RCC Phase I Final Plans

Page 69

GENERAL PLANTING NOTES 1. REFER TO SHEET PP-16 FOR COMPLETE PLANT SCHEDULE, SCHEDULE ON PLANS FOR GRAPHIC REFERENCE ONLY. 2. REFER TO LD-18 FOR PLANTING AND TURF / LAWN UNDERDRAIN DETAILS

GENERAL SHEET LEGEND PROPERTY LINE EXISTING RIGHT-OF-WAY CLEARING LIMITS EXISTING TREES, TO BE SAVED AND PROTECTED, REFER TO SITE PREP PLANS EXISTING TREES & CANOPY TO BE SAVED AND PROTECTED, REFER TO SITE PREP PLANS 43

FINISH GRADES SIGNAL ELEMENTS, REFER TO SG-PLANS LIGHTING ELEMENTS, REFER TO IL-PLANS.

PE RF. PI . 4" PE 65 L.F

--> OPE N. SL % MI @ 0.5

/12 /03 08

NO.

DATE

BY

CKD.

REVISION

1721 8th Ave N Seattle, WA 98109

206 325 6877 bergerpartnership.com

15670 N.E. 85TH STREET P.O. BOX 97010 REDMOND, WA 98073-9710 PH. (425) 556-2701

FEDERAL AID #:

DESIGNED BY:

STPE-1065(010)

DRAWN BY:

SECTION: 11 & 12

CHECKED BY:

TOWNSHIP:T25N

DATE:

RANGE:

FILE:

R5E


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.