白
SHIRO DWELLINGS ADDRESS
568-574 SYDNEY ROAD BRUNSWICK CLIENT DETAILS
JOSEPH ESTATE COMPANY
F4 BUILDING GROUP PROJECT STAGE
WORKING DRAWINGS GROUP MEMBERS
PC HK GM HG
PEDRO TORRES DA COSTA HARPREET KUAR GEORGE MARANTOS HUGH GRANT
Drawing No: DESCRIPTION LAST PAGE A001 COVER SHEET A002 GENERAL NOTES A101 SITE PLAN A201 BASEMENT PLAN A202 GROUND FLOOR PLAN A203 1ST FLOOR PLAN A204 2ND FLOOR PLAN A205 TERRACE PLAN A206 ROOF PLAN A301 REFLECTED CEILING PLAN A302 REFLECTED CEILING PLAN A303 REFLECTED CEILING PLAN A304 REFLECTED CEILING PLAN A305 REFLECTED CEILING PLAN A401 ELEVATIONS A402 ELEVATIONS A501 SECTIONS A502 SECTIONS A503 SECTIONS A504 SECTIONS A601 INTERIOR A602 INTERIOR A603 INTERIOR A604 INTERIOR A605 INTERIOR A701 DETAILS A702 DETAILS A703 DETAILS A704 DETAILS A705 DETAILS A706 DETAILS A707 DETAILS A708 DETAILS A709 DETAILS A710 DETAILS A711 DETAILS A801 WINDOW SCHEDULE A802 DOOR SCHEDULE
Modified by PC PC GM HK PC PC PC PC PC PC PC PC PC PC PC HG HG HG HG GM GM HK HK HK HK HK HK HK HK HG HG HG GM GM GM GM GM PC PC
Checked by PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC
SUMMARY BASEMENT GROUND LEVEL 1 LEVEL 2 TERRACE TOTAL
1 BED UNIT
2 BED UNIT
5 5
4 4
10
8
RETAIL 3
3
CAFE CARS RESIDENT 18 1
1
18
CARS RETAIL 2 2
BICYCLE
4
36
LAUNDRY
36
1 1
SITE COVERAGE BUILDING TOTAL SITE SITE COVERAGE
GSEducationalVersion
AREA M² 991.01 913.55
PERCENTAGE 100% 92.18%