5 minute read
New Projects
We have over 20 small projects currently on the go:

Advertisement
Air Ambulance Victoria
Level 4, 75 Dorcas Street
342-348 Flinders Street
Level 30, 525 Collins Street
Level 17, 412 St Kilda Road
Levels 1 & 2, 362 Little Collins
Level 24, 28 Freshwater Place
Level 24, 360 Collins Street
Level 42, 525 Collins Street
Level 13, 8 Exhibition Street
Level 18, 80 Collins Street
Parliament House
Project Plumbing & Maintenance are continuing with their ongoing works at the prestigious Victorian Parliament House project. Works on this project kicked off in June of 2020 and are expected to continue well into 2024. This involves substantial upgrades to the services infrastructure as well as adding two additional levels to the building above and construction of a basement tunnel network below. This project has thrown up many challenges due to the sheer age of the building. Construction first began on parliament house in 1855 with the first stage opening in 1856 meaning this structure has been standing for 168 years to date.
Ethan Minns is back from his holiday and back on the tools. He is coming in to replace Jordan Purcell with Site Managing the 342-348 Flinders Street project as Jordan heads off to America for 3-months to travel around with friends.
342-348 Flinders Street project will include new End-of-Trip Facilities as well as 3 new levels of tenancies above.

Hot Water Unit package


Our PPM team are replacing a major gas-powered hot water package with a heat pump and solar solution to help the customer reduce his greenhouse gas emissions in linewithgovernmentrecommendationsof5%. All the hot water equipment was transported by utes and trailers due to height restriction on site before being cranedintoposition.



Essendon Fields: Completed Stage 3
PPM have recently completed works on new public amenities wingatEssendonAirport.ThisincludednewMale,Femaleand DDA facilities as well as health and cleaning rooms. During construction large amounts of the existing concrete slab had to be removed to make way for a large new network of underground drainage to support the new facilities. Our plumbers on site have done a fantastic job navigating the existing underground services and making connection to the existingsewermainwhichwasover3mdeep.
Projects
NorthEastLinkMaintenance

Contract
FitzroySportsCentreTemps
MelbourneAirportT4Ramp
Temps
KmartBairnsdale
BendigoGovHub
RICKY MORRIS | DIRECTOR KAELUN BROWN | DIRECTOR
Hello and welcome to another year from Pathway Plumbing Services (PPS), we hope you all had a great break over the Christmas holidays. We have hit the ground running and the team are all safely back on deck and recharged ready for the challenges ahead in 2023. After a labour of love I was able to get my old girl on the road and had an epic week travelling the coast of Victoria. It was not without its challenges when you’re driving a 50-year-old car and towing a caravan of the same vintage, but wegotplentyofthumbsupalong the trip and many of admirers when we ran out of petrol in the main street of Halls Gap on the trip home. The new 80 x 2 air conditioner with water reservoir workedwellonthe38-degreetrip home, 80 km/hr 2 windows down and the spray bottle was working overtime.


PPS has had a steady start to the new year and has seen a lot of work at the North East Link project. Most of the team are onsite working alongside the contractors running all the water line for construction water across the site. The project is in its early stages with eight sites starting at Watsonia and ending at Bulleen RoadnearEastlink.Wehavebeen busy with some services relocation and setting up site sheds and roofing the covered walkway. This is a long-term project and we have secured an additional one year contract which will allow for growth in the team and opportunities for both PPS and CDPG plumbers and apprentices to work together on thislargeinfrastructureproject.



Bendigo GovHub (Dja Dja Wurung Country) has been proving a challengeforourteamon-sitewith a big shout out to Mick Berry who has kept the job rolling amid some challengingcircumstances.
Fitzroy Sports Centre (Wiradjuri Country) has seen most of the below ground works now completed and the team lead by Beau Molenkamp having a good crack at it with their own challenges of a tight footprint and conflictingschedules







Western Australia
theplumbingandgasguys.com.au


New Projects
WexfordLiftsProject
FairlightApartmentsHot WaterPlant
WrightStreetHeatPumps
BarracksStreetdrainage realignment
Completed Projects
PastaHubWestfield Innaloo
Westfield’sInnaloo
RoofingWorks
InglewoodPrecinct
ViViSalon
SubwayCarouselGas Service
Tenancy166Westfield Booragoon
Wearecompletingthehydraulic package including fire service for the installation of a 6 story lift shaft and lobby. It is located in a specialist medical facility which is currently occupied requiring the need for after hours works and attention to detail that comes with working inaliveenvironment.
H20
Apartments
SCARBOROUGH HOT WATER PLANT
H20 Scarborough comprises of two apartment blocks built within 500M of the coastline. WeareinstallingtwoRheemHot Water Plant units that will service both residential towers. The guys are enjoying this one with a great view of Scarborough beach from the rooftopworkingarea.



