ii
Commercial Projects
Historic and MultiFamily Projects
Research-Based Projects
Table of Contents
Daniel Sweeney Architecture Portfolio Sample 1.1: 10-11 Arlington................................................................................................................................................................Pages 1-6 Sample 1.2: Better Bagels..................................................................................................................................................................Pages 7-10 Sample 2.1: Manhattan House.......................................................................................................................................................Pages 11-12 Sample 2.2: The Grid District..........................................................................................................................................................Pages 13-14 Sample 1.2: Stalled..............................................................................................................................................................................Pages 15-22 Sample 1.3: Vernal Squared.............................................................................................................................................................Pages 23-26
iii
DOOR
1' - 7 3/4"
SOFT-CLOSE, PAINT GRADE, FACE FRAME DRAWER
2' - 4 3/4"
1 1/4"
1 1/4" 2' - 8 3/4"
2' - 10"
6" 6"
1' - 8"
2' - 3" 6"
6"
DRAWER PULL
4"
2' - 4 3/4" 2' - 4 3/4"
1' - 6"
DW
SINK
1' - 6"
1' - 6" FRIDGE
4"
6"
1/4" PLYWOOD BACK PANEL
1' - 6"
WD BLOCKING AT WALL AS REQUIRED
1' - 6"
1/2" PLYWOOD
DW
4"
2' - 10"
4"
1' - 6"
3/4" PLYWOOD STONE COUNTER W/ 4" WOOD WINDOW BACKSPLASH SILL
2X4 BASE
3"
6' - 0"
1' - 8"
3" BL
BLOCKING @ WALL BEHIND MILLWORK
COFFEE STATION SECTION HOSPITALITY - 3RD FLOOR - SECTION 1
HOSPIT
HOSPITALITY - 3RD FLOOR - ELEVATION A 3B 3A1" = 1'-0"
HOSP 3C = 1'-0" 4A 1"3/4" =1
3/4" = 1'-0"
1B EQ A804
EQ
SIM EQ
3' - 11" 1' - 6"
TEMP. GLAZING, TYP.
1' - 6"
PUMBING TO SIDE WALL
1' - 6"
3A
5' - 8"
1' - 6"
ADJ. SHELVES CUPS AND DISHES
2' - 0"
2' - 0"
A804
1' - 6"
1' - 6"
PLUMBING T TEMP. GLAZING, TYP.
A804 COFFEE MACHINE
COFFEE STATION PLAN OUTLET BEYOND (PROVIDE SPACER 3/4" = 1'-0" FOR CABINET FACE)
3
3B - PLAN HOSPITALTY - 3RD3CFLOOR A804
A804
1' - 6"
HOSPITALITY - 2ND FLOOR - PLAN 3/4" = 1'-0"
FALSE FRONT
2B
2 1/2" TYP.
2A
08 | 2019 to 09 | 2021 PROVIDE FILLER AT A804 Boston, MA EACH END Embarc Studio CA 1
2' - 10"
Project Notes
Seeking a single building to function as the headquarters for multiple investment KNOB enterprises, the client bought two buidlings prominently sited SOFT-CLOSE, PAINT GRADE, FACE FRAME DOOR on Boston’s Public Garden, tasking the design team to break through the party wall 1/4" PLYWOOD BACK PANEL 1' - 6" 2' - 4" 1' - 6" and create a cohesive, visually WD BLOCKING AT WALL AS REQUIRED impactful space successfully DW SINK FRIDGE supporting a diverse array 1/2" PLYWOOD 5' - 7" of business units. Taking 2X4 BASE BLOCKING @site WALLhistory BEHIND and MILLWORK cue from the location this unique typology of space combines theSECTION fine HOSPITALITY 2ND FLOOR HOSPITALITY - 2ND FLOOR - ELEVATION A detailing found in many Back 1" = 1'-0" 3/4" = 1'-0" Bay townhomes with the needs of a commerical space.
DISHES
3/4" FINISH PANEL
6"
SOFT-CLOSE, PAINT GRADE, FACE FRAME DRAWER; TYP.
OUTLET BEYOND (PROVIDE SPACER STONE COUNTER W/ FOR CABINET 4" BACK FACE) SPLASH
2' - 10"
FALSE FRONT
Hired to complete the exterior/ interior architecture and FF&E, my experience working in all aforementioned capacities at the firm placed me in a prime position to support CA efforts. As the COVID-19 Pandemic hit during construction, extra tight coordination was requried amongst parties. My duties involved submittal review for all custom millwork and metal/ glass, inlcuding the railing for a grand feature SUPPLIES staircase. Additionally , I coordinated Bulletin issuances drive by ADJ. SHELVES 1' - 6" 2' - 4"changes. client requested CUPS AND
COFFEE MACHINE
6"
WD BLOCKING AT WALL AS NEEDED STONE COUNTER
6"
4"
UTENSILS
3B A804
1 1/4"
1/4" PLYWOOD BACK PANEL
ADVIL/SNACK
3C A804
6"
10-11 Arlington
OUTLET BEYOND (PROVIDE SPACER FOR CABINET FACE)
1 1/4"
COFFEE MACHINE
4"
COFFEE MACHINE; SEE SPEC
COFFEE MACHINE
OUTLET BEYOND (PROVIDE SPACER FOR CABINET
4
HOSP
3/4" = 1
3"
SECTION
2B
HOSPITALITY 2ND FLOOR SECTION
3B
1" = 1'-0"
1' - 8"
HOSPITALITY - 3RD FLOOR - SECTION 1 1" = 1'-0" SIM
1B A804
2B A804
3' - 11" 5' - 8"
ADJ. SHELVES CUPS AND DISHES
4' - 5"
TEMP. GLAZING, TYP.
