH-20TH-RF-S-054

8632(B)-COMM-16TH-20TH-RF-S-054

8632(B)-COMM-B1-RF-S-013 TO 018-R0

8632(B)-COMM-B1-RF-S-013-R0

8632(B)-COMM-B1-RF-S-014-R0

8632(B)-COMM-B1-RF-S-015-R0

8632(B)-COMM-B1-RF-S-016-R0

8632(B)-COMM-B1-RF-S-017-R0

8632(B)-COMM-B1-RF-S-018-R0

8632(B)-COMM-B1-RF-S-013 TO 018

8632(B)-COMM-B1-RF-S-013

8632(B)-COMM-B1-RF-S-014

8632(B)-COMM-B1-RF-S-015

8632(B)-COMM-B1-RF-S-016

8632(B)-COMM-B1-RF-S-017

8632(B)-COMM-B1-RF-S-018

V1 Feb 4, 2025 5:31 PM Approved

V1 Feb 4, 2025 5:31 PM Approved

V3 Apr 29, 2025 10:34 AMApproved

V5 Apr 30, 2025 1:04 PM

V2Apr 29, 2025 4:50 PMApproved

V4Apr 30, 2025 1:12 PM

V2Apr 29, 2025 4:49 PMApproved

V4 Apr 30, 2025 1:12 PM

V1 Feb 4, 2025 5:33 PM Approved

V1 Feb 4, 2025 5:33 PM Approved

V4Apr 29, 2025 4:46 PM Approved w/ comments

V7 Apr 30, 2025 1:02 PM

V2Apr 29, 2025 4:54 PM Approved w/ comments

V4Apr 30, 2025 1:12 PM

V2Apr 29, 2025 4:57 PMApproved w/ comments

V4 Apr 30, 2025 1:12 PM

V1 Feb 21, 2025 5:30 PMApproved

V1Feb 21, 2025 5:30 PMApproved

V3 Oct 24, 2024 5:16 PM

V3Oct 24, 2024 5:17 PM

V3 Oct 24, 2024 5:17 PM

V3Oct 24, 2024 5:16 PM

V3Oct 24, 2024 5:16 PM

V3Oct 24, 2024 5:16 PM

V3 Oct 24, 2024 5:17 PM

V3Jan 17, 2025 1:14 PMApproved

V2Jan 8, 2025 11:48 PM

V2Jan 8, 2025 11:48 PM

V3Jan 8, 2025 11:48 PM

V2Jan 8, 2025 11:48 PM

V3Jan 8, 2025 11:48 PM

V1Jan 17, 2025 1:14 PM Approved

8632(B)-COMM-B1-SK-011 V2 Mar 10, 2025 12:55 PM

8632(B)-COMM-B1-SK-011

8632(B)-COMM-B2-RF-S-01

8632(B)-COMM-B2-RF-S-02

8632(B)-COMM-B2-RF-S-03

8632(B)-COMM-B2-RF-S-04

8632(B)-COMM-B2-RF-S-01 TO 07-R1

8632(B)-COMM-B2-RF-S-01

8632(B)-COMM-B2-RF-S-02

8632(B)-COMM-B2-RF-S-03

8632(B)-COMM-B2-RF-S-04

8632(B)-COMM-B2-RF-S-05

8632(B)-COMM-B2-RF-S-06

8632(B)-COMM-B2-RF-S-07

8632(B)-COMM-B2-RF-S-08

8632(B)-COMM-B2-RF-S-08

8632(B)-COMM-B1-S-01 -PLAN AT BASEMENT -1 LEVEL AND SECTIONS

8632(B)-COMM-B1-S-01 -PLAN AT BASEMENT -1 LEVEL AND SECTIONS

8632(B)-COMM-B1-S-02 -PLAN AT BASEMENT -1 LEVEL SECTIONS

8632(B)-COMM-B1-S-02 -PLAN AT BASEMENT -1 LEVEL SECTIONS

8632(B)-COMM-B1-S-01

8632(B)-COMM-B1-S-01

8632(B)-COMM-B1-S-02

8632(B)-COMM-B1-S-02

8632(B)-COMM-B2-S-01 & 02-R0-BASEMENT-2 LEVEL-17-05-2024

8632(B)-COMM-B2-S-01, 02 & 03-1

8632(B)-COMM-B2-S-01-R0-BASEMENT-2 LEVEL PLAN & DETAILS

8632(B)-COMM-B2-S-01

8632(B)-COMM-B2-S-02-R0-BASEMENT-2 LEVEL SECTIONAL DETAILS-SH 1

8632(B)-COMM-B2-S-03-1

8632(B)-COMM-B2-S-03-R0-BASEMENT-2 LEVEL SECTIONAL DETAILS-SH 2

V1Nov 18, 2024 5:34 PMApproved

V1Nov 18, 2024 5:34 PMApproved

V1Nov 18, 2024 5:34 PMApproved

V1Nov 18, 2024 5:34 PMApproved

V1 Oct 24, 2024 6:00 PM

V1 Oct 24, 2024 6:00 PM Approved

V1Oct 24, 2024 6:00 PMApproved

V5Apr 15, 2025 4:35 PM

V5Apr 15, 2025 4:35 PM

V1Jun 10, 2024 2:51 PM Approved w/ comments

V3Jun 19, 2024 2:43 PM

V1Jun 10, 2024 2:51 PMApproved w/ comments

V3Jun 19, 2024 2:43 PM

V2Jan 7, 2025 5:31 PM

V2Jan 7, 2025 5:13 PM

V2Jan 7, 2025 5:31 PM

V2Jan 7, 2025 5:13 PM

V1May 30, 2024 2:47 PMApproved

V1Oct 24, 2024 6:01 PMApproved

V2Jun 19, 2024 1:51 PM

V1 Oct 24, 2024 6:01 PM Approved

V2Jun 19, 2024 1:51 PM

V1Oct 24, 2024 6:01 PMApproved

V2Jun 19, 2024 1:51 PM

8632(B)-COMM-B2-S-01, 02 & 03 V1 Nov

8632(B)-COMM-B2-S-01

8632(B)-COMM-B2-S-02

8632(B)-COMM-B2-S-03

8632(B)-COMM-B2-SK-03-R0

8632(B)-COMM-B2-SK-03-R0

8632(B)-COMM-EXC-S-01-R0-EXCAVATION LEVEL PLAN-24-04-2024 1

8632(B)-COMM-EXC-S-01-R0-EXCAVATION LEVEL PLAN

8632(B)-COMM-SW-RF-S-09

V2Mar 10, 2025 12:55 PM

