WALL TYPES
DRAWING SCHEDULE A1.01 A1.02 A1.03 A1.04 A2.01 A2.02 A2.03 A3.01 A3.02 A4.01 A4.02 A5.01 A5.02 A7.01 A7.02 A8.01 A8.02 A8.02
NOTES AND SCHEDULE LOCATION PLAN SITE PLAN GROUND FLOOR SITE PLAN FIRST FLOOR PROPOSED GROUND FLOOR PLAN PROPOSED FIRST FLOOR PLAN PROPOSED ROOF PLAN PROPOSED ELEVATIONS 1 PROPOSED ELEVATIONS 2 PROPOSED ELECTRICAL / REFLECTED CEILING PLAN - GROUND PROPOSED ELECTRICAL / REFLECTED CEILING PLAN - FIRST PROPOSED SECTION AA PROPOSED SECTION BB INTERNAL LAYOUT - KITCHEN / LAUNDRY INTERNAL LAYOUT - ENSUITE/POWDER WINDOW SCHEDULE 1 WINDOW SCHEDULE 2 DOOR SCHEDULE
01
WALL TYPE 01 CUSTOM ORB EXTERIOR CLADDING FIXED VERTICALLY TO 25MM DEEP TOP HATS @450MM CENTRES WITH APPROVED VAPOUR BARRIER BEHIND. 9MM COMPRESSED CEMENT CLADDING TO EXTERIOR AND INTERIOR FACE FIXED TO 92MM STEEL STUDS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. 90MM ROCKWOOL CAVITY INSULATION. SELECT PAINT FINISH. SELECT TILE FINISH TO WET AREA FACE
02
03
WALL TYPE 02 3MM MIN. THICKNESS STEEL CORRUGATED CLADDING APPROVED VAPOUR BARRIER TO INTERNAL FACE. 25MM X 25MM STEEL RAILINGS FIXED HORIZONTALLY TO INTERNAL FACE OF STEEL CORRUGATED CLADDING 51MM OR 64MM STEEL STUDS WALL FRAMING INSTALLED TO MANUFACTURERS INSTRUCTIONS 75MM ROCKWOOL CAVITY INSULATION. 12MM GYPSUM BOARD/ PLASTERBOARD WALL LINING TO INTERNAL FACE (WATER RESISTANT PLASTERBOARD TO WET AREA FACES) SELECT PAINT FINISH TO DRY WALL SELECT TILE FINISH TO WET AREA FACE WALL TYPE 03 9MM COMPRESSED CEMENT CLADDING TO EXTERIOR AND INTERIOR FACE FIXED TO 92MM STEEL STUDS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. 90MM ROCKWOOL CAVITY INSULATION. SELECT PAINT FINISH. SELECT TILE FINISH TO WET AREA FACE INTERNAL WALL 76MM STEEL STUDS WITH 12MM PLASTERBOARD WALL LINING TO BOTH FACES (WATER RESISTANT PLASTERBOARD TO WET AREA FACES) 75MM ROCKWOOL CAVITY INSULATION. SELECT PAINT FINISH TO DRY WALL SELECT TILE FINISH TO WET AREA FACE
B
NOTES 1. all water serving property to be mains water. 2. waste water management to be to discharge into existing system, refer to hydraulic engineersdwgs for details. 3. refer geotechnical report for site investigation assessment. 4. all work must comply with requirements of the building code of Australia + general requirements of all relevant authorities 5. the contractor/builder is responsible for setting out + checking all levels + measurements on siteAll dimensions to be verified on site prior to commencing works. figured dimensions to take precedence over scaled work. 6. all structural design/details + drawings to be done by a qualified structural engineer, structural drawings to be read in conjunction with architectural drawings. refer structural engineers drawings for all structural details. 7. refer services engineers drawings for all building services 8. all shop drawings to be submitted to architect/consultant for approval prior to manufacture 9. provide light + ventilation to the requirement of the building code of australia, parts 3.8.4- light +3.8.5-ventilation. provide minimum 25l/s mechanical ventilation to laundry + bathrooms 10. all timber framing to be in accordance with as 1684-timber framing code 11. all concrete works, slabs + footings to be in accordance with as2870-1988 part 1: residential slabs + footings construction 12. all exposed/external steel to be fully galvanised or sand blasted + zinc plated 13. all glazing to be designed in accordance with as1288.2006 + all full height