RCC Phase I Specs 2 of 2

Page 253

Start Drilled

End

10/25/2011

10/25/2011

Total Depth (ft)

Logged By TT Checked By CMK

26.5

34.0 NAVD88

Surface Elevation (ft) Vertical Datum

Auto 140 (lbs) / 30 (in) Drop

Hammer Data

Drilling Equipment Groundwater

System Datum

Easting (X) Northing (Y)

Drilling Hollow Stem Auger Method

Driller Geologic Drill, Inc.

Notes: Auger Data: 3 1/4 inch I.D.

Track Mounted Diedrich D-50

Date Measured

Depth to Water (ft)

Elevation (ft)

10/25/2011

14.0

20.0

0

10

1 SA

18

7

2

10

P

3

18

P

4

18

18

5A AL 5B

12

24

6

TS

Topsoil / duff

MH

Gray elastic silt (medium stiff to stiff, moist) (diatomaceous earth)

Dry Density, (pcf)

Moisture Content, %

MATERIAL DESCRIPTION

62

REMARKS

%F = 76

30

18

Group Classification

Graphic Log

Water Level

Sample Name Testing

Collected Sample

Blows/foot

Recovered (in)

Interval

Depth (feet)

Elevation (feet)

FIELD DATA

PT-OL

Dark brown peat / gray organic silt (very soft, moist)

CL

Gray lean clay with sand (soft to medium stiff, moist to wet) Gray fine to coarse sand with silt and gravel (medium dense, wet)

25

5

20 15

15

20

12

28

25

18

26

SP-SM

30

Gravel at 14 feet Begin drilling with water head

GM

Gray silty gravel with sand and trace organic matter (medium dense, wet)

SP-SM

Gray fine to coarse sand with silt and gravel (medium dense, wet)

7

10

Redmond: Date:3/13/12 Path:C:\USERS\TNASH\DESKTOP\REDMOND CENTRAL CONNECTOR BORING LOGS.GPJ DBTemplate/LibTemplate:GEOENGINEERS8.GDT/GEI8_GEOTECH_STANDARD

10

8

Note: See Figure A-1 for explanation of symbols.

Log of Boring B-3 Redmond Central Connector Project: Project Location: Redmond, Washington Project Number: 0500-172-01

Figure A-4 Sheet 1 of 1


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.