UTENSILS
3B A804
COFFEE MACHINE
1' - 6"
3C A804
OUTLET BEYOND (PROVIDE SPACER FOR CABINET FACE)
4"
ADVIL/SNACK
OUTLET BEYOND (PROVIDE SPACER FOR CABINET FACE)
1 1/4"
6"
COFFEE MACHINE
1 1/4"
TEMP. GLAZING, TYP.
4"
5' - 2"
2 1/2" TYP.
SUPPLIES
TEMP. GLAZING, TYP.
ADJ. SHELVES CUPS AND DISHES
6"
4"
4"
6"
6"
2' - 10"
6"
STONE COUNTER W/ 4" BACKSPLASH
2' - 8 3/4"
FALSE FRONT
1' - 8"
2' - 3"
2' - 4 3/4"
2' - 10"
1" 2' - 5"
2' - 10"
6"
STONE COUNTER FALSE FRONT
1' - 6"
2' - 4"
1' - 6"
1' - 6"
1' - 6"
DW
SINK
FRIDGE
DW
SINK
1' - 6"
1' - 6" FRIDGE
5' - 7" 6' - 0"
BLOCKING @ WALL BEHIND MILLWORK
BLOCKING @ WALL BEHIND MILLWORK
2A
HOSPITALITY - 2ND FLOOR - ELEVATION A 3/4" = 1'-0"
COFFEE STATION
3A
HOSPITALITY - 3RD FLOOR - ELEVATION A
3/4" = 1'-0" COFFEE STATION ELEVATION EQ
2 EQ
12' - 9"
1
6 A322
STAIR RAILING - ELEVATION 1/2" = 1'-0"
1.9
JENN'S OFFICE
2
211
2ND FLOOR RAISED MEZZANINE T.O. SUBFLOOR 14' - 0"
4 1/4"
2 1/4"
ELEVATION OF INTERIOR STOREFRONT BEYOND SCHEDULED WALL BASE SCHEDULED FINISH FLOOR
M021
SEE DETAIL 6/A326 FOR TYPICAL 1 HR BEAM ENCLOSURE INFORMATION
CEILING ASSEMBLY
1HR RATED FLOOR
2ND FLOOR, T.O. SUBFLOOR 12' - 9"
STEEL BEAM, SEE STRUCTURAL
LEXINGTON #6014 HANDRAIL BY COOPER STAIRWORKS
5
CROSS SECTI 1" = 1'-0"
CURVED BRACKET
APPLIED TRIM
SCHEDULED CEILING, SEE RCP
4 HARDWOOD CAP BY STAIR MILLWORKER
M101
4" D:\Revit Local\17038_10-11 Arlington St_CA_R-2017_dsweeney@embarcstudio.com.rvt
GRAND STAIRCASE
LINE OF C OPENING BEY
1-1/4" THICK LIMESTONE TREAD ON METAL PAN ASSEMBLY
STRINGER EDGE OVER FACE OF
CLIP ANGLE BY STAIR FABRICATOR
STEEL STRINGER WITH 1HR RATED INTUMESCENT FIREPROOFING, SEE STRUCTURAL
1/27/2021 10:27:55 AM
3
4
CAP BLOCKING AND FASICA BLOCKING BY SPECIALITY FRAMER
4 3/4"
SECTION DETAIL AT STAIR 1, STOREFRONT SECTION 4 DETAIL AT RATED PARTITION 1 1/2" = 1'-0"
9
CROSS SECTI 1" = 1'-0"
ARCHITEC
60 K STREET, 3RD FLOOR BOSTON, MA 02127 O: 617.766.8330 www.embarcstudio.co OWNER
10-11 ARLINGTON, LLC 79 NEWBURY STREET BOSTON, MA 02116
CONSULTANTS 10 A601
CIVIL
COLUMBIA DESIGN GROUP 2" TYP. OFF STAIR
STRUCTURAL
HAYES AND O'NEILL
2" F OF P. TY AIR ST
2"
7 1/2"
2"
2' - 10 1/2"
51 MELCHER STREET, FLOOR 1 BOSTON, MA 02210 617.938.3349
7"
MEP/FP
RDK ENGINEERS 200 BRICKSTONE SQUARE ANDOVER, MA 01810 978.296.6200
GEOTECHNICAL
MCPHAIL ASSOCIATES 2269 MASSACHUSETTS AVENUE CAMBRIDGE, MA 02140 617.868.1420
2 TEMP. GLAZING, TYP.
SURVEY
TRIM PROFILE: A&M 7090, TYP.
HANDRAIL PROFILE: #6014 COOPER STAIRWORKS WITH CUSTOM CURVED BRACKET, ATTACHED TO POSTS ALIGNED WITH INNER RAIL TYP.
7' - 0"
EQ
1 1/2"
2 F OF IL P. TY RA 3" AND H
2
LW-3
F OF R P. TY GE RIN ST
3" TYP. OFF HANDRAIL
7' - 6" V.I.F.
