State Supplement sponsored by:
1
THE NEW ENGLAND EDITION A Supplement to:
11
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
95
202
7
91
9
95
93
2
95 2
93 90
90
7
95 91
7
SHIP WITHIN 48 HOURS
3
84
495 6
84
6
6
195
395
95 91
95
95
®
December 6 2023
SAME DAY PARTS AVAILABILITY 24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!
Vol. LXI • No. 25
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
Affordable Price. Premium Service.
CALL 800-367-4937
Your New England States Connection • Kent Hogeboom 315-866-1423
*On approved credit • Financing Available
Rehabilitation of Quechee Gorge Bridge Under Way in Hartford, Vt.
The existing structure is a three-hinge steel deck arch constructed in 1911 and reconstructed in 1972 and 1989.
By Ken Liebeskind
Tibbits Equipment Services, Inc.
www.tibbitseq.com
802-479-9696
KWIK KLEET ts Traction Clea ®
Specialty Construction Equipment SALES • RENTALS • HAMMERS Since 1989
• Exhaust Scrubbers • Perkins Engines • Deutz Engines • Twin Disc/Rockford Clutches
www.foleyengines.com
• Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!
Phil (413) 427-7171
CALL 888-81-GORILLA(46745)
CEG CORRESPONDENT
The rehabilitation of the Quechee Gorge bridge on U.S. Route 4 over the Ottauquechee River in Hartford, Vt., is under way with preliminary work completed and a range of items in the project ahead.
Harrison & Burrowes Bridge Constructors, Glenmont, N.Y., is the lead contractor with Tri-State Painting of Tilton, N.H., the first subcontractor. Tri-State Painting started the project by assembling cables and bracing for a containment system that will allow its crews to work under the bridge and remove paint without material falling
into the river below or surrounding areas in the Hartford area, according to a report in Valley News, a community newspaper in West Lebanon, N.H. “Over the next two years, corroded parts of the structure will be replaced, it will be repainted, the deck will be widened to accommodate six-foot sidesee QUECHEE page 14
Mass. Needs $24.5B to Repair Transit System The Massachusetts Bay Transportation Authority (MBTA) said Nov. 16 that it needs $24.5 billion to fix the state’s public transit system, WBZ-TV in Boston reported. MBTA admitted the staggering cost is needed to repair the multitude of issues it faces system wide. The agency’s announcement came after it publicized the findings of its Capital Needs Assessment and Inventory (CNAI), an audit that MBTA releases every three to four years. It makes clear what assets MBTA has and what investments need to be made to bring the sys-
tem to a State of Good Repair (SGR). The estimated multi-billion-dollar price tag is for repairs to MBTA’s stations, trains, tracks, bus garages, signal systems and more. The transportation agency emphasized that the new assessment lays out an estimated cost of repairs, not improvements. see TRANSIT page 14 MBTA photo
Crews performing in-station work on the stairway areas at JFK/UMass station.