LOT-11,-SEINA 1_THE DAWN AT SKY RIDGE




LAYOUT FIRST FLOOR A-502 FLOORING LAYOUT SECOND FLOOR A-503.1 MASTER BATH TILE DETAIL A-503.2 MASTER BATH TILE DETAIL A-504 BATH-1 TILE DETAIL A-505 ENSUITE BATH TILE DETAIL A-506 COMMON BATH TILE DETAIL
A-601 MASTER BATH - FIXTURES AND ACCESSORIES LAYOUT
A-601.1 FIXTURES AND ACCESSORIES LAYOUT VIEW
A-602 MASTER BATH WC & SHOWER - FIXTURES AND ACCESSORIES LAYOUT
A-603 BATH-1- - FIXTURES AND ACCESSORIES LAYOUT
A-604 ENSUITE BATH - - FIXTURES AND ACCESSORIES LAYOUT
A-605 COMMON BATH - - FIXTURES AND ACCESSORIES LAYOUT
A-701 FIRST FLOOR RCP
A-702 SECOND FLOOR RCP A-703 FIRST FLOOR SOFFIT PLAN
A-704 SECOND FLOOR SOFFIT PLAN
A-801 CABINETRY DETAIL -KITCHEN 3D VIEW
A-802 CABINETRY DETAIL-KITCHEN
A-803 CABINETRY DETAIL-ISLAND KITCHEN
A-804 CLOSET SHELF DETAIL- MASTER CLOSET
A-805 CLOSET SHELF DETAIL-ENSUITE BED ROOM, BEDROOM-1, BEDROOM-2&3
A-806 CABINETRY DETAIL - LAUNDRY
A-808 CABINETRY DETAIL - PANTRY
A-809 CABINETRY DETAIL-MASTER ,COMMON, ENSUITE BATH,BATH-1,BATH-2
A-901 STAIR SECTION DETAIL
A-902 HAND RAIL DETAIL
A-903 FIRST FLOOR BASE BOARD DETAIL
A-904 SECOND FLOOR BASE BOARD DETAIL
A-905 FIRST FLOOR GYPSUM WALL AND TILE BACKER DETAIL
A-906 SECOND FLOOR GYPSUM WALL DETAIL AND TILE BACKER DETAIL
A-1001 INTERIOR ELEVATION MASTER BEDROOM
A-1002 INTERIOR ELEVATION BED ROOM 1
A-1003 INTERIOR ELEVATION ENSUITE BED ROOM
A-1004 INTERIOR ELEVATION BEDROOM 2
A-1005 INTERIOR ELEVATION BEDROOM 3
A-1006 INTERIOR ELEVATION DINING ROOM
A-1007 INTERIOR ELEVATION STUDY ROOM
A-1008 INTERIOR ELEVATION FIRE PLACE DETAIL
A-1009 INTERIOR ELEVATION LIVING ROOM
A-1010 INTERIOR ELEVATION MEDIA ROOM
A-1011 FACADE DETAIL
A-1012 FACADE DETAIL
A-1013 TYPICAL WALL SECTION DETAIL
AA-107 STUD WALL CENTER LINE PLAN
E-101
E-102
SCHEMATIC ELECTRICAL LAYOUT FIRST FLOOR
SCHEMATIC ELECTRICAL LAYOUT SECOND FLOOR
P-101 PLUMBING TYPICAL DETAIL
P-102
P-103
P-104
P-105
P-106
SCHEMATIC PLUMBING ROUGH IN/STAKE OUT
SCHEMATIC PLUMBING DRAINAGE - FIRST FLOOR
SCHEMATIC PLUMBING DRAINAGE-SECOND FLOOR
SCHEMATIC WATER & NATURAL GAS SUPPLY LAYOUT-FIRST FLOOR
SCHEMATIC WATER & NATURAL GAS SUPPLY LAYOUT-SECOND FLOOR
Door-Curtain-Wall-Single-Glass






























































































































2 MASTER BATH 3D VIEW 2
6.
1.