MOUNTING HEIGHT
2' - 10"
F OF IL P. TY RA 4" AND H
2"
FIRE TREATED WOOD BLOCKING @ TRIM, TYP.
HARDWOOD HANDRAIL CUSTOM CURVED BRACKET, ATTACHED TO CUSTOM METAL POSTS ALIGNED WITH INNER RAIL TYP. (SECURE TO STRINGER)
HANDRAIL
4" TYP. OFF HANDRAIL
1' - 8 1/4"
2" TYP. OFF STRINGER
2
SPANCRAFT ANTIQUE MIRROR PANEL, 67 MONTERREY, TYP.; MR-6
1 1/2"
10 A601 CUSTOM CURVED RAIL BRACKET, ALIGN WITH INNER RAIL POSTS, TYP.
2
BOSTON, MA 02116
2"
3" TYP. OFF HANDRAIL
EQ
7 1/2"
10-11 ARLINGTON ST
2"
7' - 6" V.I.F.
2' - 10 1/2"
MOUNTING HEIGHT
2
CONSTRUCTION AMENDMENT 1
152 HAMPDEN STREET BOSTON, MA 02119 617.357.9740
SPANCRAFT ANTIQUE MIRROR PANEL, 67 MONTERREY, TYP; MR-6
2" TYP. OFF STAIR 7"
FELDMAN LAND SURVEYORS
LW-3
PLASTER FINISH BELOW STAIRS (HOLD TIGHT TO STRINGER), TYP.
REVISION SKIRT BOARD TRIM OVER STRINGER FRAMING (REFER TO DETAILS ON A321), TYP.
MARK
ISSUE
DATE
1 2
BULLETIN #34 BULLETIN #36
12/03/20 01/27/21
10 A601
1' - 8 1/4"
4" TYP. OFF HANDRAIL
2" TYP. OFF HANDRAIL
2
ILING SS W/ ILING N
DRAWING
D RETURN SILL, REFER ON
REFER TO NOSING DETAIL 8/A321
ISSUE
CONSTRUCTION AMENDMENT 1
DATE
MARCH 4, 2019
PROJECT
17038
SCALE
As indicated
DRAWING
LW-3
P. GLAZING . CHANNELS BOTTOM
OD G
14 UPHAM AVENUE DORCHESTER, MA 02125 617.506.1474
STAIR 1 SECTION - EW - PANELING DETAILS
ELEVATION1 DETAIL AT GRAND STAIR TRIM 1" = 1'-0"
INTERIOR ELEVATIONS STAIR 1 (ST-1) DRAWING DETAILS
DETAIL AT HANDRAIL
A701I
copyright: EMBARC STUDIO,
4
A&M #5050
A&M #5050
A&M #5050
A&M #7090
A&M #7090
A&M #7090
A&M #5050
A&M #7090
2"
A&M #7090
A&M #4101
2 1/2"
2" TO TOP OF CHAIR RAIL
2' - 8 1/2"
2 1/2" 9 3/8"
2 1/2" 9 3/8"
A&M #7090
9 3/8"
2 1/2"
A&M #7090
BB-1
BB-1
BB-1
BB-1
BB-1
FACE OF FINISHED FLOOR
FACE OF FINISHED FLOOR
FACE OF FINISHED FLOOR
FACE OF FINISHED FLOOR
FACE OF FINISHED FLOOR
CONFERENCE ROOM DETAILING
CONF 111 - APPLIED TRIM SECTION 1 3" = 1'-0"
9 3/8"
2 1/2"
1
A&M #7090
A&M #7090
1/2"
A&M #7090
9 3/8"
TRIM SECTION 1
A&M #4101
2 1/2"
2 1/2" 2' - 8 1/2"
TO TOP OF CHAIR RAIL
2"
A&M #7090
A&M #7090
5
A&M #7090
2 1/2"
2 1/2"
2"
FACE OF FINISHED CLG
2 1/2"
5 3/8"
5 3/8"
A&M #7090
FACE OF FINISHED CLG
5 3/8"
FACE OF FINISHED CLG
1/2"
FACE OF FINISHED CLG
5 3/8"
FACE OF FINISHED CLG
2
TRIM SECTION 2
CONF 111 - APPLIED CONF TRIM 111 SECTION - APPLIED 2 TRIM SECTION 1 3" = 1'-0"
1
3" = 1'-0"
8
STAIR 1 LOBBY - APPLIED CONF 111 TRIM - APPLIED SECTION TRIM 1 SECTION 2 3" = 1'-0"
2
3" = 1'-0"
H
FACE OF FINISHED CLG
2 7/8"
4 3/4"
3 1/8"
1' - 4"
ARCHI
6 1/4"
A&M #5709
60 K STR BOSTON O: 617.7 www.emb
BLOCKING AS REQUIRED
H
3/4"
FACE OF FINISHED CLG
1 5/8" MTL STUD, REFER TO STRUCTURAL
2 1/2" A&M #5709
1' - 4"
6 1/4"
UD, TYP.
11"
11"
7"
TYPE 'C' TYP.
BLOCKING AS REQUIRED
3/4"
A&M #5050
5/8" GWB TYPE 'C' TYP.
