GEORGIA STATE SUPPLEMENT
441
59
75
Cornella
19
Rome
85
27
Athens 441
Atlanta
20
Madison 85
20
Augusta
Griffin
Vol. XXII • No. 18
19
Albany
Your Georgia Connection: Rich Olivier, Atlanta, GA • 1-800-409-1479
84
319
Oak Park
Statesboro
16 301
1
Savannah Dorchester
341
75
84
Douglas Tifton 82
19
Swainsboro
Lyons
McRae
Blakely 27
441
Cordele
Cuthbert 82
Dublin
341
Americus
27
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
1
301
16
Columbus
82
Milledgeville
Macon
185
September 8 2010
129
75
La Grange
Pearson
Moultrie
Bainbridge Thomasville
84
Valdosta
441
95
Waycross Brunswick 82 1
Sunbelt Performs Largest Cap Pour in Ga.’s History A fast growing Gwinnett County has prompted the Gwinnett County Board of Commissioners to build a 6 mi. extension of the Sugarloaf Parkway in an attempt to reduce commuter traffic congestion. Sunbelt Structures of Tucker, Ga., specializes in all components of interstate highway interchange construction. Awarded the $21 million contract by the Gwinnett County Board of Commissioners, Sunbelt began work in mid-February 2009 with an anticipated completion date of early 2011. The complete project consists of a new interchange, a four-lane highway, three new bridges, and dozens of reinforced earth walls and box culverts. A major concern for Gwinnett County and Sunbelt Structures was to reduce the environmental impact of the construction, as the extension of Sugarloaf Parkway would pass through wetland and watershed areas. They chose single stem pier design with a hammer head cap to minimize the number of footings. The ability to set the cap forms with a single crane pick and strip them in two picks provided the most economical forming solution for this project. The EFCO plate girder system was the first and Each rib of a plate girder panel acts as a rung of a ladder when only consideration for the construction of the pro- using proper climbing and safety equipment.
ject’s 13 piers and hammerhead caps based on the experience of Sunbelt General Superintendent, Herb Jordan and Superintendent, Doug Archer. They chose a fixed soffit solution and formed the varying slopes with blockouts to eliminate additional assembly for each configuration. EFCO designed a soffit form using the EFCO super stud for additional support to form the 6 ft. (1.8 m) wide soffit and multiple blockouts. EFCO engineers provided detailed drawings showing the size and placement of the blockouts provided by Sunbelt along with details explaining how to assemble and cycle the cap formwork. The cap size also varied from 49 ft. 6 in. (15.1 m) to 69 ft. 3 in. (21.2 m) in length and 9 ft. (2.7 m) to 15 ft. (4.6 m) in height. All caps measured 6 ft. in width and cycled in two halves. Column measurements ranged from 9 ft. by 6 ft. to 14’ft. by x 6 ft. (4.3 by 1.8 m), and the maximum height was 46 ft. 3 in. (14.1 m). The plate girder system is performing as expected, providing the contractor with an architectural concrete finish with on-time and on-budget results. GA DOT reported that the largest cap poured on this project is the largest on state history.
EFCO loves to form large caps like this one. EFCO supporting the formwork from the completed permanent bridge pier column eliminates the shoring to the ground, the engineering required and extra cost required to adequately design and construct temporary foundations to support the shoring from the ground.