AND ASSOCIATED WORK, IN ACCORDANCE WITH THE BUILDING CODE, ALL AUTHORITIES HAVING JURISDICTION, AND THIS SPECIFICATION.
2. THE WORK SHALL INCLUDE ALL LABOR, MATERIALS, EQUIPMENT, HOISTING AND RIGGING, SCAFFOLDING, LOADING AND UNLOADING, CLEAN-UP OF DEBRIS AND OTHER SERVICES,TO PROVIDE THE OWNER WITH FULLY OPERATIONAL SYSTEMS.
3. ALL WORK SHALL BE PROPERLY COORDINATED WITH THE WORK OF OTHER TRADES TO AVOID CONFLICTS. REFER TO THE ARCHITECTURAL AND STRUCTURAL DRAWINGS ONLY FOR INFORMATION REGARDING CEILING ELEVATIONS, SPACE CLEARANCES, WALL AND PARTITION LOCATIONS ETC. USED TO PREPARE COORDINATED DRAWINGS.
4. BIDDERS, PRIOR TO SUBMITTING PROPOSALS, SHALL VISIT THE SITE AND FULLY EXAMINE THE AREAS INVOLVED WITH THIS WORK, TO FAMILIARIZE THEMSELVES WITH THE EXACT CONDITIONS AND DIFFICULTIES THAT MAY ATTEND THE EXECUTION OF THIS WORK. SUBMISSION OF A PROPOSAL WILL BE CONSTRUED AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN
6.
8.
HAS BEEN ESTABLISHED. SUBMIT PLUMBING FIXTURE CUTS WITH TRIM, INSULATION, PIPE MATERIALS, FITTINGS, VALVES AND CERTIFIED EQUIPMENT CUTS WITH CONSTRUCTION WIRING DIAGRAMS. SUBMIT PDFS OF OPERATING AND SERVICE MANUALS WHICH SHALL INCLUDE COPIES OF ALL SHOP DRAWINGS, FIXTURE AND EQUIPMENT CUTS, SERVICE INSTRUCTIONS.
9. CONVECTION OVENS AND STEAM EQUIPMENT SHALL HAVE THE APPROVED DUAL CHECK VALVE ASSEMBLY INSTALLED ON THE WATER SUPPLY LINE.
10. AN APPROVED REDUCED PRESSURE ZONE (RPZ) BACKFLOW PREVENTER DEVICE SHALL BE INSTALLED IN THE POTABLE WATER SUPPLY TO EACH LOCATION WHERE SANITIZING CHEMICALS OR DETERGENTS WILL BE ASPIRATED OR PUSHED BY WATER PRESSURE INTO CLEANSING/SANITIZING OPERATION.
11. DEAD ENDS SHALL BE AVOIDED IN DRAINAGE SYSTEM, EXCEPT WHERE NECESSARY TO EXTEND THE SYSTEM TO INSTALL A CLEANOUT IN AN ACCESSIBLE LOCATION. THE DEAD ENDS INTENDED FOR FUTURE CONNECTION OR CREATED BY REMOVAL OR ENDS INTENDED FOR FUTURE CONNECTION OR CREATED BY REMOVAL OR ABANDONMENT OF PIPE; WHICH IS MORE THAN TWO (2'-0") FEET ABOVE A FLOOR OR MORE THAN TEN (10) FEET HORIZONTALLY FROM THE NEAREST VENTED CONNECTION MUST HAVE A VENTED CONNECTION TO THE OUTSIDE ATMOSPHERE.
12. WATER DISTRIBUTION PIPE THAT HAS BEEN TERMINATED OR IS AN UNUSED SEGMENT SHALL HAVE NO DEAD ENDS. NO SEGMENT OF PIPE WITH A DEVELOPED LENGTH OF MORE THAN TWO (2'-0") FEET SHALL BE PERMITTED.
13. IN LIEU OF AIR CHAMBERS PROVIDE WATER HAMMER ARRESTORS PER OSHA REQUIREMENTS. 14. PLUMBING CONTRACTOR SHALL INSTALL VENT THRU ROOF WHILE MAINTAINING
CLEARANCE FROM MECHANICAL EQUIPMENT FRESH
INTAKES. FIELD VERIFY AND COORDINATE WITH MECHANICAL CONTRACTOR. KITCHEN ISLAND VENTING NEED TO BE PROVIDED BY CONTRACTOR LEGENDS
WASH BASIN
WATER CLOSET
SHOWER
AND INSTALL THE PLUMBING SYSTEMS COMPLETE WITH ALL EQUIPMENT, PIPING, VALVES, INSULATION, CONTROLS HANGERS, TRIM, ACCESSORIES AND ASSOCIATED WORK, IN ACCORDANCE WITH THE BUILDING CODE, ALL AUTHORITIES HAVING JURISDICTION, AND THIS SPECIFICATION.