5/8" GWB TYPE 'C' (CEILING) TYP. BLOCKING AS REQUIRED
1 5/8" MTL STUD, REFER TO STRUCTURAL
5/8" GWB TYPE 'C'
1 3/4"
TYPE 'C'
A&M #5050
5/8" GWB TYPE 'C' (CEILING) TYP.
CONF 111 - SOFFIT DETAIL
5/8" GWB TYPE 'C' TYP.
A&M #5050
1 5/8" MTL STUD, REFER TO STRUCTURAL
5/8" GWB TYPE 'C' TYP.
5/8" GWB TYPE 'X' (CEILING) TYP.
3 5/8" MTL STUD
COLUM
14 UPHAM DORCHES 617.506.1
3 5/8" MTL STUD
STRUCTU
HAYES A
2" RIGID INSULATION
51 MELCH BOSTON, 617.938.3
INSIDE FACE OF EXISTING EXTERIOR WALL
2" RIGID INSULATION
MEP/FP
RDK EN
5/8" GWB TYPE 'X' (CEILING) TYP.
HEADER
HEADER
A&M #5050
INSIDE FACE OF EXISTING EXTERIOR WALL
200 BRICK ANDOVER 978.296.6
GEOTECH
CONF 111 - WINDOW SOFFIT
2D 3" =ROOM CONFERENCE CROWN DETAIL 1 1'-0" CONF 111 - SOFFIT DETAIL 2D
CONSU CIVIL
5/8" GWB TYPE 'C' TYP.
5/8" GWB TYPE 'X' (CEILING) TYP.
5/8" GWB TYPE 'C'
2 7/8"
E 'C'
5 1/2"
2 7/8" 1 3/4"
RK; SEE HVAC
3/4"
EL STUD, 'C' TYP.
DENTILS WITH EQUAL SPACING
79 NEWBU BOSTON,
A&M #5050
1 5/8" MTL STUD, REFER TO STRUCTURAL
2 1/2"
OOD EE HVAC
OWNER
10-11 A
5/8" GWB TYPE 'X' (CEILING) TYP.
DENTILS WITH EQUAL SPACING
BLOCKING AS REQUIRED
3/4"
7"
D
5 1/2"
4 3/4"
3 1/8"
2E
3" = 1'-0"
MCPHA
A&M #5050 2E 3" = 1'-0" CONFERENCE ROOM CROWN DETAIL 2 CONF 111 - WINDOW SOFFIT
ARC
2269 MAS CAMBRIDG 617.868.1
3" = 1'-0" SURVEY
FELDMA
60 K BOS O: 6 www
SOFFIT
1' - 4 3/8"
152 HAMP BOSTON, 617.357.9
OW
FACE OF FINISHED CLG
APPLIED MOLDINGS, SEE DETAILS
A&M #5050
1 1/4"
1/4" PLYWOOD BACKING PANEL
FIRE BOX INSERT
1' - 0 3/8" TYP.
1' - 0 3/8" TYP.
14 UP DORC 617.5
STRU
HAY
MW-19; RECESSED 3/4" SHELVING PTD WOOD BACKED SHELVING WITH 1-1/2" NOSING; TYP. W/INTEGRATED LIGHTING AT EACH SHELF
51 M BOST 617.9
REVISION MEP MARK
1 RDK
200 B ANDO 978.2
1/4" PTD PLYWOOD BACK
FP-2; FIREPLACE A&MMANTLE #7090
1/2" PTD PLYWOOD BASE
STONE BACKSPLASH, SEE ELEVATION FOR PROFILE
3/4" TYP.
COL
WS-# WALL SCONCE | LED SEE STRIP LIGHT, TYP. AT EACH SHELF DECORATIVE LIGHTING SCHED.
6' - 2 1/8"
6' - 2 1/8"
6 SHELVES SPACED EVENLY 1' - 0 3/8" TYP.
W-18WATER TAP RVICE OUNTER/BUFFET
A&M #7090
1' - 0"
1 1/4" COUNTER
WOOD SHELF
CIVIL
1/2" PTD PLYWOOD TOP
6 SHELVES SPACED EVENLY
1/4" PLYWOOD BACKING PANEL
CON 1
WD BLOCKING AT WALL AS REQ'D
ALIGN
8' - 1 3/8" F.O.
9' - 10 1/2" A.F.F.
WOOD SHELF
79 N BOST
A&M #7090; ALIGN WITH PANELING 1 1/4" IN ROOM
ART WALL PROVIDE BLOCKING
NTIQUE RROR
1' - 5"
10-1
1' - 4 1/8"
1' - 4 1/8"
T STALLATION
GEO
3/4" TYP.
1' - 0 3/8" TYP.
BACK CUSHION, BY OTHERS
STONE BACKSPLASH, SEE ELEVATION FOR PROFILE
DRAWER PULL SOFT-CLOSE, PAINT-GRADE DRAWER W/ UNDERMOUNT GLIDE
OGEE EDGE STONE COUNTER
CUSHION, BY OTHERS (2) 1/2" PTD PLYWOOD W/ SOLID EDGE BAND
3' - 1" A.F.F.
7"
TYP.
2" 2" CUSHION
DRAWER
1' - 8" TYP.
