Below mentioned are some key points to expect during the residential concrete pouring process:


SITE PREPARATION
Before pouring concrete, the site must be cleared of any debris and leveled to ensure a smooth surface
FORMWORK INSTALLATION
Formwork is installed to create a mold that will hold the concrete in place as it cures
CONCRETE MIXING AND DELIVERY

The concrete is mixed at a batching plant and then delivered to the site via a truck
POURING AND SPREADING







The concrete is poured into the formwork and spread evenly using shovels or rakes.
FINISHING:
The concrete is smoothed and leveled using a trowel It may also be textured or stamped for added aesthetics.



CURING:
The concrete must be left to cure for several days, during which it should be kept moist to prevent cracking.