V1Oct 24, 2024 6:00 PM

V1Oct 24, 2024 6:00 PM Approved

V1 Oct 24, 2024 6:00 PM Approved

V1Oct 24, 2024 6:00 PM

V2Oct 24, 2024 4:57 PM

8632(B)-COMM-B2-RF-S-01 TO 07 V1Oct 24, 2024 4:57 PM

8632(B)-COMM-B2-RF-S-01-05-R0-BASEMENT-2 LEVEL REINF.DETAILS V3 May 30, 2024 9:06 PM

8632(B)-COMM-B2-RF-S-01-R0-BASEMENT-2 LEVEL BOTTOM REINF.IN RAFT-SHEET 1 V3Jun 14, 2024 9:28 PM

8632(B)-COMM-B2-RF-S-01-R0-BASEMENT-2 LEVEL REINF.DETAILS-SH 1 V1Oct 24, 2024 4:57 PM

V2Oct 24, 2024 4:57 PM

8632(B)-COMM-B2-RF-S-01-R1

8632(B)-COMM-B2-RF-S-02-R0-BASEMENT-2 LEVEL BOTTOM REINF.IN RAFT-SHEET 2 V3Jun 14, 2024 9:29 PM

8632(B)-COMM-B2-RF-S-02-R0-BASEMENT-2 LEVEL REINF.DETAILS-SH 2 V1Oct 24, 2024 4:57 PM

8632(B)-COMM-B2-RF-S-02-R1

8632(B)-COMM-B2-RF-S-02

V2Oct 24, 2024 4:57 PM

V1Oct 24, 2024 4:57 PM

8632(B)-COMM-B2-RF-S-03-R0-BASEMENT-2 LEVEL REINF.DETAILS-SH 3 V1 Oct 24, 2024 4:57 PM

8632(B)-COMM-B2-RF-S-03-R0-BASEMENT-2 LEVEL TOP REINF.IN RAFT-SHEET 1 V3Jun 14, 2024 9:29 PM

8632(B)-COMM-B2-RF-S-03-R1

8632(B)-COMM-B2-RF-S-03

V2Oct 24, 2024 4:57 PM

V1Oct 24, 2024 4:57 PM

8632(B)-COMM-B2-RF-S-04-R0-BASEMENT-2 LEVEL REINF.DETAILS-SH 4 V1 Oct 24, 2024 4:57 PM

8632(B)-COMM-B2-RF-S-04-R0-BASEMENT-2 LEVEL TOP REINF.IN RAFT-SHEET 2

8632(B)-COMM-B2-RF-S-04-R1

8632(B)-COMM-B2-RF-S-05-R0-BASEMENT-2 LEVEL DETAILS OF RAFT & RET WALLS

V3Jun 14, 2024 9:29 PM

V2Oct 24, 2024 4:57 PM

V2Jun 14, 2024 9:29 PM

8632(B)-COMM-B2-RF-S-05-R0-BASEMENT-2 LEVEL REINF.DETAILS-SH 5 V1 Oct 24, 2024 4:57 PM

V2Oct 24, 2024 4:57 PM

8632(B)-COMM-B2-RF-S-05-R1

8632(B)-COMM-B2-RF-S-06-R0-BASEMENT-2 LEVEL DETAILS OF LIFT PIT, SUMP AND DRAIN CHANNEL

8632(B)-COMM-B2-RF-S-06-R0-BASEMENT-2 LEVEL DETAILS OF LIFT PIT, SUMP AND DRAIN CHANNEL

8632(B)-COMM-B2-RF-S-06-R1

8632(B)-COMM-B2-RF-S-06

8632(B)-COMM-B2-RF-S-07-R0

8632(B)-COMM-B2-RF-S-07-R0

8632(B)-COMM-B2-RF-S-07-R1

8632(B)-COMM-B2-RF-S-07

8632(B)-COMM-B2-RF-S-07A-R0

8632(B)-COMM-B2-RF-S-07A-R0

8632(B)-COMM-B2-SK-03-R0

8632(B)-COMM-B2-SK-03-R0

8632(B)-COMM-B2-RF-S-01 TO 07

V1Oct 24, 2024 4:57 PM

V2 Oct 24, 2024 4:57 PM

V2 Oct 24, 2024 4:57 PM

V1Oct 24, 2024 4:57 PM

V2Oct 24, 2024 4:57 PM

V2Oct 24, 2024 4:57 PM

V2 Oct 24, 2024 4:57 PM

V1Oct 24, 2024 4:57 PM

V1 Sep 25, 2024 12:08 AM

V1 Sep 25, 2024 12:08 AM

V1 Sep 30, 2024 5:39 PM

V1 Sep 30, 2024 5:39 PM

V2Jan 18, 2025 1:45 PM

8632(B)-COMM-SW-RF-S-10

8632(B)-COMM-SW-RF-S-08-10

8632(B)-COMM-COL-RF-S-11,12 & 12A

8632(B)-COMM-COL-RF-S-11

8632(B)-COMM-COL-RF-S-12

8632(B)-COMM-COL-RF-S-12A

8632(B)-COMM-COL-RF-S-34

8632(B)-COMM-COL-RF-S-34

8632(B)-COMM-COL-RF-S-36,S-37

8632(B)-COMM-COL-RF-S-36

8632(B)-COMM-COL-RF-S-36

8632(B)-COMM-COL-RF-S-37

8632(B)-COMM-COL-RF-S-58 & S-59

8632(B)-COMM-COL-RF-S-58

8632(B)-COMM-COL-RF-S-59

8632(B)-COMM-COL-RF-SK-09-REINF.DETAILS OF COLUMN-PC14

8632(B)-COMM-COL-RF-SK-09-REINF.DETAILS OF COLUMN-PC14

8632(B)-COMM-SW-RF-S-08-10A

8632(B)-COMM-SW-RF-S-08

8632(B)-COMM-SW-RF-S-09

8632(B)-COMM-SW-RF-S-10

8632(B)-COMM-SW-RF-S-10A

8632(B)-COMM-SW-RF-S-38,S-39 ,S-40 & S-41,S-41A

8632(B)-COMM-SW-RF-S-38

8632(B)-COMM-SW-RF-S-39

8632(B)-COMM-SW-RF-S-40

8632(B)-COMM-SW-RF-S-41

8632(B)-COMM-SW-RF-S-41A

8632(B)-COMM-SW-RF-S-55,S56 & S-57

8632(B)-COMM-SW-RF-S-55

8632(B)-COMM-SW-RF-S-56

8632(B)-COMM-SW-RF-S-57

8632(B)-COMM-SW-RF-S-61,S-62&S-63

8632(B)-COMM-SW-RF-S-61

8632(B)-COMM-SW-RF-S-62

8632(B)-COMM-SW-RF-S-63

8632(B)-COMM-SW-RF-SK-12-R0-REINF.DETAILS OF LIFT WALL ( LW9)

