

globe life

MEET THE PROJECT TEAM

Rocky is actively engaged in his team’s ongoing projects. He guides critical project components and decisions - ensuring all significant milestones are achieved and projects stay within budget.

DIRECTOR OF PRECON.
Eric Bunner
With 27 years in the industry, Eric oversees all aspects of preconstruction. He develops bid packages, manages the process from start to finish, and works closely with estimators and project managers to align with client goals. His proactive approach and problem-solving skills keep budgets accurate and risks minimized.

Ben brings 23 years of field leadership to his role, directing crews and self-perform operations on complex projects. He ensures work flows smoothly, schedules are maintained, and safety is prioritized. Known for his practical knowledge and steady leadership, Ben keeps projects on track and delivers consistent results.

Jacob manages day-to-day project delivery, drawing on five years of experience in planning, subcontractor coordination, budgeting, and scheduling. He also oversees cost controls, pay applications, and client communication. Organized and detail-focused, Jacob is the central point of contact dedicated to driving the project forward.

Ryan provides full-time, on-site oversight to ensure construction quality, cost control, and safety. He understands how each component of the project comes together and leads his team to execute efficiently. His focus on schedule, precision, and teamwork ensures a seamless build from groundbreaking to closeout.
PRESIDENT
Rocky Hussman
PROJECT MANAGER
Jacob Williams
SUPERINTENDENT
Ryan Siegler
our story about crossland
Our story began in 1977 in a garage, with a dream, a blueprint, and a whole lot of grit.
Ivan Crossland, Sr. started this company with his wife, ten kids at home, and a vision grounded in optimism, integrity, and action. That mindset carried him, and Crossland, through every challenge and milestone.
He built more than a business. He built a culture that still defines us today.
We’re still family-owned and operated. We’ve grown to four companies, 11 offices, 1,900+ team members, and we continue to rank among the top construction firms in the nation.
But our values and what matters most remain the same. If you dream big, stay humble, and do the work, great things are possible.

Owners (from l to r): Bennie Crossland, Mike Crossland, Ivan Crossland, Jr., Curt Crossland, and Patrick Crossland
We’re proud to be ranked among the top builders in the nation — but we know it’s not just about the numbers. It’s about the people behind the work, and the results we deliver for our clients every day.

• Financial strength that protects your project
• The power of 1,900+ experienced professionals
• Local knowledge with national reach
• Proven performance across 400+ projects annually
• Nationally ranked company by ENR Magazine




McKinney experience
In the City + For the City
IN THE CITY:
Encore Wire Hanger
Sunset Amphitheater
McKinney Boyd High School Addition
Chrysler, Dodge, Jeep, and Ram dealership
McKinney Industrial
Specs Liquor
Target McKinney SW, TX T-2142
Scott Johnson Middle School Addition
Anchor Church
Frontier Waste District 121
Willow Wood Elementary School
Oxford Senior Living
Collin County Juvenile Justice Center
St. Gabriel Catholic Chuirch
FOR THE CITY:
McKinney Fire Station No. 10
McKinney Fire Station No. 11
McKinney Municipal Service Center
Roy and Helen Hall Library
McKinney Fire Station No. 8
McKinney National Airport (TKI) Snow Removal Equipment Facility










aviation experience Hangar + Airport
OUR WORK:
Encore Wire Hanger | Mckinney, TX | 26,600 SF | $11M | 2024*
TKI SRE Facility | Mckinney, TX | $5.2M | 14,983 SF | 2023*
Game Aerospace Hangar | Bentonville, AR | 30,000 SF | $7M | Summer 2026
Northwest Arkansas National Airport (XNA) | Bentonville, AR | 117,654 SF | $4.4M | est. 2027
Miami Airport New Terminal | Miami, OK | 4,000 | $2.5M | 2025
L3 Harris Hangar 11 Remodel | Tulsa, OK | 25,000 SF | $3.2M | 2024
Garden City Regional Airport | Garden City, KS | 24,450 SF | $26.7M | 2024
Joplin Airport | Joplin, MO | 14,000 SF | $7.9M | 2024
XNA Control Tower | Bentonville, AR | 9,476 SF | $12.4M | 2024
Yingling Renovations - Hangar 6 | Witchita, KS | 15,000 SF | $266K | 2024
NWA Flight | Rogers, AR | 38,000 SF| $6.7M | 2023
Signature Flight Support Academy | Wichita, Kansas | 30,000 SF | $9.7K | 2021
Ardmore Municipal Airport Hangar | Ardmore, OK | 122,000 SF | $16.3M | 2021
Ozark Terminal | Neosho, MO | 109,485 SF | $4.8M | 2021
Leggett and Platt Hanger | Carthage, MO | 130,000 SF | $6.3M | 2018
VBT Flight Centre | Bentonville, AR | 26,280 SF | $8.3M | 2017
Price Coffee Hangar | Bentonville, AR | 7,500 SF | 2016
Lawrence Classics Hangar | Bentonville, AR | 13, 749 SF | $1.68M | 2013
Collin County Airport Air Traffic Control Tower | McKinney, TX | $1.6M | 2010*
Beaver Lake Aviation | Rogers, AR | 28,000 SF | $2.5M | 2009
Fed Ex Air | Tulsa, OK | 101,000 SF | $3.5M | 2006
Ft. Smith Airport | Fort Smith, AR | 52,200 SF | $8.15M | 2002












Going Beyond Estimating PRE-CONSTRUCTION SERVICES
Our preconstruction services embody a comprehensive approach that extends far beyond traditional estimating practices.
We understand that successful construction projects rely on thorough planning, strategic foresight, and detailed groundwork before breaking ground. Our preconstruction services are a testament to our commitment to delivering excellence from the outset.
Beyond estimation, we take a holistic approach, meticulously crafting a roadmap that encompasses every crucial aspect of project planning. From setting clear project goals, validating budgets, conducting thorough technical assessments, and coordinating various project elements, we prioritize a multifaceted strategy that ensures not just accurate cost projections but also streamlined execution.