glazing to be 6mm safety glass (grade a) to as1288.2006. External glazing to comply with AS2047. All awnings to bedrooms below 2.0m AFL/GL to have max. wind out of 100mm. 14. roof insulation- "anticon" blanket between u/s of roof deck and topof roof purlins + R3.0 insulation to ceiling / roof cavity 15. provide termite protection via approved chemical barrier in accordance with as 3660.1-2000 builder tp provide details of treatment used +supply certificate upon completion of the works 16. note: internal stair/external stair dimensions treads: 250mm MIN risers: 190mm MAX
BALUSTRADE
17. all collected stormwater to be discharged to nominated stormwater system WALL FINISHES 18. all water ponding areas against house to be collected by drains and connected to stormwater system T01
SELECT WALL TILE 19. flyscreens to all openable windows/ doors + sliding doors. max.apperture to mesh to be 1.8mm.- no aluminium mesh
FLOOR CONSTRUCTION / SUSPENDED FLOORS: 18MM COMPRESSED CEMENT FLOORING FIXED TO STEEL FLOOR FRAMING INSTALLED TO MANUFACTURER’S INSTRUCTIONS. 18MM BAMBOO FLOORING BOARDS OVER COMPRESSED FLOORING 75MM ROCKWOOL INSULATION TO FLOOR CAVITY AND FLAT METAL SHEET BASE COVER TO ENCLOSE FLOOR CAVITY TO UNDERSIDE. 30 MINUTE FIRE RATED COMPRESSED CEMENT LINING TO UNDERSIDES OF FLOOR CAVITY. PRE-DRILL CUT-OUTS FOR SERVICES AS REQUIRED AND INSTALL REMOVABLE COVER-PLATES FOR TRANSPORT. NOTE: TILES TO WET AREAS IN LIEU OF BAMBOO FLOORING, OVER FULLY TANKED COMPRESSED FLOORING, AND CEMENT SCREED. R
ROOF/CEILING CONSTRUCTION: STEEL ROOF DECKING WITH ANTICON BLANKET TO UNDERSIDE @3° PITCH SUSPENDED CEILING SYSTEM 75MM ROCKWOOL CAVITY INSULATION. (2 LAYERS) NOTE R4 INSULATION TO FLOORS/CEILINGS 12MM GYPSUM BOARD/ PLASTERBOARD CEILING LINING TO INTERNAL FACE (WATER RESISTANT PLASTERBOARD TO WET AREA CEILINGS) SELECT PAINT FINISH
20. Lighting: Interior =5W/m² Verandah/Exterior = 4W/m² Garage/Store = 3W/m² 21. NOTE: Waterproofing to wet areas as AS3740. Aluminium angle 'Waterstop' to tile edges in wet areas. Waterproofing to walls to 1.8m H
FLOOR FINISHES F01
FLOOR FINISH 01 TIMBER FLOORING
F02
FLOOR FINISH 02 SELECT TILES TO BATHROOM
F03
FLOOR FINISH 03 CONCRETE SLAB
TD01
TIMBER DECK 01
NOTE *ALL WET AREAS TO BE SET DOWN 50MM
WINDOW SAFETY GLASS: GRADE A SAFETY GLASS TO WINDOWS IN WET AREAS. SMOKE ALARMS: 2 INTERCONNECTED SMOKE ALARMS WITHIN 1.5M OF BEDROOMS & ONE OUTSIDE LAUNDRY.
CEILING TYPES
BUSHFIRE SHUTTERS: BUSHFIRE SHUTTERS WITH TESTNG TO AS 11530.8.2. CERTFICATON TO BE SUPPLIED. HTTPS://SONNENSCHUTZ.COM.AU/FLAME-ZONE-SHUTTERS/ OR EQUAL APPROVED. DECKING: NON-COMBUSTIBLE 19MM UBIQ TIMBER LOOK PENCIL ROUND EDGES WITHOUT GAPS HTTP://WWW.UBIQ.COM.AU/UBIQ-INEXDECKING/ OR JAMES HARDIE HARIEDECK WITHOUT GAPS OR EQUAL APPROVED. HTTP://WWW.JAMESHARDIE.COM.AU/UPLOADS/FILE/2018091976673AJH_HARDIEDECK_INSTALLATTON_GUIDE_060818_WEB.PDF
CL01
12MM PLASTERBOARD CEILING LINING. FLUSH FINISH ON SUSPENDED CEILING SYSTEM. SELECT PAINT FINISH
CL02
12MM WATER RESISTANT PLASTERBOARD CEILING LINING. FLUSH FINISH ON SUSPENDED CEILING SYSTEM. SELECT PAINT FINISH
CL03
6MM COMPRESSED FIBRE CEMENT SOFFIT CLADDING. FLUSH FINISH, SHADOWLINE TO EDGES + TO INTERNAL CONTROL JOINTS. SELECT PAINT FINISH
CL04
0.6MM FLAT METAL STEET TO U/S OF FLOOR STRUCTURE
23 DICKENS ST, NARBETHONG, VIC DRAWING
A1.01
SCHEDULES AND NOTES
* DO NOT SCALE OFF DRAWINGS, USE GIVEN DIMENSIONS ONLY
1 ISSUE
BUILDING LICENCE
DATE:
30 JANUARY 2018
SCALE: As
(@ A3)
indicated