8632(B)-COMM-SW-RF-SK-12-REINF.DETAILS OF LIFT WALL (LW9)

2024 4:21 PM Approved

V1Oct 24, 2024 6:01 PMApproved

V2Dec 4, 2024 7:33 PM

V1 Oct 24, 2024 6:01 PM

V1May 16, 2024 2:36 PMApproved

V2Jun 19, 2024 1:51 PM

V3Jun 19, 2024 2:47 PM

V3Jun 19, 2024 2:47 PM

V3Jun 19, 2024 2:55 PM

V5 Dec 7, 2024 5:14 PM

V5Dec 7, 2024 4:56 PM

V5Dec 7, 2024 4:56 PM

V1Dec 7, 2024 4:56 PM

V1 Dec 24, 2024 5:20 PM Approved

V1Dec 24, 2024 5:19 PMApproved

V1Jan 2, 2025 5:04 PMApproved

V1Dec 24, 2024 5:20 PMApproved w/ comments

V2Jan 2, 2025 5:04 PM Approved

V1Jan 2, 2025 5:04 PMApproved

V1Mar 26, 2025 5:54 PMApproved

V1Mar 26, 2025 5:54 PMApproved

V1Mar 26, 2025 5:54 PM Approved

V2Dec 24, 2024 7:35 PM

V2Dec 24, 2024 7:35 PM

V2Dec 7, 2024 4:56 PM

V4 Dec 6, 2024 1:24 PM Approved

V2Dec 6, 2024 1:24 PMApproved

V2Dec 6, 2024 1:24 PMApproved

V2Dec 7, 2024 4:56 PM

V1Dec 31, 2024 5:19 PM Approved

V1Dec 31, 2024 5:19 PMApproved

V1Dec 31, 2024 5:19 PMApproved

V1Dec 31, 2024 5:19

PMApproved

V1Dec 31, 2024 5:19 PM Approved

V1Dec 31, 2024 5:19

PMApproved

V1 Feb 4, 2025 5:30 PM Approved

V1 Feb 4, 2025 5:30 PM Approved

V1 Feb 4, 2025 5:30 PM Approved

V1 Feb 4, 2025 5:30 PM Approved

V2 Mar 5, 2025 11:57 AM

V1Feb 21, 2025 5:27 PMApproved

V2 Mar 5, 2025 11:57 AM

V1Feb 21, 2025 5:27 PMApproved

V1Mar 10, 2025 1:09 PM

V1Mar 10, 2025 1:09 PM

The drawings listed here are taken from the

8632(B)-COMM-B1-S-01 -PLAN AT BASEMENT -1 LEVEL AND SECTIONS

8632(B)-COMM-B1-S-02 -PLAN AT BASEMENT -1 LEVEL SECTIONS

8632(B)-COMM-B2-S-01-R0-BASEMENT-2 LEVEL PLAN & DETAILS

V1Jun 17, 2024 8:57 AM

V1Jun 17, 2024 8:57 AM

V1Jun 17, 2024 8:57 AM

8632(B)-COMM-B2-S-02-R0-BASEMENT-2 LEVEL SECTIONAL DETAILS-SH 1 V1Jun 17, 2024 8:57 AM

8632(B)-COMM-B2-S-03-R0-BASEMENT-2 LEVEL SECTIONAL DETAILS-SH 2 V1Jun 17, 2024 8:57 AM

8632(B)-COMM-EXC-S-01-R0-EXCAVATION LEVEL PLAN V1Jun 17, 2024 8:57 AM

8632(B)-COMM-GR-S-03-PLAN AT GROUND FLOOR LEVEL AND SECTIONS V1Jun 17, 2024 8:57 AM

8632(B)-COMM-GR-S-04-PLAN AT GROUND FLOOR SECTIONS V1Jun 17, 2024 8:57 AM

8632(B)COMM-GEN-S-002-R0-GENERAL NOTES

8632(B)COMM-GEN-S-002-R0-GENERAL NOTES

V1Jun 1, 2024 1:01 PMApproved

V1Jun 1, 2024 1:01 PMApproved

8632(B)COMM-TRD-COL-S-003-R0-DETAIL OF COLUMN FOR COUPLER ARRANGEMENT-Model V1Jun 1, 2024 1:01 PM Approved w/ comments

8632(B)COMM-TRD-COL-S-003-R0-DETAIL OF COLUMN FOR COUPLER ARRANGEMENT V1 Jun 1, 2024 1:01 PMApproved w/ comments

8632(B)COMM-TRD-S-001-R0-TYPICAL REINFORCEMENT DETAILS-Model V1Jun 1, 2024 1:01 PMApproved w/ comments

8632(B)COMM-TRD-S-001-R0-TYPICAL REINFORCEMENT DETAILS V1Jun 1, 2024 1:01 PM Approved w/ comments

8632(B)-COMM-GR-S-03-PLAN AT GROUND FLOOR LEVEL AND SECTIONS V2 Jun 18, 2024 7:12 PM

8632(B)-COMM-GR-S-03-PLAN AT GROUND FLOOR LEVEL AND SECTIONS V4Jun 19, 2024 4:14 PM

8632(B)-COMM-GR-S-03

8632(B)-COMM-GR-S-03

8632(B)-COMM-GR-S-04-PLAN AT GROUND FLOOR SECTIONS

8632(B)-COMM-GR-S-04-PLAN AT GROUND FLOOR SECTIONS

8632(B)-COMM-GR-S-04

8632(B)-COMM-GR-S-04

V1Jan 15, 2025 5:57 PMApproved w/ comments

V2Jan 18, 2025 2:08 PM

V2Jun 18, 2024 7:12 PM

V4Jun 19, 2024 4:14 PM

V1Jan 15, 2025 5:57 PM Approved

V2Jan 18, 2025 2:08 PM

8632(B)-COMM-GR-RF-S-019 -R0 V2 Oct 24, 2024 5:22 PM

8632(B)-COMM-GR-RF-S-019 TO 022-R0

8632(B)-COMM-GR-RF-S-019 TO 024-R0-REINF.DETAILS OF BEAM &SLAB AT GROUND LEVEL-18-06-2024

8632(B)-COMM-GR-RF-S-019-R0-REINF.DETAILS OF BEAM AT GROUND LEVEL-18-06-2024-Layout1 (2)