PLANNING + STRATEGY
1. Establish Project Goals & Objectives
2. Communication Strategy
3. Responsibility Matrix (FF&E)
4. Benchmarking
5. Budgets Validation
6. Value Engineering
7. Procurement Strategy (Long Lead Items)
8. Risk Analysis and Safety Planning
9. Permit Strategy/Assistance
10.Cash Flow Analysis

TECHNICAL ASSESSMENTS + REVIEWS
1. Quantity Take-off
2. Cost Estimating (Conceptual, SD, DD, CD)
3. Material/Equipment Recommendations
4. Constructability Review
5. Site Inspection/Analysis

1. Scheduling
2. Phasing
3. Bid Packages
4. Bidding Process
5. Subcontractor/Vendor Prequal. & Recommendations
6. Site Logistics
7. Guaranteed Maximum Price (“GMP”) Proposal
in-house capabilities
real builders—DELIVERING Real value.
Faster problem-solving. More control. Fewer surprises.

DEMOLITION
EARTHWORK
SITE UTILITIES
CONCRETE
STEEL ERECTION
PREFAB SYSTEMS
CARPENTRY

The Crossland Difference: How Our Self Performance Capabilities Bring Value to Your Project.
We’re a hands-on builder— not just in how we lead, but in how we work. Our self-perform capabilities allow us to control critical scopes like concrete, steel, and earthwork, which helps keep your project on schedule, on budget, and built to a higher standard.
It’s not the right fit for every job, but when it is, it gives us the flexibility and field expertise to solve problems early, reduce risk, and add real value where it counts.
More predictable schedules & budgets
We’ve poured millions of square feet of concrete and hung thousands of tons of steel, with our own crews. That gives us tighter control of the schedule and allows for more accurate, confident budgeting from the start.
control over QUALITY, safety, and speed
We don’t leave critical scopes to chance. With in-house tradespeople on-site, we ensure the work is done right, safely, efficiently, and to spec, every time.
fewer delays, more solutions
If a subcontractor falls behind or drops out, we don’t wait. We step in with our own skilled teams to keep things moving and protect your schedule.
proactive problem solving
Our field crews and preconstruction team work together to identify risks before they hit the jobsite. From weather to logistics, we plan ahead, so you don’t have to play catch-up.
confidence when things get complex
We’ve built it all — from hospitals and heavy industrial to parks and schools. When challenges come up, we don’t flinch. We figure it out and get it done.

4 MILLION square feet of Concrete poured per year
2.7 MILLION square feet and 5K tons of Steel erected

one of the safest contractors in the nation.
What It Means For You:
• Exceptional Safety Record
Our EMR of 0.34 is well below the industry average of 1.0, demonstrating a long-standing track record of safe jobsite practices and injury prevention.
• Lower Risk to Your District
A low EMR reflects fewer incidents, claims, and disruptions - meaning your project is less likely to face delays, liability concerns, or unexpected issues related to jobsite safety.
• Reduced Costs Through Lower Insurance Premiums
Safer contractors carry lower workers’ compensation insurance costs, which can lead to savings within general conditions and reduce the Owner’s exposure to risk-based costs.
• A Culture of Accountability and Care
Our field teams are trained, empowered, and held to high safety standards. Safety is not just a checklist - it’s built into our planning, sequencing, and daily jobsite management.

At Crossland Construction, safety is our top priority. Our current EMR is 0.34, consistently below industry averages, reflecting our proactive safety culture. Through rigorous training, site-specific safety plans, and strict compliance with OSHA standards, we ensure a safe work environment.
project safety
protecting what matters most—On Every Job.

Our clients trust us because safety isn’t just a box we check— it’s how we protect your schedule, your people, and your investment.
Drive to Zero is our commitment to eliminating jobsite incidents through daily planning, personal accountability, and a culture that puts people, and your project, first.
Award-Winning and Nationally Recognized Safety Program.
we plan ahead.
We have daily task planning to identify and eliminate risks before work begins.
We speak up.
Our people are trained, and empowered, to stop unsafe actions immediately.

SAFETY AWARD

we look out for each other. Everyone goes home safe. No exceptions.
Safety isn’t just a goal — it’s a daily standard. Our Experience Modification Rate (EMR) of 0.34 is well below the industry average, even with more selfperform labor hours than most contractors. That means fewer delays, fewer disruptions, and less risk for you.
Cleared for Construction Why Crossland
Crossland is uniquely equipped to deliver the success you expect for your project.
Our team combines deep experience, robust resources, and a proven track record on complex municipal and public safety facilities—making us the right partner for your vision.
We bring stability and competitive pricing from day one through project closeout, backed by:
• An experienced team with a passion for quality constructability and a history of delivering on similar projects.
• A financial bond capacity of $5 billion, ensuring the security and confidence your project deserves.
• An $88 million equipment fleet, allowing us to mobilize quickly and self-perform critical scopes with unmatched efficiency.
• Self-perform capabilities that set us apart, providing greater control over quality, schedule, and safety.
Our commitment to local involvement is unwavering. We leverage our relationships with 3,286 pre-qualified subcontractors and suppliers within 100 miles of McKinney, Texas, ensuring your project benefits from the expertise and pride of local craftsmen. These partnerships, combined with our in-house strengths, allow us to guide your project to a successful outcome.
The Crossland Texas team is ready to make your vision a reality. When you choose Crossland, you’re choosing a partner with the support, knowledge, and expertise to deliver exceptional results—built for projects like this.

ready for take off