1"
1/2" = 1'-0"
8"
CONFERENCE 111 - ELEVATION C 2' - 8 3/4"
1C
A&M #7090
1' - 0"
CONFERENCE ROOM FIREPLACE WALL ELEVATION
1/4" PLYWOOD BACKING PANEL
1 1/4" COUNTER
WATER TAP
8"
PAINT-GRADE SOFT CLOSE DOOR
DRAWER
OGEE EDGE STONE COUNTER COUNTER WITH 4" BACKSPLASH
MC
6
2269 CAM 617.8
DRAWIN
SURV
FELD
ISSUE
DATE
152 H BOST
PROJECT SCALE
Better Bagels
A
60 BO O ww
O
BE
CO
ME
ZA
14 BO 61
KI
HA
22 CH 61
6' - 0"
1 2
2460
RESTROOM
2460
AIR OUT
AIR IN
AIR OUT
2448 AIR IN
RESTROOM 2472
Walk-In Cooler 8'-6" x 12'-6"
20.1
3
FLOUR-SUGAR BULK STORAGE BELOW WIRE STORAGE SHELVING
21
GRAB + GO
23
20
2448
5' - 0"
22 PAN RACK
PAN RACK
PAN RACK
MOBILE ICE CART
3
water filter
42
COFFEE/ ICE
ELECTRIC CONVECTION OVEN
41 COFFEE
SNEEZE GUARD
toaster
ICE MAKER 30" x 66" WORK TABLE
4
4.1
7
23
8
9
12
43 AIR-POTS
45 48" U.C. REFRIGERATOR
11
WORK TABLE
14 6
Trash
13
48" WORK TOP REFRIGERATOR
72" REFRIGERATED SANDWICH UNIT
24
ORDER
10 egg cooker
PASS-THROUGH AT COUNTER
FLOUR-SUGAR BULK STORAGE BELOW WIRE STORAGE SHELVING
2460
2472
G
44
SLICER
40 25
15
17
grease trap below(by
16 16.1 16.2
18
DROP-IN SINK
RE
others)
HAND SINK (by owner)
M
22
G
PAN RACK
80-gal. KETTLE (by owner)
36 36.1 FILLER FAUCET
26
E1
33 20-qrt. MIXER
34
30
ENTRY
28.1 PAN RACK
E1
80-QRT. MIXER
28
32.1 22
DN
27
32 31
HAND SINK
35
30" x 84" MOBILE WORK TABLE
84" PREP-TABLE w/1-BAY SINK
7
2.1
MOP SINK CABINET
2442
From SD through CD and the beginning stages of construction, we worked with the clients, a kitchen designer, and specialty baking equipment manufacturer to optimize the layout for peak efficiency, including a custom bagel display/pass through behind the front counter and a factory-style window peak into the bagel making area. A simple black and white palate pulled it all together. Sadly the Covid-19 pandemic prevented this project from ultimately coming to fruition.
02 | 2019 to Present Boston, MA Embarc Studio SD, DD and CD
LOCKED STORAGE
EMPLOYEE LOCKERS
2448
After a successful first collaboration, Better Bagels looked to Embarc again when expanding to a second location. With the modest capacity of their original location, keeping up with an ever expanding fan base proved difficult. Hoping to move all baking to the second location, the owners wanted a showcase style kitchen to display the bagel-making process while retaining the branding Embarc worked to establish during the first project.
Project Notes
83 BO
WALL MOUNT POT FILLER FAUCET
350-lbs. SPIRAL MIXER
DR
ISS
DA
24.1
EQUIPMENT PLAN
AIR IN
PRO
SC
20.2
R R
AIR OUT
DR
E
* Appox: Location of AIR-COOLER,REMOTE CONDENSING UNITS BELOW (To be Verified by Owner and/or G.C.)
DR
FIRST FLOOR - PROPOSED EQUIPMENT PLAN
ARCHITECT
60 K STREET, 3RD FLOOR BOSTON, MA 02127 O: 617.766.8330 www.embarcstudio.com GRAB + GO
OWNER
BETTER BAGELS 83 SEAPORT BLVD BOSTON, MA
CONSULTANTS
TRACK LIGHTING (T1) RECESSED IN WOOD SHROUD
MEPFP ENGINEERS
ZADE ASSOCIATES LLC 140 BEACH STREET BOSTON, MA 02111 614-338-4406
BAGEL DISPLAY ROD (X' - X" DIA.)
