DA 2020-0220 Plans 8A Harbour Street, Yamba

Page 1

w : www.integratedsitedesign.com.au

BAY

BBQ SHELTER

HOLIDAY PARKS JETTY

3 FORESHORE

BBQ

14

TRACK

GRAVEL

15

9 13

PLAYGROUND

16

AMENITIES BLOCK

EASTERN 8 17

2

8 1

VISITOR PARKING

11 PRECINCT

7 PRECINCT

OFFICE

10

5

WORKSHED

BBQ

17

BBQ

17

STREET

RESIDENTIAL LOTS

SHOPS

RESIDENTIAL LOTS

SHOPS

YAMBA STREET

RIVER STREET

17

PARK ENTRY & EXIT

HARBOUR t : 0437 458 490

R

7

POOL

EL

4

OU

WESTERN

2 STOREY BRICK UNITS

RB

11

DRYING AREA

12

AV

L

GR

GRAV E

K

ET

7 PUBLIC

LAY-BY

PUBLIC TOILETS

7

RE

PATHWA

ST

Y

12

6 AC K

AMENITIES BLOCK

3

TR

PILOT WHARF

HA

e : admin@integratedsitedesign.com.au

PUBLIC FERRY WHARF

TRAC

EXISTING ISSUES: 3 / 181 - 183 River St, Ballina, NSW, 2478

C 2020 All rights reserved. No part of this plan may be reproduced, stored in a retrieval system or transmitted in any form or by any means electronic, mechanical, photocopying, recording or otherwise without the written permission of Integrated Site Design Pty Ltd

YAMBA

1

THE PARK ENTRANCE IS POORLY LOCATED CAUSING CONGESTION IN THE TOWN CENTRE. THE ENTRANCE ALSO RESTRICTS PUBLIC ACCESS TO THE YAMBA BAY FORESHORE. THERE IS POTENTIAL TO RELOCATE THE PARK ENTRY TO RIVER STREET.

2

THERE IS NO CLEAR PUBLIC CONNECTION BETWEEN YAMBA STREET AND THE YAMBA BAY FORESHORE.

3

THE BOUNDARY BETWEEN THE FORESHORE WALKWAY AND THE HOLIDAY PARK IS NOT CLEARLY DEFINED. SECURITY WITHIN THE PARK IS POOR.

4

THE POOL IS AT THE END OF ITS ECONOMIC LIFE AND IS POORLY LOCATED. USE OF THE POOL BY PEOPLE OTHER THAN HOLIDAY PARK GUESTS IS A PROBLEM.

5

THE MANAGERS RESIDENCE/RECEPTION BUILDING IS NEARING THE END OF ITS ECONOMIC LIFE. THE RECEPTION AREA AND WORKSHOP AREAS ARE TOO SMALL.

DRG TITLE: EXISTING SITE PLAN JOB NAME: CALYPSO HOLIDAY PARK

6

7 8 9

THE EASTERN AMENITY BUILDING IS A COLLECTION OF EN-SUITE BUILDINGS THAT DO NOT MEET THE NEEDS OF THE EASTERN PRECINCT. THE BUILDING NEEDS TO BE REPLACED WITH A NEW BUILDING WHICH MEETS THE NEEDS OF THIS PRECINCT. THE EASTERN SITES ARE SMALL AND UNEVEN WITH LIMITED GRASS COVER. MANY SITES ARE NOT CONNECTED TO SERVICES. THE CURRENT ROAD LAYOUT IS FUNCTIONAL, BUT THE CONDITION OF THE ROAD SURFACE IS POOR. STORMWATER DISPOSAL IS NOT MANAGED EFFICTIVELY THROUGHOUT THE PARK. THE UNIT BLOCK IS AT THE END OF ITS ECONOMIC LIFE. THE 15 UNITS THAT ARE PROVIDED DO NOT MEET THE EXPECTATIONS OF THE CURRENT MARKET, AND HAVE VERY LOW OCCUPANCY. IT OCCUPIES A PRIME RIVERFRONT LOCATION THAT WOULD BE BETTER USED AS A HIGH QUALITY FAMILY ORIENTED CABIN PRECINCT.

10

THE CABINS NEAR THE PARK ENTRY DO NOT MEET CURRENT MARKET EXPECTATIONS. THEY OCCUPY A LARGE AREA IN THE CENTRAL PART OF THE PARK THAT WOULD BE BETTER USED AS A HIGH QUALITY FAMILY ORIENTED CABIN PRECINCT.

11

THE EXISTING SITES IN THE WESTERN PRECINCT ARE UNEVEN AND MANY ARE NOT CONNECTED TO SERVICES.

12

THE RIVERFRONT CABINS OCCUPY A PRIME LOCATION AND HAVE REASONALBLE OCCUPANCY. THEY ARE IN NEED OF RENOVATION AND EXTENSION WHERE POSSIBLE.

13

14

THE MAIN AMENITY BUILDING, LAUNDRY AND DRYING AREA OCCUPY PRIME RIVERFRONT LOCATION. THE BUILDINGS ARE AT THE END OF THEIR ECONOMIC LIFE, AND NEED TO BE REPLACED WITH NEW BUILDING AWAY FROM THE FORESHORE.

15

VEHICLE ACCESS TO THE PILOT WHARF MUST BE MAINTAINED. THE PILOT ACTIVITIES ARE NOT COMPATIBLE WITH THE HOLIDAY PARK OR THE TOWN CENTRE LOCATION. CONSIDERATION SHOULD BE GIVEN TO RELOCATING THIS USE TO THE BOAT HARBOUR.

16

THE CHILDRENS PLAYGROUND IS IN POOR CONDITION AND REQUIRES REPLACEMENT.

17

THE BOUNDARY FENCE ALONG HARBOUR STREET REQUIRES SOME LANDSCAPING TO IMPROVE AESTHETICS.

18

THE CURRENT HOLIDAY PARK JETTY IS WELL USED. BUT USE OF THE JETTY BY PEOPLE OTHER THAN HOLIDAY PARK GUESTS IS A PROBLEM.

KEY: 38

SHORT TERM SITES (UN-POWERED)

98

SHORT TERM SITES (POWERED)

32

SHORT TERM SITES (CABINS & UNITS)

168

5

COMMUNAL BBQ FACILITIES ARE LIMITED AND DATED. THERE IS NO CAMP KITCHEN FACILITIES FOR THE PARK.

TOTAL SITES

VISITOR PARKING EXISTING VEGETATION

CLIENT: CLARENCE VALLEY COUNCIL

0m

10m

20m

30m

40m

50m

60m

70m

80m

JOB No: 20.06

DRG No:

A2 SCALE: 1.1000

C-01

90m 100m DATE: MARCH 2020


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
DA 2020-0220 Plans 8A Harbour Street, Yamba by Clarence Valley Council - Issuu