8632(B)-COMM-GR-RF-S-020 -R0

8632(B)-COMM-GR-RF-S-020-R0-REINF.DETAILS OF BEAM AT GROUND LEVEL-18-06-2024-Layout1

V2Oct 24, 2024 5:21 PM

V1 Sep 20, 2024 2:33 PM

V1 Sep 20, 2024 2:32 PM

V2Oct 24, 2024 5:21 PM

V1 Sep 20, 2024 2:32 PM

8632(B)-COMM-GR-RF-S-021 -R0 V2 Oct 24, 2024 5:21 PM

8632(B)-COMM-GR-RF-S-021-R0-REINF.DETAILS OF BEAM AT GROUND LEVEL-18-06-2024-Layout1

8632(B)-COMM-GR-RF-S-022 -R0

8632(B)-COMM-GR-RF-S-022-R0-REINF.DETAILS OF BEAM AT GROUND LEVEL-18-06-2024-Layout1

8632(B)-COMM-GR-RF-S-023-R0-REINF.DETAILS OF BEAM AT GROUND LEVEL-18-06-2024-Layout1

8632(B)-COMM-GR-RF-S-024-R0-REINF.DETAILS OF BEAM AT GROUND LEVEL-18-06-2024-Layout1

8632(B)-COMM-GR-RF-S-025-R0-REINF.DETAILS OF SLAB AT GROUND LEVEL-19-06-2024-Layout1

8632(B)-COMM-GR-RF-S-025-R0-REINF.DETAILS OF SLAB AT GROUND LEVEL-19-06-2024

8632(B)-COMM-GR-RF-S-019 TO 024

8632(B)-COMM-GR-RF-S-019

8632(B)-COMM-GR-RF-S-020

8632(B)-COMM-GR-RF-S-021

8632(B)-COMM-GR-RF-S-022

8632(B)-COMM-GR-RF-S-023

8632(B)-COMM-GR-RF-S-024

8632(B)-COMM-GR-RF-S-025

8632(B)-COMM-GR-RF-S-025

8632(B)-COMM-1ST POD-RF-S-042

8632(B)-COMM-1ST POD-RF-S-042

8632(B)-COMM-P2 TO P6 POD-RF-S-043

8632(B)-COMM-P2 TO P6 POD-RF-S-043

8632(B)-COMM-1STPOD-S-12-R0

8632(B)-COMM-1STPOD-S-12-R0

8632(B)-COMM-1STPOD-S-12

8632(B)-COMM-1STPOD-S-12

8632(B)-COMM-1STPOD-SK-23-R0

8632(B)-COMM-1STPOD-SK-23-R0

8632(B)-COMM-2NDPOD-S-13-R0

8632(B)-COMM-2NDPOD-S-13-R0

8632(B)-COMM-1STPOD-S-12

8632(B)-COMM-2NDPOD-S-13

8632(B)-COMM-2NDPOD-S-13

8632(B)-COMM-CAN-S-13A

8632(B)-COMM-CAN-S-13A

8632(B)-COMM-3RDPOD-S-14

8632(B)-COMM-3RDPOD-S-14

8632(B)-COMM-4THPOD-S-15

8632(B)-COMM-4THPOD-S-15

8632(B)-COMM-4THPOD-SK-20-R0-BEAM DETAILS AT4TH PODIUM LEVEL

8632(B)-COMM-4THPOD-SK-20-R0-BEAM DETAILS AT4TH PODIUM

8632(B)-COMM-5THPOD-S-16

8632(B)-COMM-5THPOD-S-16

V1Jun 21, 2025 4:37 PM

8632(B)-COMM-6THPOD-S-17 V4Mar 12, 2025 6:47 PM

8632(B)-COMM-6THPOD-S-17

8632(B)-COMM-COL-SK-S-01-DETAILS OF COLUMNS-B2 TO GR V1 Aug

8632(B)-COMM-RAMP-S-31-R0

8632(B)-COMM-RAMP-S-31-R0

8632(B)-COMM-ST-RF-S-27-R0

8632(B)-COMM-ST-RF-S-27-R0

8632(B)-COMM-ST-RF-S-28-R0

8632(B)-COMM-ST-RF-S-28-R0

8632(B)-COMM-ST-RF-S-29-R0

8632(B)-COMM-ST-RF-S-29-R0

8632(B)-COMM-TANK-S-32-R0

8632(B)-COMM-TANK-S-32-R0

8632(B)-COMM-WT-01-S-05-R0

8632(B)-COMM-WT-01-S-05-R0

8632(B)-COMM-WT-02-S-06-R0

8632(B)-COMM-WT-02-S-06-R0

8603(B)-COMM-RM-SK-14-LEGEND OF RAMP STEEL BEAM

8603(B)-COMM-RM-SK-14-LEGEND OF RAMP STEEL BEAM

8632(B) COMM RAMP S-21

8632(B) COMM RAMP S-22

8632(B)-COMM-RAMP-S-31

8632(B)-COMM-RAMP-S-31

8632(B)-COMM-RM-RF-S-48

8632(B)-COMM-RM-RF-S-48

V1 Sep 20, 2024 2:32 PM

V3Oct 24, 2024 5:22 PM

V1 Sep 20, 2024 2:32 PM

V1 Sep 20, 2024 2:32 PM

V1 Sep 20, 2024 2:32 PM

V1 Sep 20, 2024 2:32 PM

V1 Sep 20, 2024 2:33 PM

V1Jan 17, 2025 5:24 PMApproved

V1Jan 17, 2025 5:24 PMApproved w/ comments

V1Jan 17, 2025 5:24 PM Approved w/ comments

V1Jan 17, 2025 5:24 PMApproved w/ comments

V1Jan 17, 2025 5:24 PMApproved

V1Jan 17, 2025 5:24 PM Approved

V1Jan 17, 2025 5:24 PMApproved

V1Jan 18, 2025 8:02 PM

V1Jan 18, 2025 8:02 PM

V2Jan 18, 2025 6:06 PM

V2Jan 18, 2025 6:06 PM

V2Jan 18, 2025 6:06 PM

V2Jan 18, 2025 6:06 PM

V2 Sep 25, 2024 7:50 PM

V3 Sep 26, 2024 7:10 PM

V6Jun 30, 2025 8:43 AM

V9Jun 30, 2025 8:40 AM

V1Jun 21, 2025 4:24 PM

V1Jun 21, 2025 4:24 PM

V2 Sep 25, 2024 7:49 PM

V3 Sep 26, 2024 7:11 PM

V1Jun 30, 2025 8:41 AM

V6Jun 30, 2025 8:43 AM

V9Jun 30, 2025 8:40 AM

V1 Mar 4, 2025 10:35 AM Approved w/ comments

V1 Mar 4, 2025 10:35 AM Approved w/ comments

V3 Mar 12, 2025 6:52 PM

V5Mar 12, 2025 6:52 PM

V5Jun 21, 2025 4:31 PMApproved

V7Jun 21, 2025 4:31 PMApproved

V1Jun 21, 2025 4:37 PM

V2Feb 5, 2025 9:34 AM