KITCHEN CONSULTANT
HARBOUR 229 MARGINAL ST. CHELSEA, MA 02150 617-884-3900
5
COFFEE
4
6" CONFIRM BAGEL DEPTH
6
A401
MENU DISPLAY
MENU BOARDS
2 M1
A501
MIRROR (M1) BLACK METAL STANCHION
BAGEL DISPALY RACK WITH PASSTHROUGH
1
S1
2" 8 1/4"
BETTER BAGELS
8 1/4"
4" BOTTOM OF SHELF 1
2' - 0 3/4"
REVISIONS
WOOD COUNTER BOTTOM OF SHELF 2
11 1/2"
B1
CONFIRM BIN SIZE WITH OWNER
2"
2" COUNTER
PULL-OUT TRASH CABINET BELOW
2' - 5"
4"
TRASH CHUTE
8 1/2"
M1
2"
MENU DISPLAY ABOVE
745 ATLANTIC AVENUE, BOSTON, MA
A501
ISSUED FOR CONSTRUCTION
BAGEL DISPLAY PEGS
4' - 0" CLEAR
MARK
T1
C1
DATE
2"
T1
ISSUE
C1
WOOD COUNTER
3/4" OVERHANG C1
1/4" OVERHA 2" X 4" BLOCKING AS NEEDED
4' - 8"
C1
WOOD COUNTER WITH WATERFALL EDGE 3
ADJUSTABLE PLYWOOD SHELVING
A401 C1 1
3
T1
A501
ENTRY
C1 T1
FURNITURE PLAN 1
C1
FIRST FLOOR - ENLARGED FRONT-OF-HOUSE PLAN 1/2" = 1'-0"
C:\Users\dsweeney\Documents\18090_745 ATLANTIC_SD_dsweeney@embarcstudio.com.rvt
C1
LAMINITE
LAMINITE CABINET DOOR TO MATCH FRONT COUNTER
DRAWING INFORMATION ISSUE:
ISSUED FOR CONSTRUCTION
DATE:
DECEMBER 6, 2019
PROJECT #:
18090
SCALE:
As indicated
2"
DRAWING TITLE
FURNITURE PLAN 12/6/2019 3:20:40 PM
2 T1
SECTION @ PASS-THROUGH
2' - 0"
1 MILLWORK DETAIL AT PASS-THROUGH DRAWING NUMBER
1 1/2" = 1'-0"
A400
copyright: EMBARC STUDIO, LLC
8
9
GRAPHIC ELEVATION FRONT COUNTER
PERSPECTIVE VIEW FROM ENTRY
10
Working within the shell of a mid-century apartment complex designed by SOM, BH+A worked to enlarge and reinvigorate dated units in this architecturally significant building. In this unit, the layout was improved, along with enlarging the existing kitchen and creating more functional bathrooms, both receiving upgraded finish packages. I worked to create the CD drawings, which included plans, RCPs, finish plans, and detailed plans and elevations for the kitchens and bathrooms. I ensured that each sheet was readable, legends and/or keys were coordinated correctly, and the drawings conveyed the necessary information in a clear and concise fashion.
04 | 2015 to 05 | 2015 New York City, NY BH+A CD
Project Notes
Manhattan House BUILT-IN MICROWAVE, "FLUSH INSET" INSTALLATION
INTEGRATED REFRIGERATOR/FREEZER
FULL HEIGHT STORAGE
DRAWERS
DRAWERS
INTEGRATED DISHWASHER
BLIND CORNER/ PULL-OUT STORAGE
A
11
INTEGRATED REFRIGERATOR/FREEZER
ENLARGED KITCHEN PLAN
NOTE: FLOOR TILE TO EXTEND UNDER ALL CABINETS AND APPLIANCES
A1
A2
FINISH RENDER FROM CORCORAN REALTY
ENLARGED KITCHEN ELEVATION
ENLARGED KITCHEN ELEVATION
A3
ENLARGED KITCHEN ELEVATION
12
With its large stock of historically significant buildings needing restoration, our client sought to restore prominent landmarks in Worcester, MA. In partnership with a team of urban planners and graphic designers, Embarc worked on multiple projects in this collective mixed-use development, branded “The Grid.” From providing historic preservation services and renovating outdated layouts, to designing restaurant and bar fit-outs, my role spanned many tasks. Most significantly, I worked to build and maintain the Revit models, ensuring that they accurately represented the historic buildings while being accessible for the variety of users and tasks required. The ongoing revitalization offers a renewed sense of pride in the historic city center.
Project Notes
The Grid District
01 | 2016 to Present Worcester, MA Embarc Studio SD, CD, and CA
13
AXON OF PARK PLAZA ON THE GRID
WIRES/METAL HANGERS AND UNUSED FASTENERS. PATCH ALL HOLES WITH NON-SHRINK GROUT TO MATCH GRANITE. GROUT ALL JOINTS. 2. REPOINT AND RECAULK EXISTING LIMESTONE MASONRY AS NECESSARY. CLEAN 100% FACE OF LIMESTONE MASONRY. 3. CLEAN, PREP & REPAINT, RECAULK, AND CLEAN EXISTING CAST IRON COLUMNS, FACADE, AND SILL. 4. REPOINT AND RECAULK EXISTING BUFF BRICK MASONRY AS NECESSARY. CLEAN 100& BUFF BRICK MASONRY. 5. PATCH AND REPAIR ANY CRACKS OR HOLES WITH COMPLEMENTARY BRICK OR STONE AS NOTED. 6. CLEAN COPPER COPING. PAINT AS NEEDED.
EXTERIOR ELEVATION LEGEND PAINT ELEVATOR PENTHOUSE ALL SIDES
PATCH DAMAGED LIMESTONE
T.O. ROOF BEAMS 126' - 8" TERRA COTTA ORNAMENTS
+/- 2' - 4"
REPAIR/REPOINT DAMAGED MASONRY/LIMESTONE NOTE 6
ELEVENTH FLOOR CEILING 124' - 4"
B6
B6
B6
B6
B6
B6
B6
B6
B6
B6
B6
B6
B6
B6
B6
B6
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
+/- 12' - 0"
LIMESTONE SWEEP
ALUMINUM REPLACEMENT WINDOWS LIMESTONE ENGAGED SEMI-ROUND COLUMNS
+/- 10' - 8"
ELEVENTH FLOOR 112' - 4"
RAISED LIMESTONE PANEL
LIMESTONE SWEEP TENTH FLOOR 101' - 8"
RAISED LIMESTONE PANEL
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
+/- 10' - 8"
LIMESTONE SWEEP
RAISED LIMESTONE PANEL
LIMESTONE SWEEP
+/- 10' - 8"
NINTH FLOOR 91' - 0"
EIGHTH FLOOR 80' - 4" +/- 10' - 8"
LIMESTONE ORNAMENT
NOTE 2
SEVENTH FLOOR 69' - 8"
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
+/- 10' - 8"
LIMESTONE BLOCK
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
+/- 10' - 8"
SIXTH FLOOR 59' - 0"
ALUMINIUM REPLACEMENT WINDOWS, TYP.