2. THE WORK SHALL INCLUDE ALL LABOR, MATERIALS, EQUIPMENT, HOISTING AND RIGGING, SCAFFOLDING, LOADING AND UNLOADING, CLEAN-UP OF DEBRIS AND OTHER SERVICES,TO PROVIDE THE OWNER WITH FULLY OPERATIONAL SYSTEMS.
3. ALL WORK SHALL BE PROPERLY COORDINATED WITH THE WORK OF OTHER TRADES TO AVOID CONFLICTS. REFER TO THE ARCHITECTURAL AND STRUCTURAL DRAWINGS ONLY FOR INFORMATION REGARDING CEILING ELEVATIONS, SPACE CLEARANCES, WALL AND PARTITION LOCATIONS ETC. USED TO PREPARE COORDINATED DRAWINGS.
4. BIDDERS, PRIOR TO SUBMITTING PROPOSALS, SHALL VISIT THE SITE AND FULLY EXAMINE THE AREAS INVOLVED WITH THIS WORK, TO FAMILIARIZE THEMSELVES WITH THE EXACT CONDITIONS AND DIFFICULTIES THAT MAY ATTEND THE EXECUTION OF THIS WORK. SUBMISSION OF A PROPOSAL WILL BE CONSTRUED AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE, AND LATER CLAIMS WILL NOT BE RECOGNIZED, FOR EXTRA LABOR, MATERIALS AND EQUIPMENT, REQUIRED BECAUSE OF ADDITIONAL DIFFICULTIES ENCOUNTERED, WHICH COULD HAVE BEEN FORESEEN HAD SUCH AN EXAMINATION BEEN MADE.
5. ALL MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE OF THIS WORK. ENGAGE THE SERVICES OF VARIOUS MANUFACTURER'S SUPPLYING THE EQUIPMENT FOR THE PROPER START-UP
6.
7.
SHALL INCLUDE COPIES OF ALL SHOP DRAWINGS, FIXTURE AND EQUIPMENT CUTS, SERVICE INSTRUCTIONS.
9. CONVECTION OVENS AND STEAM EQUIPMENT SHALL HAVE THE APPROVED DUAL CHECK VALVE ASSEMBLY INSTALLED ON THE WATER SUPPLY LINE.
10. AN APPROVED REDUCED PRESSURE ZONE (RPZ) BACKFLOW PREVENTER DEVICE SHALL BE INSTALLED IN THE POTABLE WATER SUPPLY TO EACH LOCATION WHERE SANITIZING CHEMICALS OR DETERGENTS WILL BE ASPIRATED OR PUSHED BY WATER PRESSURE INTO CLEANSING/SANITIZING OPERATION.
11. DEAD ENDS SHALL BE AVOIDED IN DRAINAGE SYSTEM, EXCEPT WHERE NECESSARY TO EXTEND THE SYSTEM TO INSTALL A CLEANOUT IN AN ACCESSIBLE LOCATION. THE DEAD ENDS INTENDED FOR FUTURE CONNECTION OR CREATED BY REMOVAL OR ENDS INTENDED FOR FUTURE CONNECTION OR CREATED BY REMOVAL OR ABANDONMENT OF PIPE; WHICH IS MORE THAN TWO (2'-0") FEET ABOVE A FLOOR OR MORE THAN TEN (10) FEET HORIZONTALLY FROM THE NEAREST VENTED CONNECTION MUST HAVE A VENTED CONNECTION TO THE OUTSIDE ATMOSPHERE.
12. WATER DISTRIBUTION PIPE THAT HAS BEEN TERMINATED OR IS AN UNUSED SEGMENT SHALL HAVE NO DEAD ENDS. NO SEGMENT OF PIPE WITH A DEVELOPED LENGTH OF MORE THAN TWO (2'-0") FEET SHALL BE PERMITTED.
13. IN LIEU OF AIR CHAMBERS PROVIDE WATER HAMMER ARRESTORS PER OSHA REQUIREMENTS.
14. PLUMBING CONTRACTOR SHALL INSTALL VENT THRU ROOF