V1Jan 18, 2025 8:24 PM

8632(B)-COMM-RM-S-11 V1Feb 12, 2025 6:01 PM Rejected

8632(B)-COMM-RM-S-21 V3 Mar 28, 2025 7:24 AM

8632(B)-COMM-RM-S-21 V3Jan 23, 2025 4:15 PM

8632(B)-COMM-RM-S-22 V2Mar 26, 2025 5:56 PMApproved

8632(B)-COMM-RM-S-22

8632(B)-COMM-ST-01-RF-S-45

8632(B)-COMM-ST-01-RF-S-45

8632(B)-COMM-ST-01-S-07

8632(B)-COMM-ST-01-S-07

8632(B)-COMM-ST-01-S-18

8632(B)-COMM-ST-01-S-18

8632(B)-COMM-ST-01-S-33

8632(B)-COMM-ST-01-S-33

8632(B)-COMM-ST-02-RF-S-46

8632(B)-COMM-ST-02-RF-S-46

8632(B)-COMM-ST-02-S-08

8632(B)-COMM-ST-02-S-08

8632(B)-COMM-ST-02-S-19

8632(B)-COMM-ST-02-S-19

8632(B)-COMM-ST-02-S-34

8632(B)-COMM-ST-02-S-34

8632(B)-COMM-ST-03-RF-S-47

8632(B)-COMM-ST-03-RF-S-47

8632(B)-COMM-ST-03-S-09

8632(B)-COMM-ST-03-S-09

8632(B)-COMM-ST-03-S-20

8632(B)-COMM-ST-03-S-20

8632(B)-COMM-ST-03-S-35

8632(B)-COMM-ST-03-S-35

8632(B)-COMM-ST-04-S-10

8632(B)-COMM-ST-04-S-10

8632(B)-COMM-ST-RF-S-27

8632(B)-COMM-ST-RF-S-27

8632(B)-COMM-ST-RF-S-28

8632(B)-COMM-ST-RF-S-28

8632(B)-COMM-ST-RF-S-29

8632(B)-COMM-ST-RF-S-29

8632(B)-COMM-ST-RF-S-30

V3Jan 23, 2025 4:15 PM

V1Jan 17, 2025 3:23 PMApproved

V1Jan 17, 2025 3:23 PMApproved

V1Jan 2, 2025 12:00 PMApproved

V2Jan 7, 2025 5:14 PM

V2Jan 21, 2025 10:35 AMApproved

V3Jan 23, 2025 4:17 PM

V1Mar 10, 2025 2:34 PMApproved

V1Mar 10, 2025 2:34 PMApproved

V1Jan 17, 2025 3:23 PMApproved

V1Jan 17, 2025 3:23 PMApproved

V1Jan 2, 2025 12:00 PMApproved

V2Jan 7, 2025 5:19 PM

V2Jan 21, 2025 10:35 AMApproved

V3Jan 23, 2025 4:17 PM

V1Mar 10, 2025 2:34 PMApproved

V1Mar 10, 2025 2:34 PMApproved

V1Jan 17, 2025 3:23 PMApproved

V1Jan 17, 2025 3:23 PMApproved

V1Jan 2, 2025 12:00 PMApproved

V2Jan 7, 2025 5:19 PM

V2Jan 21, 2025 10:35 AMApproved

V3Jan 23, 2025 4:17 PM

V1Mar 10, 2025 2:34 PMApproved

V1Mar 10, 2025 2:34 PMApproved

V1Jan 2, 2025 12:00 PMApproved

V1Jan 7, 2025 5:19 PM

V1Jan 17, 2025 3:43 PMApproved

V1Jan 17, 2025 3:43 PMApproved

V1Jan 17, 2025 3:43 PMApproved

V1Jan 17, 2025 3:43 PMApproved

V1Jan 17, 2025 3:43 PMApproved

V1Jan 17, 2025 3:43 PMApproved

V1Jan 18, 2025 5:38 PM

8632(B)-COMM-ST-RF-S-30 V1Jan 18, 2025 5:38 PM

8632(B)-COMM-TANK-S-32

PMApproved

8632(B)-COMM-TANK-S-32 V1Dec 31, 2024 3:54 PMApproved

8632(B)-COMM-WT-01-S-05

V1Jan 15, 2025 5:40 PMApproved

8632(B)-COMM-WT-01-S-05 V1Jan 15, 2025 5:40 PMApproved

8632(B)-COMM-WT-02-RF-S-33 V1Dec 30, 2024 2:44 PMApproved w/ comments

8632(B)-COMM-WT-02-RF-S-33

8632(B)-COMM-WT-02-S-06

8632(B)-COMM-WT-02-S-06

8632(B)-COMM-1STPOD-S-12

8632(B)-COMM-B1-RF-S-013 TO 018-R0

8632(B)-COMM-B1-RF-S-013-R0

8632(B)-COMM-B1-RF-S-014-R0

8632(B)-COMM-B1-RF-S-015-R0

8632(B)-COMM-B1-RF-S-016-R0

8632(B)-COMM-B1-RF-S-017-R0

8632(B)-COMM-B1-RF-S-018-R0

8632(B)-COMM-B2-RF-S-01 TO 07-R1

8632(B)-COMM-B2-RF-S-01 TO 07

8632(B)-COMM-B2-RF-S-01-R0-BASEMENT-2 LEVEL REINF.DETAILS-SH 1

8632(B)-COMM-B2-RF-S-01-R1

8632(B)-COMM-B2-RF-S-02-R0-BASEMENT-2 LEVEL REINF.DETAILS-SH 2

8632(B)-COMM-B2-RF-S-02-R1

8632(B)-COMM-B2-RF-S-02

8632(B)-COMM-B2-RF-S-03-R0-BASEMENT-2 LEVEL REINF.DETAILS-SH 3

8632(B)-COMM-B2-RF-S-03-R1

8632(B)-COMM-B2-RF-S-03

8632(B)-COMM-B2-RF-S-04-R0-BASEMENT-2 LEVEL REINF.DETAILS-SH 4

8632(B)-COMM-B2-RF-S-04-R1

8632(B)-COMM-B2-RF-S-05-R0-BASEMENT-2 LEVEL REINF.DETAILS-SH 5

8632(B)-COMM-B2-RF-S-05-R1

V1 Jan 15, 2025 5:40 PM Approved

V1Jan 15, 2025 5:40 PMApproved

V1 Feb 8, 2025 10:00 AM

V1Jun 19, 2024 5:14 PMApproved

V1Jun 19, 2024 5:14 PMApproved

V1Jun 19, 2024 5:15 PMApproved

V1Jun 19, 2024 5:14 PMApproved

V1Jun 19, 2024 5:14 PMApproved

V1Jun 19, 2024 5:14 PMApproved

V1Jun 19, 2024 5:14 PMApproved

V1 Sep 30, 2024 12:05 PM Approved w/ comments

V1 Oct 23, 2024 3:32 PM Approved