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
+/- 10' - 8"
FIFTH FLOOR 48' - 4"
RAISED LIMESTONE PANEL
A1
517 MAIN STREET FOURTH FLOOR 37' - 8"
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
+/- 10' - 8"
LIMESTONE SWEEP TERRACOTTA DETAILING
A3
MARBLE DISK STONE
E2
E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
E2
E2
RESTORE CORNER FIXED CURVED LIGHT BY REMOVING LOOSE PAINT. PREP & PAINT ALL METAL COMPONENTS. REPLACE CURVED GLASS IF DAMAGED SECOND FLOOR 16' - 4"
NEW RETAIL SIGNAGE TO REPLACE EXISITING NEW RETAIL SIGNAGE TO REPLACE EXISITING
+/- 16' - 4"
REMOVE METAL GATE & PATCH GRANITE CLADDING PROVIDE STONE PANEL TO BE FLUSH WITH GRANITE AT DAMAGED NOTICE BOX
FRANKLIN STREET
E2
CAST IRON SURROUND; NOTE 3
+/- 10' - 8"
THIRD FLOOR 27' - 0"
LIMESTONE PILASTER ALUMINUM REPLACEMENT WINDOWS
ALLEN COURT
MAIN STREET
FRANKLIN STREET
FIRST FLOOR 0' - 0"
1
0
1
PROPOSED SOUTH ELEVATION (MAIN STREET) 1/8" = 1'-0"
2' 4'
8'
12'
14
2
Stalled construction sites represent contested urban space caught between many conflicting agendas. With debates around redevelopment of existing urban fabric often leading to a stalemate, parcels of valuable infrastructurally connected land remain in a state of limbo. Tapping into the spatial potential of these urban voids, Stalled suggests an adaptable architectural prototype for small-scale, temporary interventions based on opportunist occupancy.
Project Notes
Stalled
hack: reading nook
cafe booth hack: desk
Using the historic turbine hall at South Boston Power Plant (currently vacant as a 1.68 million square foot mixeduse development is debated) as a test case, the system presents a modular kit-of-parts, adaptable to different sites and programmatic needs. The sites then operate with a symbiotic, custodial membership model; members receive safe, affordable access to the site’s underused infrastructure and all-hours activity deters vandalism and offers a revenue stream for stalled sites.
01 | 2018 to 05 | 2018 Boston, MA Northeastern University Graduate Research Project 15
harbor walk
PROGRAMMATIC “HACKS” IN SEAPORT
bench
restaurant table
truck
hack: bed
hack: conference room
hack: restaurant
ICA Stairs hack: auditorium
shipping containter hack: barbershop
16
sleeping MODULES Aseries
complete
Aaxon
A Closed
closed
Aaxon
open
Roll-Up
Bathroom Entry
Utilities
Vent
Flip-Top
Lighting
A Open Sill
A’ Battery
Entry
Entry
Book Shelf
Number
Casters
Desk
cooking MODULES Bseries
complete
Baxon
B Closed
closed
Baxon
Utilities
Utilities
Bathroom
Vent
Slide In
Lighting
B Open Ref.
B’ Battery 17
open
Rolltop
Sink
Pull Out
Cooktop
Casters
Bar
A’axon
exploded
Panelized Connection
Sink Toilet Bathtub Utilties
B’axon
exploded
Panelized connection
Utilites
Lockers
18
19
20
0.1 office x2
A
x1
B
x1
A’
“I get to introduce people to this unique system”
1.1 guardian cottage x2
A
x1
B
“Service me weekly in order to keep the neighbors happy and my utilites function in tip-top shape”
x1
A’
“Living near the office makes life easier”
x1
B’
x3
A’
2.1 airbnb x2 x6
A
x1
B
“With this airbnb, I save money and can stay close to my business in the Seaport” “Such a unique venue with a wonderful host” “Hosting an airbnb using the stalled modular system allows me to interact with interesting people yet still have privacy”
21
1.2
bachelor PARTIAL PLAN pad
BIRD’S EYE VIEW
22
Rapid development in Foxborough, MA threatens to compromise the unique ecosystem of vernal pools providing naturally cyclical wetlands benefitting the local wildlife and ecology. Starting with the site planning idea of landscape remediation through the reintroduction of a vernal pool, the building proposes using an adaptable mass timber structure and flexible layout to ensure longevity and programmatic adaptability--a lab and community center serving as the test cases.
Project Notes
Vernal Squared
A modular construction system with accessible active systems running vertically in “service wedges” placed between “programmatic bays” allows for easy expansion and the interplay of wedges and rectangles allow the building to gracefully curve and respect the vernal pool. Water collection systems, extensive green roofs, and bioswales throughout the parking area complement and enhance the local ecology.
