



Architecture Undergraduate
Selected Projects 2021-2024
2020 - Present
2017 - 2020
EXPERIENCES
202 4
202 3
202 3 - Present
2022 - 202 3
01 - 10 - 2002 | Bandung, Indonesia
A senior year architecture student at Bandung Institute of Technology.
Bandung Institute of Technology Architecture Major
Madania International Highschool Science Major Graduate
I ntern Staf f
PT. Maratama Cipta Mandiri
Staff of Graphic Design
Gaung Bandung 2024
Staff of Supervisory Committee
Badan Perwakilan Anggota IMA-G 2023/2024
S taff of E ditorial D i v isio n
I k atan Mahasis w a Arsite k tur Gunadhar m a ITB ( IMA-G )
Head of P u b lication D i v isio n
Pe m ilu R aya K M ITB 2022 / 202 3
Mento r
Penjenjangan Mula Bina IMA-G 2022 / 202 3 2022
S taff of P u b lication D i v isio n
IMA-G J uly 2022 Graduation
2021
S taff of D ocu m entation S u b D i v isio n
A k u Masu k ITB ( AMI )
S k etch Up
A utoC AD
E nscape
M icrosoft O ffice
Canv a
F igm a
R hin o
R evi t
Ad o b e P hotoshop
B ahasa I n d onesi a
E ng l ish
Proficien t
Proficien t
Proficien t
Inter m ediat e
Inter m ediat e
Inter m ediat e
Begine r
Begine r
Beginer
N ati ve
Proficien t
akhiradelistia010@gmail.com
(+62) 813 8214 6863
@dellakhiraa
Project
Period
Tools
Supervisor
AR2290 Architectural Design Studio II
4th Semester, 2021
SketchUp, Enscape, Figma
Dr. Agus Suharjono Ekomadyo S.T., M.T.
‘Children’s House’ is a space intended to prevent child malnutrition by providing nutritional material, the development of hygiene and healthcare awareness raising programmes, the organisation of paediatric and social care appointments, housing for at-risk patients, and the training of community nurses, who will guide local families on best practice in relation to prevention and nutrition.
This task refers to an architecture competition by Kaira Looro. The Children's House aimed to be built in Senegal, Africa. The building only has one floor which consists of administration, recreation, medical examination rooms, storage for storing food and medicines and also toilets.
Initial shape
Initial Mass divided into two part
The mass is separated to form a space in the middle
Final shape
The Children's House strives to provide a secure environment for both moms and their children. Two buildings facing one other with a semi-outdoor area between that may be used as a gathering spot and for kids to play together provide a safe environment. In order to separate the children's house's outside and interior spaces and to give a safe impression, an earth brick wall was also constructed around the outside space.
Buildings must prioritize the usage of locally sourced materials and be as sustainable as feasible in order to meet the requirements of this assignment. As a result, wood was selected for construction and earth brick for the walls.
Project
Period
Tools
Supervisor
AR3290 Architectural Design Studio III
5th Semester, 2022
SketchUp, AutoCAD, Enscape, Figma
Dr. Eng. Bambang Setia Budi, S.T, M.T.
Citatah Stone Garden is located approximately 26 kilometers away and is used as both a research and tourist destination. The garden's karst surroundings provide proof that, 25 million years ago, the region was a shallow seabed. This karst, which is situated in Padalarang, Bandung, hopes to draw more visitors and karst education facilities. However, there isn't a visitor center where visitors can learn more about Citatah Karst.
The contoured area was chosen as a new learning medium for this semester. The Visitor Center typology was also chosen to train students to integrate buildings with their environment by paying attention to topography and certain natural features. The space program for this assignment needs to include outdoor and indoor galleries, cafes and restaurants, the Citatah karst counter, as well as public facilities related to the place.
The mass of buildings arranged in a semi-U-shape is used to respond to the surrounding valleys and hills. The first mass has the function of serving as an office and cafe, overlooking the hill on the south side of the site. The second mass is made in the form of an L-shape, with the restaurant section having a view of the Citatah karst and the lobby section having a view of the western hill of the site.
Initial shape
The contour on the north part of the site is cut, then the mass is pulled down
The mass on the east side of the site is added by pulling the surface
Final shape
EXTERIOR PERSPECTIVE
INTERIOR PERSPECTIVE
Project
Period
Tools
Supervisors
AR3290 Architectural Design Studio IV
6th Semester, 2023
SketchUp, AutoCAD, Enscape, Figma
Ir. Tri Yuwono M.T.
Dr. Samsirina S.T., M.T.
One of a section of Bandung City's downtown is known as Banda Street. The possibility to build a hotel that can accommodate the demands of guests and be affordable for all groups exists because this route is bordered by a variety of public spaces, including culinary area, workplaces, retail centers, and medical centers.
The low-cost hotel type was selected as the highrise building learning medium for this endeavor. The selected site is located on an elongated shape, and is on hook ground. This budget hotel consists of three basements, two podium floors, and six typical floors, for a total of 156 rooms.
The building's east and west orientation, which meant that the bedrooms would get a lot of sunlight, was one of the tasks' problems. In response, the facade's windows are outfitted with screens that will reduce the amount of excessive light that enters the space. To prevent too much light, the bed is positioned in the room back to back with the window.
BASEMENT 1 PLAN
BASEMENT 2 PLAN
Project Period Tools
Supervisor
Work By
AR3120 Construction and Building Materials
Studio II
7th Semester, 2024
Rhinoceros, SketchUp, Enscape, Figma
Dr. Ing. Andry Widyowijatnoko, S.T., M.T.
Della Akhiradelistia
Nicolas Ciu
Tafani Vidra Dwiputri
This assignment's primary goal is to give students an understanding of the technologies used in wide-span structure timber construction. The wood that is discussed in this assignment is engineered wood, or wood that has been combined with other materials (composite timber construction) or processed in a way that increases its strength.
Project
Period
Tools
Supervisor
Project as intern staff 7th Semester, 2024
SketchUp, AutoCAD, Enscape, Figma Agung Parikesit, S.T., MBA
This project is part of the construction project of the Regional Disaster Management Agency (BPBD) office complex in East Kalimantan, which is being carried out by PT. Maratama Cipta Mandiri along with several other companies. The project is located on a site with a total area of 123,803 square meters and is equipped with natural disaster management training facilities as well as other facilities and infrastructure.
GROUND FLOOR PLAN NOT TO SCALE
SECOND FLOOR PLAN NOT TO SCALE
THIRD FLOOR PLAN NOT TO SCALE
SECTION A-A NOT
SECTION D-D
PRINCIPAL SECTION
Project Period
AR2210 Shape Editing Studio 4th Semester, 2021
The course AR2210 covers the creation of mockups and the integration of spatial modifications with users. Students examine spatial compositions for multiple masses in this project.
MASSING DEVELOPMENT
The Shard is a massing with a function that aims to be a co-working space and library and consists of six building masses. The middle of the surrounding masses is an open space for a gathering point and pedestrian access to the buildings around it.
Project Gaung Bandung 2024
Tools Figma
color palette
Project Gaung Bandung 2023 Tools Figma & Photoshop
Project DI3005 Exhibition Design - Final Exam: Bandung Geological Museum
Redesign Project (Stone Display Area)
Tools Enscape & SketchUp
Project Final Project by Minerva Andrea W. Tools Enscape & SketchUp
Project Final Project by Ananda Khairunissa
Tools Enscape & SketchUp