V1May 29, 2024 11:00 AM Approved w/ comments

V1 Sep 30, 2024 12:05 PM Approved

V1May 29, 2024 11:00 AMApproved w/ comments

V1Sep 30, 2024 12:05 PMApproved w/ comments

V1Oct 23, 2024 3:32 PMApproved

V1May 29, 2024 11:00 AMApproved w/ comments

V1Sep 30, 2024 12:05 PMApproved w/ comments

V1Oct 23, 2024 3:32 PMApproved

V1May 29, 2024 11:00 AMApproved w/ comments

V1Sep 30, 2024 12:05 PMApproved w/ comments

V1May 29, 2024 11:00 AMApproved

V1Sep 30, 2024 12:05 PMApproved w/ comments

8632(B)-COMM-B2-RF-S-06-R0-BASEMENT-2 LEVEL DETAILS OF LIFT PIT, SUMP AND DRAIN CHANNEL V1 Aug 9, 2024 2:23 PMApproved

8632(B)-COMM-B2-RF-S-06-R0-BASEMENT-2 LEVEL DETAILS OF LIFT PIT, SUMP AND DRAIN CHANNEL

8632(B)-COMM-B2-RF-S-06-R1

8632(B)-COMM-B2-RF-S-06

8632(B)-COMM-B2-RF-S-07-R0

8632(B)-COMM-B2-RF-S-07-R0

8632(B)-COMM-B2-RF-S-07-R1

8632(B)-COMM-B2-RF-S-07

8632(B)-COMM-B2-S -02-R0-BASEMENT-2 LEVEL-29-04-2024

8632(B)-COMM-B2-S-01 & 02-R0-BASEMENT-2 LEVEL-29-04-2024

8632(B)-COMM-B2-S-01, 02 & 03

8632(B)-COMM-B2-S-01-R0-BASEMENT-2 LEVEL PLAN & DETAILS

8632(B)-COMM-B2-S-01-R0-BASEMENT-2 LEVEL-29-04-2024

8632(B)-COMM-B2-S-01

8632(B)-COMM-B2-S-02-R0-BASEMENT-2 LEVEL SECTIONAL DETAILS-SH 1

8632(B)-COMM-B2-S-02

8632(B)-COMM-B2-S-03-R0-BASEMENT-2 LEVEL SECTIONAL DETAILS-SH 2

8632(B)-COMM-B2-S-03

8632(B)-COMM-B2-SK-03-R0

8632(B)-COMM-B2-SK-03-R0

8632(B)-COMM-EXC-S-01-R0-EXCAVATION LEVEL PLAN

V1Aug 9, 2024 2:24 PMApproved

V1Sep 30, 2024 12:05 PMApproved w/ comments

V1Oct 23, 2024 3:32 PMApproved

V1 Sep 24, 2024 3:23 PM Approved w/ comments

V1 Sep 24, 2024 3:23 PM Approved w/ comments

V1Sep 30, 2024 12:05 PMApproved

V1Oct 23, 2024 3:32 PMApproved

V1 May 17, 2024 2:58 PMApproved

V1May 17, 2024 2:58 PMApproved

V1 Oct 23, 2024 3:43 PM Approved

V4Jun 14, 2024 6:03 PM

V1May 17, 2024 2:58 PMApproved

V1 Oct 23, 2024 3:43 PM Approved

V3May 30, 2024 12:55 PMApproved

V1Oct 23, 2024 3:43 PM Approved

V3May 30, 2024 12:55 PM Approved

V1Oct 23, 2024 3:43 PMApproved

V1Sep 30, 2024 12:05 PMApproved

V1Sep 30, 2024 12:05 PMApproved

V3May 22, 2024 6:15 PM

8632(B)-COMM-GR-RF-S-019 -R0

8632(B)-COMM-GR-RF-S-019 TO 022-R0

8632(B)-COMM-GR-RF-S-020 -R0

8632(B)-COMM-GR-RF-S-021 -R0

8632(B)-COMM-GR-RF-S-022 -R0

8632(B)-COMM-ST-1-CF-S-01-R0-STAIRCASE ST-01 DETAILS

8632(B)-COMM-ST-1-CF-S-01-R0-STAIRCASE ST-01 DETAILS

8632(B)-COMM-ST-2-CF-S-02-R0-STAIRCASE ST-02 DETAILS

8632(B)-COMM-ST-2-CF-S-02-R0-STAIRCASE ST-02 DETAILS

8632(B)-COMM-ST-3-CF-S-03-R0-STAIRCASE ST-03 DETAILS

8632(B)-COMM-ST-3-CF-S-03-R0-STAIRCASE ST-03 DETAILS

8632(B)-COMM-4THPOD-S-15

8632(B)-COMM-4THPOD-S-15

V1Jun 19, 2024 5:15 PMApproved

V1Jun 19, 2024 5:14 PMApproved

V1Jun 19, 2024 5:14 PMApproved

V1Jun 19, 2024 5:14 PMApproved

V1Jun 19, 2024 5:14 PMApproved

V1Jun 13, 2024 4:52 PM Approved w/ comments

V1Jun 13, 2024 4:52 PM Approved w/ comments

V1Jun 13, 2024 4:52 PM Approved w/ comments

V1Jun 13, 2024 4:52 PM Approved w/ comments

V1Jun 13, 2024 4:52 PMApproved w/ comments

V1Jun 13, 2024 4:52 PMApproved w/ comments

V1May 28, 2025 10:16 AMApproved

V1May 28, 2025 10:16 AMApproved

M-621-GFC-MEP-100-7TH-01

M-621-GFC-MEP-100-7TH-01

M-621-GFC-MEP-100-8TH-01

M-621-GFC-MEP-100-8TH-01

M-621-GFC-MEP-100-17TH-01

V1 Mar 6, 2025 3:04 PM Approved

V1 Mar 6, 2025 3:04 PMApproved

V1 Mar 6, 2025 3:07 PMApproved

V1 Mar 6, 2025 3:07 PMApproved

V1 Mar 17, 2025 5:13 PM In review

M-621-GFC-MEP-100-17TH-01 V1 Mar 17, 2025 5:13 PMIn review

M-621-GFC-HVAC-100-BF-01

M-621-GFC-HVAC-100-BF-01

M-621-GFC-HVAC-100-BF-02

V2 Jun 14, 2024 5:16 PMApproved

V2 Jun 14, 2024 5:16 PMApproved

V2 Jun 14, 2024 5:16 PMApproved

M-621-GFC-HVAC-100-BF-02 V2 Jun 14, 2024 5:16 PMApproved