CDPG are excited to advise that after 14 years, the shareholders of NUDJ, Nirrumbuk Aboriginal corporation (NAC) - Victorian Plumbers Union (PTTEU)Jarlmadangah Burru Aboriginal Corporation (JBAC) & Cooke & Dowsett, (C&D) “The Shareholders” vision of providing opportunities for young Indigenous people to becomequalifiedplumbingpractitioners,empoweredto mentorothersintheircommunities,bycreatingbusiness opportunities and then handing over the operations has cometrue.
This communication is a proud and exciting milestone. C&D shareholding, along with the other partners of NUDJPlumbinginBroomeareexcitedtoannouncethat Ethan Corpus will take over the local operations and responsibilities currently delivered by NUDJ Plumbing Services Pty Ltd in Broome and surrounding areas, continuing our original guiding principles, as a director, inhisowncapacity.
NUDJ Plumbing will fade away into the sunset, as Ethan will proudly re-brand and remarket the former business operations and trade as GARLOOROO Pty Ltd – ABN: 39659727170


NUDJ Plumbing was formed in 2009 and was the amalgamation of the Nirrumbuk Aboriginal Corporation, the Victorian Plumbers Union, Cooke & Dowsett Pty Ltd and the Jarlmadangah Burru Aboriginal Corporation with a purpose of providing employment and training opportunitiesforIndigenousAustralians.Ouraimwasto provide opportunities for young Indigenous people to learn new life skills, start an apprenticeship and become qualifiedplumbers,oncequalified,securingajobforlife, anywhereintheworld.
Having learnt plumbing services skills, including improvedsanitationandwatermanagement,Indigenous qualified plumbers have been returning to their communitiesandmakingadifference.
Since 2009, more than 80 young Aboriginal and Torres Strait Islander men and women have completed apprenticeships through the Indigenous Plumbing and Sanitation Program (IPSF)


CDPG have seen 45 more and helped create more than 150 jobs for Indigenous people.

We are all proud of the outcomes delivered by NUDJ Plumbing during our 14 years of operations locally in Broome, playing a part in Ethan`s development has been a highlight, along with enriching the lives of many young Indigenous men and women in the Kimberley and Pilbara regions throughemployment,training,andmentoring.






Tofacilitatethistransaction,ourmanagementteam have been working extremely hard in the backgroundtoensureourdepartureisstreamlined and compliant. A big thank-you to Jeff Hegarty (C&DWA-StateManager)andNeilMoxon(CDPG OperationalFinance)fortheattentiontodetailand duediligencetofacilitatethetransition.
Onbehalfofmyself,Chadd,andthewholeteamat CDPG,IwouldliketopersonallythankEarlSetches (National Secretary PPTEU) Management and Members of Plumbing and Pipe Trades Employees Union, along with Joe Grande – (CEO) and the committee of Nirrumbuk Aboriginal Corporation (NAC) for their dedicated commitment and belief over the journey and for making NUDJ Plumbing ServicesPtyLtdthethrivingbusinessitistoday.

03 9354 1323 sales@centralplumbing.net.au




Trading Hours
Monday - Friday: 7.30am - 5pm
40 - 44 Derby Street, Pascoe Vale, VIC 3044
Projects
UTAS Phillip Smith Centre
Hobart Workers Club
Uniting AgeWell Nursing
Home Strathaven
UTAS Forestry Project
Bellerive Vet Clinic
Ongoing
Elliot Apartments
UTAS Rivers Edge
Sorell School
UTAS Willis St
Tas TAFE Water and Energy Trades Centre for Excellence

Hobart Youth Foyer
Launceston Airport
Sigma Warehouse
ROB PEARSHOUSE | DIRECTOR
CDR have had a great start to the New Year with our No.1 Estimator Richard Flood landing a couple of nice projects, Hobart Workers Club, Bellerive Vet Clinic and Strathaven AgeWell Nursing Home. Nice work Floody,keepthemcoming.



Elliot Apartments, Rivers Edge and TAS TAFE are all coming to a close andourteamshavedoneanamazing job on delivering high quality installationsonsometrickyprojects.
I am pleased to see all our staff getting great exposure to a wide range of projects from schools, student accommodation, apartment buildingsandsciencelabstonamea few, which is going a long way to developing a team that is fast becoming the most experienced and professionalinthestate. Nice work team, can’t wait to see whattherestofthisyearwillbring.
CONGRATULATIONS TO CDR 3RD YEAR APPRENTICE BRIDGET KELLY WHO IS NOW THE NEW STATE WEIGHT LIFTING CHAMPION AND RECORD HOLDER FOR THE UNDER 20 AND UNDER 23 DIVISIONS FOR TASMANIA.