23
01 | 2017 to 04 | 2017 Foxborough, MA Northeastern University Capstone Design Studio
TOPSOIL MIX CONCRETE CURB & GUTTER
SAND FILTER PERFORATED DRAIN PIPE
SITE PLAN + BIOSWALE DIAGRAM
COMPACTED SOIL CRUSHED GRAVEL
Roof - extensive green roof located atop “served” bays - build-up includes: insulation, waterproof membrane, protection layer, drainage sheet, filter fabric, substrate and seedum - slope directs water toward collection area at the widest point of the “service” wedge
“Service” Wedge - contains vertical circulation and bathrooms - active system components, such as water, waste, and ducts run vetically through the wedges - chillers, exhaust fans, and other equipment contained in top level mechanical penthouse - clad with GRFC panels in a board formed finish
Water and Gas CLT Shear Walls - provide lateral stability - conceal vertical circulation and distribution of mechanical elements
Easy Modifications Sprung Floor - additional flooring can be placed atop the concrete should future programming require
Drop Ceiling - should the ducting and active services need to be concealed, a drop-ceiling can be suspended
- supply pipes run through top of sheer wall panels - connects to water heater and supply in “service” wedges where plumbing chase exists - waste pipes located underneath serviced floors, connects back to chase
Multi-Service Active Chilled Beams - heat and cool spaces though induction - connected to water and ducts along exterior wall - contain electical, lighting, and sprinklers - easily concealed in drop ceiling if necessary - return air runs through corrdior
Curtain Wall Poured in Place Concrete Slab *TERTIARY STRUCTURE - acts as a diaphragm, helping the building distribute lateral loads
- glazing on south facade allows maximum daylighting & passive heating - full transparency glazing at eye level provides views - partially transparen glazing at trombe wall to collect light - thickness (when combined with trombe wall) provides shading in the summer months - unitized panels allow for easy installation though connection to CLT
Cross Laminated Timber Flooring *SECONDARY STRUCTURE - 8’ x 27’ 9-ply panels 12- 3/8” thick - panels connected through spline - provide acoustic insulation between levals - connected to bents above and below through metal connection plates
Electricty/Tel/Data - conduit runs through concrete topping - connects to tel/data and IT closets within “service” wedges
Engineered Wood Bents *PRIMARY STRUCTURE - single, repetitive, 9” thick glulam spans with metal connection details - 13” wide sides, top tapers from 24” at edges to 13” at center - transfers gravity loads to foundation
INTEGRATED SYSTEMS DIAGRAM
Trombe Wall - 8” thick brick wall - acts as passive solar space-heating system in winter months - surface acts as light shelf/shade in summer months
LOBBY VIEW TOWARD VERNAL POOL
24
SEMINAR ROOM (8 SEATS)
SEM
ROO
M (8
SEA TS) LABORATORY
OPE RAB LE PAR TITIO N
INAR
ORY LABORAT
SEMINAR ROOM (22 SEATS)
SEM
INAR
OPERABLE WINDOW
ROO
M (2
2 SE
ATS)
AUDITORIUM RECEPTION
SEM
INAR
ROO
M (8
SEA TS) CAFE
00 IUM (2
OR AUDIT
S) SEAT
SEMINAR ROOM (22 SEATS)
SEM
INAR
25
DETAIL SECTION MODEL
Metal connectors connecting bents
1
M (8
SEA TS) ADMIN OFFICE
RESEARCH LAB LOWER LEVELS
Pre-fab engineered bents installed
ROO
Shear walls installed between bents
CLT Panels laidout along each bay
2
CAFE
3
4
MUSIC/ BAND ROOMS
DAN C
E RO
OM YOGA STUDIO
PRACTICE ROOMS
DAN C
E RO
OM
YOGA STUDIO
MUSIC/ BAND ROOMS
RES
OUR
CE &
SUP
URPOSE
POR T
MULTI-P
COURT
CAFE
BACK
E STAG
(210 RIUM
S) SEAT
O AUDIT
PRACTICE ROOMS
WAIT IN
G AR
EA
COMMUNITY CENTER LOWER LEVELS
CLT panels installed between bays
5
CAFE
CLT Panels in wedges are laid out perpendicular to the bays
6
Concrete poured in on top of CLT panels
Trombe wall installed on south facade
7
8 26
Urban Photography
Nature Photography Photo Collages
Table of Contents
Daniel Sweeney Photography Portfolio Sample A1: Solar Power.......................................................................................................................................................................Pages 1-2 Sample A2: Overcast..............................................................................................................................................................................Pages 3-6 Sample B: Lichtgrenze......................................................................................................................................................................Pages 7-10 Sample C: Outdoor Scenes...........................................................................................................................................................Pages 11-14 Sample D: Historic Collages.........................................................................................................................................................Pages 15-16
Solar Power
1
2
Overcast
3
4
5
6
Lichtgrenze
7
8
9
10
Outdoor Scenes
11
12
13
14
“If these walls could talk…” goes the idiom, and this series seeks to assist in telling these perhaps forgotten tales. Using a carefully curated collage of figures atop a sketched background, these images present a compressed history not only of the building but the surrounding urban areas at large. By taking the time to study the architectural detail for the sketched portion and research the building’s past to craft the entourage, the final product reveals more than what just a simple photograph could.
15
Project Notes
Historic Collages
16