M-621-GFC-HVAC-100-P1-01

V1 Dec 10, 2024 6:45 PMApproved

M-621-GFC-HVAC-100-P1-01 V1 Dec 10, 2024 6:45 PMApproved

M-621-GFC-HVAC-100-P2-01 V1 Dec 10, 2024 6:29 PMApproved

M-621-GFC-HVAC-100-P2-01 V1 Dec 10, 2024 6:29 PMApproved

M-621-GFC-HVAC-100-P3-01 V1 Oct 24, 2024 5:33 PM Approved

M-621-GFC-HVAC-100-P3-01 V1 Oct 24, 2024 5:33 PM Approved

M-621-GFC-HVAC-100-P4-01 V1 Oct 24, 2024 5:36 PM Approved

M-621-GFC-HVAC-100-P4-01 V1 Oct 24, 2024 5:36 PM Approved

M-621-GFC-HVAC-100-P5-01 V1 Dec 10, 2024 5:55 PMApproved

M-621-GFC-HVAC-100-P5-01 V1 Dec 10, 2024 5:54 PMApproved

M-621-GFC-HVAC-100-P6-01 V1 Dec 30, 2024 2:09 PMApproved

M-621-GFC-HVAC-100-P6-01 V1 Dec 30, 2024 2:09 PMApproved

M-621-GFC-HVAC-100-GF-01 V1 Jan 24, 2025 12:56 PMApproved

M-621-GFC-HVAC-100-GF-01 V1 Jan 24, 2025 12:56 PMApproved

M-621-GFC-HVAC-100-P3-01 V1 Dec 10, 2024 6:17 PMApproved

M-621-GFC-HVAC-100-P3-01 V1 Dec 10, 2024 6:17 PMApproved

M-621-GFC-HVAC-100-P4-01 V1 Dec 10, 2024 6:10 PMApproved

M-621-GFC-HVAC-100-P4-01 V1 Dec 10, 2024 6:10 PMApproved

M-621-GFC-ELE-LF-100-17TH-01.dwg V1 Mar 17, 2025 5:13 PM In review

V1 Mar 17, 2025 5:13 PM In review

M-621-GFC-ELE-LF-100-17TH-01.pdf

M-621-GFC-ELE-CT-100-BF-01.dwg V1 Jun 14, 2024 5:15 PM Approved

M-621-GFC-ELE-CT-100-BF-01.pdf

M-621-GFC-ELE-LF-100-BF-01.dwg

M-621-GFC-ELE-LF-100-BF-01.pdf

M-621-GFC-ELE-CT-100-BF-02.dwg

M-621-GFC-ELE-CT-100-BF-02.pdf

M-621-GFC-ELE-LF-100-BF-02.dwg

M-621-GFC-ELE-LF-100-BF-02.pdf

M-621-GFC-ELE-CT-100-GF-01.dwg

M-621-GFC-ELE-CT-100-GF-01.pdf

M-621-GFC-ELE-LF-100-GF-01.dwg

M-621-GFC-ELE-LF-100-GF-01.pdf

V1 Jun 14, 2024 5:15 PM Approved

V1 Jun 14, 2024 5:15 PM Approved

V1 Jun 14, 2024 5:15 PM Approved

V1 Jun 14, 2024 5:15 PM Approved

V1 Jun 14, 2024 5:15 PM Approved

V1 Jun 14, 2024 5:15 PM Approved

V1 Jun 14, 2024 5:15 PM Approved

V1 Jun 14, 2024 5:33 PM Approved

V1 Jun 14, 2024 5:33 PM Approved

V1 Jun 14, 2024 5:33 PM Approved

V1 Jun 14, 2024 5:33 PM Approved

M-621-GFC-ELE-LF-100-P1-01.dwg V1 Oct 24, 2024 5:24 PM Approved

M-621-GFC-ELE-LF-100-P1-01.pdf V1 Oct 24, 2024 5:24 PM Approved

M-621-GFC-ELE-LF-100-P02-01.dwg V1 Oct 24, 2024 5:06 PM Approved

V1 Oct 24, 2024 5:06 PM Approved

M-621-GFC-ELE-LF-100-P02-01.pdf

M-621-GFC-ELE-CT-100-P03-03.dwg V1 Oct 24, 2024 5:38 PM Approved

V1 Oct 24, 2024 5:38 PM Approved

M-621-GFC-ELE-CT-100-P03-03.pdf

M-621-GFC-ELE-LF-100-P03-01.dwg V1 Oct 24, 2024 5:38 PM Approved

V1 Oct 24, 2024 5:38 PM Approved

M-621-GFC-ELE-LF-100-P03-01.pdf

M-621-GFC-ELE-LF-100-P04-01.dwg V1 Oct 24, 2024 5:32 PM Approved

M-621-GFC-ELE-LF-100-P04-01.pdf

M-621-GFC-ELE-LF-100-P05-01.dwg

M-621-GFC-ELE-LF-100-P05-01.pdf

V1 Oct 24, 2024 5:32 PM Approved

V1 Oct 24, 2024 5:39 PM Approved

V1 Oct 24, 2024 5:39 PM Approved

M-621-GFC-ELE-CT-100-BF-01.dwg V1 Dec 27, 2024 12:12 PMApproved w/ comments

M-621-GFC-ELE-CT-100-BF-01.pdf

V1 Dec 27, 2024 12:12 PMApproved w/ comments

M-621-GFC-ELE-CT-100-BF-02.dwg V1 Jan 29, 2025 3:52 PM Approved w/ comments

M-621-GFC-ELE-CT-100-BF-02.pdf

V1 Jan 29, 2025 3:52 PM Approved w/ comments

M-621-GFC-ELE-CT-100-GF-01.dwg V1 Dec 30, 2024 6:39 PMApproved w/ comments

M-621-GFC-ELE-IBMS-100-BF-01.dwg V1 Dec 27, 2024 12:12 PMApproved w/ comments

M-621-GFC-ELE-IBMS-100-BF-01.pdf

V1 Dec 27, 2024 12:12 PMApproved w/ comments

M-621-GFC-ELE-LF-100-BF-01.dwg V1 Dec 27, 2024 12:12 PMApproved w/ comments

M-621-GFC-ELE-LF-100-BF-01.pdf

V1 Dec 27, 2024 12:12 PM Approved w/ comments

M-621-GFC-PHE-100-8TH-01

M-621-GFC-PHE-100-8TH-01

M-621-GFC-PHE-100-8TH-02

M-621-GFC-PHE-100-8TH-02

M-621-GFC-PHE-100-17TH-01

M-621-GFC-PHE-100-17TH-01

M-621-GFC-PHE-100-17TH-02

M-621-GFC-PHE-100-17TH-02

M-621-GFC-PHE-100-BF-02-01

M-621-GFC-PHE-100-BF-02-01

M-621-GFC-PHE-100-BF-02-02

M-621-GFC-PHE-100-BF-02-02

M-621-GFC-PHE-100-GF-01-01

M-621-GFC-PHE-100-GF-01-01

M-621-GFC-PHE-100-P1-01

M-621-GFC-PHE-100-P1-01

M-621-GFC-PHE-100-P1-02

M-621-GFC-PHE-100-P1-02

M-621-GFC-PHE-100-P2-01

M-621-GFC-PHE-100-P2-01

M-621-GFC-PHE-100-P2-02

M-621-GFC-PHE-100-P2-02

M-621-GFC-PHE-100-P3-01

M-621-GFC-PHE-100-P3-01

M-621-GFC-PHE-100-P3-02

M-621-GFC-PHE-100-P3-02

M-621-GFC-PHE-100-P4-01

M-621-GFC-PHE-100-P4-01

M-621-GFC-PHE-100-P4-02

M-621-GFC-PHE-100-P4-02

M-621-GFC-PHE-100-P5-01

M-621-GFC-PHE-100-P5-01

M-621-GFC-PHE-100-P5-02

M-621-GFC-PHE-100-P5-02

M-621-GFC-PHE-100-P6-01

M-621-GFC-PHE-100-P6-01

M-621-GFC-PHE-100-P6-02

M-621-GFC-PHE-100-P6-02

M-621-GFC-PHE-100-P3-01

M-621-GFC-PHE-100-P3-01

M-621-GFC-PHE-100-P3-02

M-621-GFC-PHE-100-P3-02

V1Mar 11, 2025 11:09 AMApproved

V1Mar 11, 2025 11:09 AMApproved

V1Mar 11, 2025 11:09 AMApproved

V1Mar 11, 2025 11:09 AMApproved

V1Mar 17, 2025 5:17 PMIn review

V1Mar 17, 2025 5:17 PMIn review

V1Mar 17, 2025 5:17 PMIn review

V1Mar 17, 2025 5:17 PMIn review

V1Jan 22, 2025 12:25 PM

V1Jan 22, 2025 12:25 PM

V1Jan 22, 2025 12:25 PM

V1Jan 22, 2025 12:25 PM

V1Jun 14, 2024 5:34 PMApproved

V1Jun 14, 2024 5:34 PMApproved

V3Dec 13, 2024 6:03 PM

V3Dec 13, 2024 6:03 PM

V3Dec 13, 2024 6:03 PM

V3Dec 13, 2024 6:03 PM

V3Dec 13, 2024 6:03 PM

V3Dec 13, 2024 6:03 PM

V3Dec 13, 2024 6:03 PM

V3Dec 13, 2024 6:03 PM

V2Dec 13, 2024 6:04 PM

V2Dec 13, 2024 6:04 PM

V2Dec 13, 2024 6:04 PM

V2Dec 13, 2024 6:04 PM

V3Dec 13, 2024 6:04 PM

V3Dec 13, 2024 6:04 PM

V3Dec 13, 2024 6:04 PM

V3Dec 13, 2024 6:04 PM

V3Dec 13, 2024 6:04 PM

V3Dec 13, 2024 6:04 PM

V3Dec 13, 2024 6:04 PM

V3Dec 13, 2024 6:04 PM

V1Dec 18, 2024 10:11 AMApproved

V1Dec 18, 2024 10:11 AMApproved

V1Dec 18, 2024 10:11 AMApproved

V1Dec 18, 2024 10:11 AMApproved

V1Dec 18, 2024 10:10 AMApproved

V1Dec 18, 2024 10:10 AMApproved

V1Dec 18, 2024 10:10 AMApproved

V1Dec 18, 2024 10:10 AMApproved

M-621-GFC-FFTG-100-17TH-01.dwg V1 Mar 17, 2025 5:14 PM In review

M-621-GFC-FFTG-100-17TH-01.pdf V1 Mar 17, 2025 5:14 PMIn review

M-621-GFC-FFTG-100-BF-01.dwg V2 Jun 14, 2024 5:13 PM Approved

M-621-GFC-FFTG-100-BF-01.pdf V2 Jun 14, 2024 5:13 PMApproved

M-621-GFC-FFTG-100-BF-02.dwg V2 Jun 14, 2024 5:13 PM Approved

M-621-GFC-FFTG-100-BF-02.pdf V2 Jun 14, 2024 5:13 PMApproved

M-621-GFC-FFTG-100-GF-01.dwg V1 Jun 14, 2024 5:36 PM Approved

M-621-GFC-FFTG-100-GF-01.pdf V1 Jun 14, 2024 5:36 PMApproved

M-621-GFC-FFTG-100-P1-01.dwg V3 Dec 16, 2024 3:22 PM

M-621-GFC-FFTG-100-P1-01.pdf V3 Dec 16, 2024 3:22 PM

M-621-GFC-FFTG-100-P2-01.dwg V3 Dec 16, 2024 5:46 PM

M-621-GFC-FFTG-100-P2-01.pdf V3 Dec 16, 2024 5:46 PM

M-621-GFC-FFTG-100-P3-01.dwg V4 Dec 17, 2024 10:39 AM

M-621-GFC-FFTG-100-P3-01.pdf V4 Dec 17, 2024 10:39 AM

M-621-GFC-FFTG-100-P4-01.dwg V3 Dec 17, 2024 10:57 AM

M-621-GFC-FFTG-100-P4-01.pdf V3 Dec 17, 2024 10:57 AM

M-621-GFC-FFTG-100-P5-01.dwg V3 Dec 17, 2024 11:59 AM

M-621-GFC-FFTG-100-P5-01.pdf V3 Dec 17, 2024 11:59 AM

M-621-GFC-FFTG-100-P6-01.dwg V1 Dec 18, 2024 10:12 AM Approved

M-621-GFC-FFTG-100-P6-01.pdf V1 Dec 18, 2024 10:12 AMApproved

M-621-GFC-FFTG-100-BF-02.dwg V1 Dec 20, 2024 5:14 PM Approved

M-621-GFC-FFTG-100-BF-02.pdf V1 Dec 20, 2024 5:14 PMApproved

M-621-GFC-FFTG-100-GF-01.dwg V1 Dec 18, 2024 10:13 AM Approved

M-621-GFC-FFTG-100-GF-01.pdf V1 Dec 18, 2024 10:13 AMApproved

Consultant
BIM Manager
Structure Consultant
Facade Consultant
Coordinated Building Section
Federated
AHU-4
AHU-4
AHU-2
21th Floor
Federated Model
Lift lobby
Refuge Area
22nd-25th (Typ) Floor

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
KRC-CGN2-BIM Booklet by dgtraindia - Issuu